10 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03111/NMA Awaiting decision
30 Grosvenor Square London W1K 6AN
Amendments to planning permission dated 7th April 2025 (RN:24/05111/FULL) for Variation of conditions 1 and 46 of planning permission dated 18 February 2021 (RN 20/06601/FULL) for, 'Alterations to the existing building including retention & repair of the front and side facades, part demolition & replacement of the rear facade, rear extension of the 2nd-5th floors, removal of existing & introduction of a new 6th floor, introduction of a new set-back 7th floor, extension of the existing basement levels to include two additional basement levels (including one mezzanine level), installation of roof plant & plant screen, public realm works including hard & soft landscaping, removal of the security kiosks, fencing, bollards & gates/barriers to Blackburne's Mews & Culross Street, removal & replacement of 6 No. trees in front of the Grosvenor Square elevation & re-opening of the road on the western side of the Square, all in connection with the use of the building as a hotel (Class C1) with flexible retail/restaurant use at 1st floor, ground floor and basement 1 (Class A1/Class A3/Class C1), flexible restaurant/bar use at 7th floor (Class A3/Class A4/Class C1), leisure/spa facilities within the basement (Class D2/Class C1) & an ancillary ballroom, event spaces, back of house facilities & associated car, cycle parking & servicing facilities accessed from Blackburne's Mews, & other associated works'. Namely, to extend the permitted hours of operation to enable the operator to open at 06.30.
-
26/04647/NMA Awaiting decision
30 Grosvenor Square London W1K 6AN
Amendments to planning permission dated 10 April 2026 (RN: 25/09270/FULL) for the: Installation of permanent external planter boxes at ground floor level on the Upper Brook Street elevation and associated works. NAMELY, to reflect design amendments to the external seating area which involves the addition of one additional parasol and additional tables and chairs serving Retail Unit R5. This necessitates the installation of additional planter boxes to set the perimeter of the external dining space.
-
25/05653/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings and/or full particulars of the alterations at ground floor level including shopfronts and signs pursuant to condition 4 (2) of planning permission dated 7th April 2025 (RN:24/05111/FULL)
-
25/05638/ADLBC Granted
30 Grosvenor Square London W1K 6AN
Details of alterations at ground floor level including shopfronts and signs pursuant to Condition 4 (2) (Part) of Listed Building Consent dated 18 February 2021 (RN21/00012/LBC), namely details of signage for retail unit 4.
-
25/09322/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings at 1:10 of the new planters, and a sample of their cladding pursuant to condition of planning permission dated 7th April 2025 (RN: 24/05112/FULL).
-
25/09313/ADFULL Granted
30 Grosvenor Square London W1K 6AN
Detailed drawings and specification of the external dining arrangement and furniture, and Operational Management Plan relating to Unit R5 pursuant to the partial discharge of condition 46 (b) of planning permission dated 7th April 2025 (RN: 24/05111/FULL).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB