Planning application
5 Great Newport Street London WC2H 7JB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of Whole Life Carbon Assessment pursuant to Condition 16 (a) of planning permission dated 13/03/2026 (RN: 24/02467/FULL)
As published by the council, reference 26/01884/ADFULL
Application record
- Reference
- 26/01884/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 23 Mar 2026
- Validated
- 23 Mar 2026
- Ward
- St James's
- Postcode
- WC2H 7JB
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2018: 1 approved, 0 refused.
-
26/03986/LBC Awaiting decision
5 Great Newport Street London WC2H 7JB
Minor internal works, namely revision of secondary entrance door design, reconstruction of half-landing WCs, improvements to vertical distribution of pipework, relocation of comms cupboard, and structural remedial works.
-
18/09846/ADFULL Granted
5 Great Newport Street London WC2H 7JB
Detailed plans showing the route of the kitchen extract ducts through the building and detailed plans and sections of the glazed roof to the hotel atrium pursuant to condition 34 of Planning Permission dated 29 April 2016 (RN: 12/03930/FULL).
Timeline
Dates from the published record
-
23 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Jones Lang LaSalle Limited Agent, registered in London
Active · incorporated 1974 · London
211 applications on PlanIndex · across 36 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
5 Great Newport Street London WC2H 7JB
Detailed plans showing the route of the kitchen extract ducts through the building and detailed plans and sections of the glazed roof to the hotel atrium pursuant to condition 34 of Planning Permission dated 29 April 2016 (RN: 12/03930/FULL).
Granted Full applications Windows or glazing 10 docs -
5 Great Newport Street London WC2H 7JB
90% historically approved · decision due ~14 Aug
Minor internal works, namely revision of secondary entrance door design, reconstruction of half-landing WCs, improvements to vertical distribution of pipework, relocation of comms cupboard, and structural remedial works.
Awaiting decision Heritage and listed buildings -
Development Site At 5 - 9 Great Newport Street London WC2H 7JA
82% historically approved · decision due ~9 Jul
Display of non illuminated PVC shroud measuring 10.4m X 4.6m and 13.5m X 7.8m
Awaiting decision Advertising 16 docs -
Development Site At 5 - 9 Great Newport Street London WC2H 7JA
88% historically approved · decision due ~3 Jul
Details of cooling hierarchy / updated energy statement pursuant to conditions 36, 38, 39, 40, 41 of planning permission dated 27 February 2026 (RN: 24/02467/FULL).
Awaiting decision Full applications 9 docs -
Development Site At 5 - 9 Great Newport Street London WC2H 7JA
88% historically approved · decision due ~26 Jun
Details of circular economy statement pursuant to condition 17 of planning permission dated 27 February 2026 (RN: 24/02467/FULL).
Awaiting decision Full applications 6 docs -
Development Site At 5 - 9 Great Newport Street London WC2H 7JA
88% historically approved · decision due ~14 May
Detailed written scheme which has been submitted by the applicant and approved by the local planning authority advised by the Theatres Trust pursuant to condition 19 of planning permission dated 13th March 2026 (RN:24/02467).
Awaiting decision Full applications 4 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)