Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Great Newport Street London WC2H 7JB

Granted Westminster 18/09846/ADFULL Approval of Details (Full PP)

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Detailed plans showing the route of the kitchen extract ducts through the building and detailed plans and sections of the glazed roof to the hotel atrium pursuant to condition 34 of Planning Permission dated 29 April 2016 (RN: 12/03930/FULL).

As published by the council, reference 18/09846/ADFULL

Application record

Reference
18/09846/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Application Permitted
Received
19 Nov 2018
Validated
19 Nov 2018
Decided
4 Dec 2018
Ward
St James's
Decision by
Delegated Decision
Postcode
WC2H 7JB

Site history

Applications at this address on the Westminster register

This site has had 3 applications since 2018: 1 approved, 0 refused.

  • 26/03986/LBC Awaiting decision

    5 Great Newport Street London WC2H 7JB

    Minor internal works, namely revision of secondary entrance door design, reconstruction of half-landing WCs, improvements to vertical distribution of pipework, relocation of comms cupboard, and structural remedial works.

    Submitted 17 Jun 2026 Heritage and listed buildings
  • 26/01884/ADFULL Awaiting decision

    5 Great Newport Street London WC2H 7JB

    Details of Whole Life Carbon Assessment pursuant to Condition 16 (a) of planning permission dated 13/03/2026 (RN: 24/02467/FULL)

    Submitted 23 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 19 Nov 2018

    Received by Westminster

  2. 4 Dec 2018

    Decision issued: Application Permitted

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

677 applications on PlanIndex · across 83 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 4 December 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 5 Great Newport Street London WC2H 7JB

    26/01884/ADFULL Submitted 23 Mar 2026 0m away

    87% historically approved · decision due ~18 May

    Details of Whole Life Carbon Assessment pursuant to Condition 16 (a) of planning permission dated 13/03/2026 (RN: 24/02467/FULL)

    Awaiting decision Full applications 4 docs
  • 5 Great Newport Street London WC2H 7JB

    26/03986/LBC Submitted 17 Jun 2026 0m away

    90% historically approved · decision due ~14 Aug

    Minor internal works, namely revision of secondary entrance door design, reconstruction of half-landing WCs, improvements to vertical distribution of pipework, relocation of comms cupboard, and structural remedial works.

    Awaiting decision Heritage and listed buildings
  • Development Site At 5 - 9 Great Newport Street London WC2H 7JA

    26/03194/ADV Submitted 14 May 2026 4m away

    85% historically approved · decision due ~9 Jul

    Display of non illuminated PVC shroud measuring 10.4m X 4.6m and 13.5m X 7.8m

    Awaiting decision Advertising 16 docs
  • Development Site At 5 - 9 Great Newport Street London WC2H 7JA

    26/03041/ADFULL Submitted 8 May 2026 14m away

    87% historically approved · decision due ~3 Jul

    Details of cooling hierarchy / updated energy statement pursuant to conditions 36, 38, 39, 40, 41 of planning permission dated 27 February 2026 (RN: 24/02467/FULL).

    Awaiting decision Full applications 9 docs
  • Development Site At 5 - 9 Great Newport Street London WC2H 7JA

    26/02915/ADFULL Submitted 1 May 2026 14m away

    87% historically approved · decision due ~26 Jun

    Details of circular economy statement pursuant to condition 17 of planning permission dated 27 February 2026 (RN: 24/02467/FULL).

    Awaiting decision Full applications 6 docs
  • Development Site At 5 - 9 Great Newport Street London WC2H 7JA

    26/01799/ADFULL Submitted 19 Mar 2026 14m away

    87% historically approved · decision due ~14 May

    Detailed written scheme which has been submitted by the applicant and approved by the local planning authority advised by the Theatres Trust pursuant to condition 19 of planning permission dated 13th March 2026 (RN:24/02467).

    Awaiting decision Full applications 4 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications