Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

Awaiting decision Westminster 26/03376/ADFULL Approval of Details (Full PP)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Detailed completed Appendix A checklist from the Code of Construction Practice, signed by the applicant and approved by the Council's Environmental Sciences Team pursuant to condition 3 of planning permission dated 4th April 2025 (RN:22/08200).

As published by the council, reference 26/03376/ADFULL

Application record

Reference
26/03376/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
21 May 2026
Validated
21 May 2026
Ward
Marylebone

Site history

Applications at this address on the Westminster register

This site has had 15 applications since 2025: 7 approved, 0 refused.

  • 26/05792/ADFULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of Whole Life Carbon Assessment pursuant to condition 33 (B) of planning permission dated 16th July 2026 (RN:26/02205/FULL)

    Submitted 24 Aug 2026
  • 26/05793/ADFULL Decided

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Detailed Circular Economy Statement pursuant to Condition 34(B) of planning permission dated 16th July 2026 (Ref: 26/02205/FULL)

    Submitted 24 Aug 2026
  • 26/05720/ADV Decided

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Display of low-level non-illuminated advertisement on hoardings fronting Dorset Street measuring 2.44m x 16.09m; Baker Street measuring 2.44 m x 56.45m; Blandford Street measuring 2.44m x 39.61m; and Broadstone Place measuring 2.44m x 31.47m until 31 July 2027

    Submitted 20 Aug 2026 Advertising
  • 26/05568/NMA Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Amendments to planning permission dated 16th July 2026 (RN 26/02205/FULL) for the Variation of Condition 40 of planning permission dated 4 April 2025 (Ref: 22/08200/FULL) for, 'Demolition of the existing buildings and redevelopment above a retained basement to create a mixed-use scheme providing Class E commercial space (retail, restaurants, offices), a community space, and 17 residential units within a new building consisting of ground plus 7 storeys plus rooftop amenity for the commercial, and ground plus 7 storeys for the residential element, improvements to the public realm and pedestrian routes around the perimeter of the Site and along Broadstone Place, consolidated servicing, ancillary plant and storage, cycle parking, and other associated works'; Namely, Façade development and refinement; Internal re-configurations to the office building; Amendments to the building's roof plan; and Green Wall and amendments to Condition 48.

    Submitted 14 Aug 2026 Amendments
  • 26/02205/FULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Variation of condition 40 of planning permission dated 4th April 2025 (RN 15/00011/FULL) for the Demolition of the existing buildings and redevelopment above a retained basement to create a mixed-use scheme providing Class E commercial space (retail, restaurants, offices), a community space, and 17 residential units within a new building consisting of ground plus 7 storeys plus rooftop amenity for the commercial, and ground plus 7 storeys for the residential element, improvements to the public realm and pedestrian routes around the perimeter of the Site and along Broadstone Place, consolidated servicing, ancillary plant and storage, cycle parking, and other associated works. Namely, to amend the wording of Condition 40 (Tree Protection Measures).

    Submitted 1 Apr 2026 Full applications
  • 26/01718/MOD106 Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Request that the City Council agrees not to enforce the provisions of Schedule 1, Clause 1.1 of the legal agreement dated 4 April 2025 (Ref: 40020699) by allowing the Commencement of Demolition prior to the Stopping Up Order to facilitate the Development has been confirmed.

    Decided 25 Mar 2026 Conditions
  • 26/00566/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of mechanical ventilation systems pursuant to Condition 26 of planning permission dated 4 April (Ref: 22/08200/FULL)

    Decided 21 Apr 2026 Full applications
  • 26/00544/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of whole life carbon assessment prior to commencement of any work on site including all works of deconstruction and demolition pursuant to Condition 33(a) of planning permission dated 04/04/2025 (RN: 22/08200/FULL).

    Decided 18 Mar 2026 Full applications
  • 26/00488/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of Circular Economy Statement pursuant to Condition 34a of planning permission dated 4 April 2025 (Ref: 22/08200/FULL)

    Decided 29 Apr 2026 Full applications
  • 26/00484/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of tree protection pursuant to Condition 40 of planning permission dated 04 April 2025 (Ref: 22/08200/FULL)

    Decided 24 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 21 May 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 86 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

930 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Westminster

  • 26/05984/FULL Decided

    41 Sutherland Street London SW1V 4JX

    Replacement of front, side and rear windows with double glazed timber framed sash windows and replacement of a door with a double glazed timber framed door.

    Received 2 Sep, published by the council 11 Sep 2026 Full applications
  • 26/06134/FULL Decided

    Flat 10H Hyde Park Mansions Cabbell Street London NW1 5BG

    Replacement of front and rear second floor level windows with slim-profile double-glazed panels, retaining the existing window and door frames.

    Received 8 Sep, published by the council 15 Sep 2026 Full applications
  • 26/07258/FULL Awaiting decision

    16A Croxley Road London W9 3HL

    Installation of air to air heat pumps to offices and bedrooms.

    Received 22 Oct, published by the council 23 Oct 2026 Full applications
  • 26/07193/FULL Awaiting decision

    98 Victoria Street London SW1E 5JL

    Shopfront alterations. (Linked with 26/07194/ADV)

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/07187/FULL Awaiting decision

    Ground Floor Flat 151 Portnall Road London W9 3BN

    Erection of a single storey rear extension.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications