Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

Awaiting decision Westminster 26/05568/NMA Amendments

Works: Demolition

Relates to 26/02205/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Amendments to planning permission dated 16th July 2026 (RN 26/02205/FULL) for the Variation of Condition 40 of planning permission dated 4 April 2025 (Ref: 22/08200/FULL) for, 'Demolition of the existing buildings and redevelopment above a retained basement to create a mixed-use scheme providing Class E commercial space (retail, restaurants, offices), a community space, and 17 residential units within a new building consisting of ground plus 7 storeys plus rooftop amenity for the commercial, and ground plus 7 storeys for the residential element, improvements to the public realm and pedestrian routes around the perimeter of the Site and along Broadstone Place, consolidated servicing, ancillary plant and storage, cycle parking, and other associated works'; Namely, Façade development and refinement; Internal re-configurations to the office building; Amendments to the building's roof plan; and Green Wall and amendments to Condition 48.

As published by the council, reference 26/05568/NMA

Application record

Reference
26/05568/NMA
Category
Amendments
Status
Pending
Received
14 Aug 2026
Validated
14 Aug 2026

Site history

Applications at this address on the Westminster register

This site has had 15 applications since 2025: 5 approved, 0 refused.

  • 26/05792/ADFULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of Whole Life Carbon Assessment pursuant to condition 33 (B) of planning permission dated 16th July 2026 (RN:26/02205/FULL)

    Submitted 24 Aug 2026
  • 26/05793/ADFULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details a detailed Circular Economy Statement pursuant to condition 34 (B) of planning permission dated 16th July 2026 (RN:26/02205/FULL)

    Submitted 24 Aug 2026
  • 26/05720/ADV Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Display of low-level non-illuminated advertisement on hoardings fronting Dorset Street measuring 2.44m x 16.09m; Baker Street measuring 2.44 m x 56.45m; Blandford Street measuring 2.44m x 39.61m; and Broadstone Place measuring 2.44m x 31.47m until 31 July 2027

    Submitted 20 Aug 2026 Advertising
  • 26/03376/ADFULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Detailed completed Appendix A checklist from the Code of Construction Practice, signed by the applicant and approved by the Council's Environmental Sciences Team pursuant to condition 3 of planning permission dated 4th April 2025 (RN:22/08200).

    Submitted 21 May 2026 Full applications
  • 26/02205/FULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Variation of condition 40 of planning permission dated 4th April 2025 (RN 15/00011/FULL) for the Demolition of the existing buildings and redevelopment above a retained basement to create a mixed-use scheme providing Class E commercial space (retail, restaurants, offices), a community space, and 17 residential units within a new building consisting of ground plus 7 storeys plus rooftop amenity for the commercial, and ground plus 7 storeys for the residential element, improvements to the public realm and pedestrian routes around the perimeter of the Site and along Broadstone Place, consolidated servicing, ancillary plant and storage, cycle parking, and other associated works. Namely, to amend the wording of Condition 40 (Tree Protection Measures).

    Submitted 1 Apr 2026 Full applications
  • 26/01718/MOD106 Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Request that the City Council agrees not to enforce the provisions of Schedule 1, Clause 1.1 of the legal agreement dated 4 April 2025 (Ref: 40020699) by allowing the Commencement of Demolition prior to the Stopping Up Order to facilitate the Development has been confirmed.

    Decided 25 Mar 2026 Conditions
  • 26/00566/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of mechanical ventilation systems pursuant to Condition 26 of planning permission dated 4 April (Ref: 22/08200/FULL)

    Decided 21 Apr 2026 Full applications
  • 26/00544/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of whole life carbon assessment prior to commencement of any work on site including all works of deconstruction and demolition pursuant to Condition 33(a) of planning permission dated 04/04/2025 (RN: 22/08200/FULL).

