Planning application
Flat 1 111 St George's Square London SW1V 3QP
Works: Windows or glazing
Relates to 26/00957/LBC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00957/LBC]
As published by the council, reference 26/00956/FULL
Application record
- Reference
- 26/00956/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 16 Feb 2026
- Validated
- 16 Feb 2026
- Ward
- Pimlico South
- Postcode
- SW1V 3QP
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2026.
-
26/00957/LBC Awaiting decision
Flat 1 111 St George's Square London SW1V 3QP
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00956/FULL]
Timeline
Dates from the published record
-
16 Feb 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/00957/LBC Awaiting decision
Flat 1 111 St George's Square London SW1V 3QP
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00956/FULL]
1 later application on the register refers to this one:
-
26/00957/LBC Awaiting decision
Flat 1 111 St George's Square London SW1V 3QP
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00956/FULL]
Who's behind it
Company information only, from the register and Companies House
Hallam Consulting Agent
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
97E St George's Square London SW1V 3QP
Details of salvaged materials (i.e. doors, architraves, skirtings) and details of their reuse pursuant to Condition 4 of Listed Building Consent dated 10 September 2024 (RN23/05375/LBC)
Granted Conditions 8 docs -
Flat 1 111 St George's Square London SW1V 3QP
90% historically approved · decision due ~13 Apr
Internal alterations including the removal of non-historical windows, doors, sanitary ware, kitchen units and suspended ceilings. Installation of new double-glazed windows and patio door to the rear, new bathrooms and kitchen, and new suspended ceilings. Replacement of stair enclosure with new joinery. Alterations to rear patio including removal of existing tiles and installation of new stone pavers. [Linked to 26/00956/FULL]
Awaiting decision Heritage and listed buildings Windows or glazing 28 docs -
Lower Ground Floor Flat 107 St George's Square London SW1V 3QP
Alterations to windows and doors and replacement paving finish to front lightwell steps.
Granted Full applications Windows or glazing 25 docs -
Lower Ground Floor Flat 107 St George's Square London SW1V 3QP
Alterations to windows and doors, replacement paving finish to front lightwell steps and internal alterations at lower ground floor level.
Granted Heritage and listed buildings Windows or glazing 25 docs -
103 St George's Square Mews London SW1V 3RZ
88% historically approved · decision due ~8 May
Erection of a mansard roof extension and alterations to front and rear elevations.
Awaiting decision Full applications Extension Loft or dormer 21 docs -
103 St George's Square Mews London SW1V 3RZ
88% historically approved · decision due ~14 May
Erection of mansard roof extension, first floor rear extension and roof terrace, alterations to front and rear elevations.
Awaiting decision Full applications Extension Loft or dormer 22 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)