Skip to content
PlanIndex Get alerts
Menu

Planning application

26/03567/ADFULL

105 Clifton Hill London NW8 0JR

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Details of the new French doors and windows pursuant to condition 4 of planning permission dated 14 April 2025 (RN: 24/08815/FULL). (Linked with 26/03586/ADLBC)

As published by the council, reference 26/03567/ADFULL

Timeline

Dates from the published record

  1. 1 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/03586/ADLBC Awaiting decision

    105 Clifton Hill London NW8 0JR

    Details of the new French doors and windows pursuant to condition 3 of Listed building consent dated 14 April 2025 (RN: 24/08816/LBC). (Linked with 26/03567/ADFULL)

    1 Jun 2026 0m away Conditions
  • 26/02823/TDD Decided

    103 Clifton Hill London NW8 0JR

    1 x dead horse chestnut: fell

    28 Apr 2026 16m away Trees
  • 25/07519/TDD Awaiting decision

    105 Clifton Hill London NW8 0JR

    1 x dead birch: fell.

    16 Oct 2025 26m away Trees
  • 25/07051/TCA Awaiting decision

    105 Clifton Hill London NW8 0JR

    Front T1 Gleditsia spp x 1 This 12m Gleditsia has a 15m wide canopy. The tree has previously been reduced but not for some time, its cyclical prune is now due. Suggested work- crown reduction - reduce the height by 2.5m - reduce the lateral growth by 2m - remove internal deadwood Rear T2 Silver Birch x 1 (Betula pendula / alba) This silver birch is stone dead. Suggested work:- fell to ground level Rear T3 Beech x 1 (Fagus sylvatica) This European beech has been reduced previously, its cyclical prune is now due. Suggested work:- reduce all round 0.5-1.5m leaving plenty of furnishing growth Rear T4 Cherry x 1 (Prunus spp) Reduce all round by 1-1.5m leaving furnishing growth

    1 Oct 2025 28m away Trees
  • 26/03204/FULL Awaiting decision

    105 Clifton Hill London NW8 0JR

    Variation of condition 1 of planning permission dated 14th April 2025 (RN:24/08815/FULL ) for the Alterations to fenestration, including replacement of windows; Installation of PV panels on roof; Installation of ASHPs within enclosure to side; Lowering of lower ground floor level and associated external alterations. Namely, the new proposal for the front lightwell stairs would involve less structural works so would not affect so much to the existing retaining walls and proposal to change the colour of the front entrance door (it applies only to the external face of the door) and garage door for contextual sensitivity, historically sympathetic tone suited to the building's age and architectural style

    14 May 2026 28m away Full applications
  • 25/08408/CLOPUD Awaiting decision

    95 Clifton Hill London NW8 0JN

    Alterations to the rear closet wing by the introduction of new widows.

    17 Nov 2025 33m away Lawful development

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications