Planning application
26/03185/FULL
190 - 196 Piccadilly London SW1Y 6DS
Proposal
Variation of condition 9 of planning permission dated 11 November 2014 (RN: 14/06743/FULL) for the use of part basement and part ground floor as Class A3 restaurant. Installation of new shopfronts and associated internal and external alterations including replacement roof top plant, alterations to rear elevations fronting St James's Churchyard and new extraction ducts within rear lightwell; NAMELY, to extend the hours of use to 0730am to 0200 on Monday to Saturday and 0730 to 0100 on Sundays.
As published by the council, reference 26/03185/FULL
Timeline
Dates from the published record
-
14 May 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05289/TELNOT Decided
Princes House 38 Jermyn Street London SW1Y 6DN
Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus to a Listed Building.
-
25/06668/LBC Granted
Pegasus House 37 - 43 Sackville Street London W1S 3EH
Creation rear ground floor waste and cycle storage room and an internal entilation duct with a louvre at 7th floor roof level.
-
25/07392/LBC Awaiting decision
Sackville House 40 Piccadilly London W1J 0DR
Design changes within Sackville House in association with works approved under listed building consents dated 06.03.2024 (Ref: 23/06010/LBC), 29.11.2024 (Ref: 24/05566/LBC), 23.05.2025 (Ref: 25/01938/LBC) and dated 06.08.2025 (Ref: 25/03918/LBC).
-
25/08707/FULL Awaiting decision
Sackville House 40 Piccadilly London W1J 0DR
Variation of Condition 1 of planning permission dated 06 March 2024 (RN: 23/06009/FULL) for, "Refurbishment and extensions comprising partial demolition of the existing structure; part-infilling the lightwell to the west at ground to second floor level with third floor rear terrace and core to all levels; part-4, part-1 storey extension; creation of plant enclosure, a pavilion enclosure and roof terrace to seventh floor level; new cycle parking facilities; and associated works, all to provide additional Class E floorspace"; NAMELY, design amendments to roof, domers, lift overun, entrance doors and pavement lights.
-
25/06732/NMA Granted
Pegasus House 37 - 43 Sackville Street London W1S 3EH
Amendments to planning permission dated 22nd September 2021 (RN:20/07605/FULL) for Variation of condition 1 of planning permission dated 28 February 2020 (RN: 19/00529) for the: Redevelopment of Pegasus House and Nuffield House including demolition behind a retained facade (west, south and east) of Nuffield House and replacement building comprising 2 level basement, ground, mezzanine and first to seventh floor and demolition and replacement of Pegasus House comprising 2 level basement, ground, mezzanine and first to fifth floors; amalgamation of the two buildings to provide new office (Class B1), retail (Class A1), restaurant (Class A3), flexible office / retail (Class B1 / A1), and residential accommodation (Class C3); and other associated works. Namely, creation of waste and cycle store and associated ventilation duct and extract.
-
25/08701/TCA Granted
St James's Church 197 Piccadilly London W1J 9ET
x Mulberry (T9) - prune away from the building to get 1m clearance. 1 x Lime (T12) - raise crown to 5m. 1 x Magnolia (T13) - prune away from the building to get 1m clearance. 1 x Bay (T10) - trim to make a compact tight shape (maximum .5m reduction). 1 x Crab apple (T15) - reduce height by 1.5m and shape it accordingly. 2 x Yew (T16 & T17) - prune away from the building to get 1m clearance. Reduce longest branches outlying the crown by 1m to create a more compact form.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.