Planning application
26/02131/FULL
8 - 9 Dover Street London W1S 4LF
Proposal
Addition of awnings to the ground floor frontage at 8 & 9 Dover Street.
As published by the council, reference 26/02131/FULL
Timeline
Dates from the published record
-
30 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01244/FULL Granted
8 - 9 Dover Street London W1S 4LF
Refurbishment and upgrade of the street facades at 8 & 9 Dover Street, including the cleaning and re-pointing of existing brickwork, replacement of windows to first floor and above, a new projecting balcony at first floor, and door upgrades at ground floor.
-
25/04478/ADFULL Granted
5 - 7 Dover Street London W1S 4LD
Details to provide anticipated building load changes for temporary construction stage and permanent long term stage on London Underground structures, detailed design and Risk Assessment Method Statement (RAMS) for all demolition and construction works (temporary and permanent), detailed design and Risk Assessment Method Statement (RAMS) on the use of scaffold and tall plant i.e cranes and lifting equipment, details on all alterations to the existing fire escape provisions including but not limited to the fire escape design and the fire access routes, details on all alterations to the existing LU loading bay, demonstrate that an unimpeded access to LU assets can be maintained at all times, demonstrate that the proposed works will not interfere with the operations and the maintenance of the LU vent shafts, demonstrate that the design allows for any emissions from LU vent shafts, demonstrate that there will at no time be any potential security risk to our railway, property or structures, demonstrate that the LU vent shafts are protected from the flooding/drainage impact due to the construction activities, accommodate ground movement arising from the development construction, mitigate the effects of noise and vibration towards the adjoining railway operations pursuant to condition 4 of planning permission dated 30th July 2024 (RN: 23/08908/FULL)
-
07/08133/ADV Granted
7 Dover Street London W1S 4LD
Display of a non-illuminated projecting sign.
-
07/00334/TELCOM Decided
Lampost Outside 5 - 7 Dover Street London W1S 4LD
Erection of telecommunication equipment to lamp post.
-
03/08450/FULL Refused
5 - 7 Dover Street London W1S 4LD
Use of ground floor premises for Class A2 (financial and professional service purposes) with ancillary coffee shop.
-
05/01964/FULL Granted
5 - 7 Dover Street London W1S 4LD
Installation of new shopfront.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.