Planning application
169 - 173 Oxford Street London W1D 2JR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of entrance doors to M&S Foodhall on Oxford Street entrance and installation of roller shutter. (Linked to 26/02137/FULL)
As published by the council, reference 26/02138/LBC
Application record
- Reference
- 26/02138/LBC
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 31 Mar 2026
- Validated
- 31 Mar 2026
- Ward
- West End
- Postcode
- W1D 2JR
Site history
Applications at this address on the Westminster register
This site has had 5 applications since 2025: 2 approved, 0 refused.
-
26/03708/LBC Awaiting decision
169 - 173 Oxford Street London W1D 2JR
Renewal of existing non-original lighting located on the oxford street elevation
-
26/02137/FULL Awaiting decision
169 - 173 Oxford Street London W1D 2JR
Removal of entrance doors to M&S Foodhall on Oxford Street entrance and installation of roller shutter. (Linked to 26/02138/LBC)
-
25/05168/FULL Granted
169 - 173 Oxford Street London W1D 2JR
Installation of rooftop plant and associated external steelwork, internal mechanical ventilation and air conditioning systems (including extract ductwork, pipework, and associated equipment) at first to fourth floor levels of M&S store. (Linked to 25/05169/LBC)
-
25/05169/LBC Granted
169 - 173 Oxford Street London W1D 2JR
Installation of rooftop plant and associated external steelwork, internal mechanical ventilation and air conditioning systems (including extract ductwork, pipework, and associated equipment) at first to fourth floor levels of M&S store. (Linked to 25/05168/FULL)
Timeline
Dates from the published record
-
31 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Iceni Projects Ltd. Agent, registered in London
Active · incorporated 2005 · London
860 applications on PlanIndex · across 92 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
169 - 173 Oxford Street London W1D 2JR
88% historically approved · decision due ~26 May
Removal of entrance doors to M&S Foodhall on Oxford Street entrance and installation of roller shutter. (Linked to 26/02138/LBC)
Awaiting decision Full applications 10 docs -
169 - 173 Oxford Street London W1D 2JR
90% historically approved · decision due ~31 Jul
Renewal of existing non-original lighting located on the oxford street elevation
Awaiting decision Heritage and listed buildings 9 docs -
169 - 173 Oxford Street London W1D 2JR
Installation of rooftop plant and associated external steelwork, internal mechanical ventilation and air conditioning systems (including extract ductwork, pipework, and associated equipment) at first to fourth floor levels of M&S store. (Linked to 25/05169/LBC)
Granted Full applications 37 docs -
169 - 173 Oxford Street London W1D 2JR
Installation of rooftop plant and associated external steelwork, internal mechanical ventilation and air conditioning systems (including extract ductwork, pipework, and associated equipment) at first to fourth floor levels of M&S store. (Linked to 25/05168/FULL)
Granted Heritage and listed buildings 34 docs -
44 Poland Street London W1F 7LZ
Alterations to shopfront.
Granted Full applications Windows or glazing 13 docs -
44 Poland Street London W1F 7LZ
Display of externally illuminated fascia sign measuring 4.50m x 0.91m
Granted Advertising 10 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.