    Decided 18 Mar 2026 Full applications
  • 26/00488/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of Circular Economy Statement pursuant to Condition 34a of planning permission dated 4 April 2025 (Ref: 22/08200/FULL)

    Decided 29 Apr 2026 Full applications
  • 26/00484/ADFULL Granted

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Details of tree protection pursuant to Condition 40 of planning permission dated 04 April 2025 (Ref: 22/08200/FULL)

    Decided 24 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by Westminster

  2. 22 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/02205/FULL Awaiting decision

    Development Site At 38-70 Baker Street, 64-66 Blandford Street And 43-45 Dorset Street London

    Variation of condition 40 of planning permission dated 4th April 2025 (RN 15/00011/FULL) for the Demolition of the existing buildings and redevelopment above a retained basement to create a mixed-use scheme providing Class E commercial space (retail, restaurants, offices), a community space, and 17 residential units within a new building consisting of ground plus 7 storeys plus rooftop amenity for the commercial, and ground plus 7 storeys for the residential element, improvements to the public realm and pedestrian routes around the perimeter of the Site and along Broadstone Place, consolidated servicing, ancillary plant and storage, cycle parking, and other associated works. Namely, to amend the wording of Condition 40 (Tree Protection Measures).

    Submitted 1 Apr 2026 Full applications

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided amendment applications in a median of 57 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Westminster

  • 26/05886/NMA Awaiting decision

    10 Spring Gardens London SW1A 2BN

    Amendments to planning permission dated 10th July 2025 (RN 25/00695/FULL) for the Use of part-ground, first, sixth, seventh and eighth floor levels as an Embassy (sui generis). Associated external alterations to the ground floor facade on Carlton House Terrace, and part ground floor to Piazza (Spring Gardens) frontage. External alterations to the doors. Installation of roof plant and security screens to the eighth floor. NAMELY, Addition of external attached building signage on West Elevation and South Elevation; Addition of two flagpoles on West Elevation; Addition of a parcel pass through, rather than fixed panel, to door on North Elevation; and omission of smoke vent and replacement with new paving to match existing paving.

    27 Aug 2026 Amendments
  • 26/05881/NMA Awaiting decision

    50A Warlock Road London W9 3LW

    Amendments to planning permission dated 11 August 2026 (RN: 26/04158/FULL) for the: Erection of a single-storey rear extension at lower ground floor level; replacement of existing rear window with a door at ground floor level and creation of terrace with associated railings/screening; and associated external alterations. NAMELY, revise the height of the rear elevation kitchen French doors.

    27 Aug 2026 Amendments
  • 26/05798/NMA Awaiting decision

    3 Blenheim Road London NW8 0LU

    Amendments to planning permission dated 18th January 2024 (RN:22/04886/FULL) for Excavation of single-storey basement extension with lightwells to front and rear gardens; Erection of single-storey extension to rear and three-storey extension to side; Formation of door to rear at lower ground floor level; Landscaping works; and associated external alterations. Namely, internal alterations and minor adjustment to rooflight position.

    24 Aug 2026 Amendments
  • 26/05670/NMA Awaiting decision

    64 St James's Street London SW1A 1NF

    Amendments to planning permission dated 2nd September 2021 (21/02158/FULL) for: Demolition of the existing mansard roof and removal of plant and escape stair; erection of new double mansard roof extension and rear extension for additional commercial floorspace (Use Class E); and installation of new escape stair, rear balconies, roof terrace and associated works namely, amendments to allow for the installation of a condenser unit within the rear lightwell.

    19 Aug 2026 Amendments
  • 26/05674/NMA Awaiting decision

    52 Eaton Place London SW1X 8AL

    Amendments to planning permission dated 25 September 2025 (25/05108/FULL) for: Alterations to rear extension at first floor level including creation of rear roof terrace at second floor level; replacement of first and second floor level front windows with double glazed timber sash windows; replacement of front door; reinstatement of period windows and doors namely, to allow replacement of second floor rear full height sash window with set of french doors.

    19 Aug 2026 Amendments