Planning application
138 - 139 Grosvenor Road London SW1V 3LA
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Cladding remedial works approved in accordance with 23/07262/FULL, the revised scheme includes the following changes, a proposed thicker cladding profile will be installed to blocks A&B only, adaptations will be carried out to the window surrounds, sills and coping stones to ensure compatibility with the increased cladding depth.
As published by the council, reference 26/02651/FULL
Application record
- Reference
- 26/02651/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 21 Apr 2026
- Validated
- 13 May 2026
- Ward
- Pimlico South
- Postcode
- SW1V 3LA
Timeline
Dates from the published record
-
21 Apr 2026
Received by Westminster
-
13 May 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Harris Associates Agent, registered in Littleborough
Active · incorporated 2008 · Littleborough
16 applications on PlanIndex · across 8 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
51 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Flat 7 Cockburn House Aylesford Street London SW1V 3RT
Retention of satellite dish on balcony at second floor level.
Granted Full applications 4 docs -
Cockburn House Aylesford Street London SW1V 3RT
Replacement of aluminium single glazed windows and doors with double glazed units to the front rear and front elevations of Tachbrook Nursery to match windows of adjoining buildings.
Granted Full applications Windows or glazing 4 docs -
Flat 7 Cockburn House Aylesford Street London SW1V 3RT
Retention of satellite dish above balcony at second floor level in connection with Flat 7.
Refused Full applications 5 docs -
Cockburn House Aylesford Street London SW1V 3RT
Tachbrook Nursery School garden:T3 1 x False acacia: reduce major limb over road by 30%, pruning back to suitable growth points and shaping into main crown to leave a natural flowing canopy outline.
Granted Trees -
97E St George's Square London SW1V 3QP
Details of salvaged materials (i.e. doors, architraves, skirtings) and details of their reuse pursuant to Condition 4 of Listed Building Consent dated 10 September 2024 (RN23/05375/LBC)
Granted Conditions 8 docs -
Flat 1 111 St George's Square London SW1V 3QP
88% historically approved · decision due ~13 Apr
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00957/LBC]
Awaiting decision Full applications Windows or glazing 28 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)