Planning application
26/02668/CLLB
27 Wyndham Street London W1H 1DD
Proposal
Repairs to the basement and lower ground floor
As published by the council, reference 26/02668/CLLB
Timeline
Dates from the published record
-
21 Apr 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Westminster is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
25/06969/FULL Awaiting decision
129 - 137 Marylebone Road London NW1 5QD
Replacement of existing 8th floor window with a louvre.
-
25/06970/NMA Awaiting decision
129 - 137 Marylebone Road London NW1 5QD
Amendments to planning permission dated 28th November 2022 (RN 21/06044/FULL) for the Variation of conditions 1 (approved plans), 14 (Operational management plan for terraces),28 (plant screen design) and 30 (Mews design details) pursuant to planning permission dated 13 July 2021 (RN. 20/06929/FULL) for Demolition and redevelopment of the mews building, partial demolition of the 1960s building and roof extension, facade alterations to the 1930s building all in connection with continued Class E use, associated cycle parking, landscaping, servicing area, external terraces, rooftop plant enclosure and associated external works. NAMELY, to remove Condition 35 relating to the restriction of any primary cooking taking place on-site.
-
21/07632/ADFULL Granted
129 - 137 Marylebone Road London NW1 5QD
Samples /specification of the facing materials pursuant to Condition 31 (part) of the planning permission dated 13 July 2021 (RN: 20/06929).
-
25/06040/FULL Awaiting decision
Flat 19 York House 39 Upper Montagu Street London W1H 1FR
Installation of double glazed steel casement windows within the retained existing timber frames to front and rear of Flat 19.
-
26/02978/TCA Awaiting decision
St Mary's C Of E Primary School Enford Street London W1H 1DL
T1 - Magnolia grandiflora - Remove to ground level. Tree is very close to the building and is covering solar panels on the roof. T2 - Tree of heaven - reduce back to previous pruning points and remove basal growth to maintain size and reduce wind sail. From approx 14 metres to 10 metres. T3 - Tree of heaven - reduce back to previous pruning points and remove basal growth to maintain size and reduce wind sail. From approx 14 metres to 10 metres. T4 - olive tree - cut back from building to provide clearance and reduce shade on solar panels from approx 6 metres to 4 metres. T5 - Acer - reduce back to previous pruning points to maintain size and reduce wind sail. From approx 12 metres to 9 metres. T6 - Acer - reduce back to previous pruning points to maintain size and reduce wind sail. From approx 12 metres to 9 metres.
-
26/01719/FULL Awaiting decision
St Mary's C Of E Primary School Enford Street London W1H 1DL
Installation of an external exit gate onto Walmer Place / Virgil Place and erection of a single storey timber building in the playground.