Planning application
8 - 9 Dover Street London W1S 4LF
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Refurbishment and upgrade of the street facades at 8 & 9 Dover Street, including the cleaning and re-pointing of existing brickwork, replacement of windows to first floor and above, a new projecting balcony at first floor, and door upgrades at ground floor.
As published by the council, reference 26/01244/FULL
Application record
- Reference
- 26/01244/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 26 Feb 2026
- Validated
- 26 Mar 2026
- Decided
- 29 May 2026
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1S 4LF
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2026: 1 approved, 0 refused.
-
26/02131/FULL Awaiting decision
8 - 9 Dover Street London W1S 4LF
Addition of awnings to the ground floor frontage at 8 & 9 Dover Street.
Timeline
Dates from the published record
-
26 Feb 2026
Received by Westminster
-
26 Mar 2026
Validated
Checked as complete and ready for consideration.
-
29 May 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Whittaker Parsons Ltd Agent, registered in London
Active · incorporated 2015 · London
15 applications on PlanIndex · across 7 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 29 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 - 9 Dover Street London W1S 4LF
88% historically approved · decision due ~25 May
Addition of awnings to the ground floor frontage at 8 & 9 Dover Street.
Awaiting decision Full applications 11 docs -
5 - 7 Dover Street London W1S 4LD
Details to provide anticipated building load changes for temporary construction stage and permanent long term stage on London Underground structures, detailed design and Risk Assessment Method Statement (RAMS) for all demolition and construction works (temporary and permanent), detailed design and Risk Assessment Method Statement (RAMS) on the use of scaffold and tall plant i.e cranes and lifting equipment, details on all alterations to the existing fire escape provisions including but not limited to the fire escape design and the fire access routes, details on all alterations to the existing LU loading bay, demonstrate that an unimpeded access to LU assets can be maintained at all times, demonstrate that the proposed works will not interfere with the operations and the maintenance of the LU vent shafts, demonstrate that the design allows for any emissions from LU vent shafts, demonstrate that there will at no time be any potential security risk to our railway, property or structures, demonstrate that the LU vent shafts are protected from the flooding/drainage impact due to the construction activities, accommodate ground movement arising from the development construction, mitigate the effects of noise and vibration towards the adjoining railway operations pursuant to condition 4 of planning permission dated 30th July 2024 (RN: 23/08908/FULL)
Granted Full applications Demolition 46 docs -
7 Dover Street London W1S 4LD
Display of a non-illuminated projecting sign.
Granted Advertising 5 docs -
Lampost Outside 5 - 7 Dover Street London W1S 4LD
Erection of telecommunication equipment to lamp post.
Decided Telecoms 3 docs -
5 - 7 Dover Street London W1S 4LD
Use of ground floor premises for Class A2 (financial and professional service purposes) with ancillary coffee shop.
Refused Full applications 4 docs -
5 - 7 Dover Street London W1S 4LD
Installation of new shopfront.
Granted Full applications Windows or glazing 4 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)