Planning application
26/03111/NMA
30 Grosvenor Square London W1K 6AN
Proposal
Amendments to planning permission dated 7th April 2025 (RN:24/05111/FULL) for Variation of conditions 1 and 46 of planning permission dated 18 February 2021 (RN 20/06601/FULL) for, 'Alterations to the existing building including retention & repair of the front and side facades, part demolition & replacement of the rear facade, rear extension of the 2nd-5th floors, removal of existing & introduction of a new 6th floor, introduction of a new set-back 7th floor, extension of the existing basement levels to include two additional basement levels (including one mezzanine level), installation of roof plant & plant screen, public realm works including hard & soft landscaping, removal of the security kiosks, fencing, bollards & gates/barriers to Blackburne's Mews & Culross Street, removal & replacement of 6 No. trees in front of the Grosvenor Square elevation & re-opening of the road on the western side of the Square, all in connection with the use of the building as a hotel (Class C1) with flexible retail/restaurant use at 1st floor, ground floor and basement 1 (Class A1/Class A3/Class C1), flexible restaurant/bar use at 7th floor (Class A3/Class A4/Class C1), leisure/spa facilities within the basement (Class D2/Class C1) & an ancillary ballroom, event spaces, back of house facilities & associated car, cycle parking & servicing facilities accessed from Blackburne's Mews, & other associated works'. Namely, to extend the permitted hours of operation to enable the operator to open at 06.30.
As published by the council, reference 26/03111/NMA
Timeline
Dates from the published record
-
12 May 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
26/04647/NMA Awaiting decision
30 Grosvenor Square London W1K 6AN
Amendments to planning permission dated 10 April 2026 (RN: 25/09270/FULL) for the: Installation of permanent external planter boxes at ground floor level on the Upper Brook Street elevation and associated works. NAMELY, to reflect design amendments to the external seating area which involves the addition of one additional parasol and additional tables and chairs serving Retail Unit R5. This necessitates the installation of additional planter boxes to set the perimeter of the external dining space.
-
26/04646/ADFULL Awaiting decision
30 Grosvenor Square London W1K 6AN
Details of supplementary management plan; Pursuant to condition 46 of planning permission dated 7th April 2025 (RN 24/05111/FULL)
-
25/05653/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings and/or full particulars of the alterations at ground floor level including shopfronts and signs pursuant to condition 4 (2) of planning permission dated 7th April 2025 (RN:24/05111/FULL)
-
25/05638/ADLBC Granted
30 Grosvenor Square London W1K 6AN
Details of alterations at ground floor level including shopfronts and signs pursuant to Condition 4 (2) (Part) of Listed Building Consent dated 18 February 2021 (RN21/00012/LBC), namely details of signage for retail unit 4.
-
25/09322/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings at 1:10 of the new planters, and a sample of their cladding pursuant to condition of planning permission dated 7th April 2025 (RN: 24/05112/FULL).
-
25/09313/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings and specification of the external dining arrangement and furniture, and Operational Management Plan relating to Unit R5 pursuant to the partial discharge of condition 46 (b) of planning permission dated 7th April 2025 (RN: 24/05111/FULL).
Other amendments applications
In Westminster
-
26/04962/NMA Awaiting decision
Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA
Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
-
26/04873/NMA Awaiting decision
Orbis House 5 Mansfield Street London W1G 9NG
Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)
-
26/04870/NMA Awaiting decision
34 Park Street London W1K 2JD
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
-
26/04816/NMA Awaiting decision
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.