Proposal
Detailed servicing management plan pursuant to condition 24 of planning permission dated 7th March 2024 (RN:23/05424).
As published by the council, reference 26/01623/ADFULL
Application record
- Reference
- 26/01623/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 12 Mar 2026
- Validated
- 12 Mar 2026
- Ward
- St James's
Site history
Applications at this address on the Westminster register
This site has had 6 applications since 2025: 4 approved, 0 refused.
-
26/05965/NMA Decided
Development Site At 180 Piccadilly And 48 To 50 Jermyn Street London
Amendments to planning permission dated 7 March 2024 (RN:23/05424/FULL) for the Variation of conditions 1, 11, 23, 27, 36 and 37 of planning permission dated 17th May 2022 (RN:21/01138/FULL) for the Demolition of existing buildings and redevelopment of the site to create a Class E use building, including basement plant and cycle parking facilities, installation of roof top plant and all other works incidental to the proposals. NAMELY, removal of solid panels above secondary doors to south elevation, and replacement with glazing.
-
26/04480/NMA Granted
Development Site At 180 Piccadilly And 48 To 50 Jermyn Street London
Amendments to planning permission dated 07 March 2024 (RN: 23/05424/FULL) which itself varied conditions 1, 11, 23, 27, 36 and 37 of planning permission dated 17th May 2022 (RN 21/01138/FULL) for the Demolition of existing buildings and redevelopment of the site to create a Class E use building, including basement plant and cycle parking facilities, installation of roof top plant and all other works incidental to the proposals. Namely, to allow addition of two Nicholson box enclosures, flue, and weather station.
-
26/00244/ADFULL Granted
Development Site At 180 Piccadilly And 48 To 50 Jermyn Street London
Details of PV Panels including section showing relationship to finished height of plant enclosure, pursuant to condition 9 (part 9) of planning permission dated 7th March 2024 (23/05424/FULL)
-
25/08829/NMA Granted
Development Site At 180 Piccadilly And 48 To 50 Jermyn Street London
Amendments to planning permission dated 7th March 2024 (RN:23/05424/FULL) for: Demolition of existing buildings and redevelopment of the site to create a Class E use building, including basement plant and cycle parking facilities, installation of roof top plant and all other works incidental to the proposals NAMELY; amendments to waste management arrangements and wording of Condition 23, internal layout, rooftop landscaping on Piccadilly elevation and relocation of fuel fill point on Duke Street elevation.
-
25/05525/ADFULL Granted
Development Site At 180 Piccadilly And 48 To 50 Jermyn Street London
Detailed drawings and a bio-diversity management plan pursuant to Condition 37 of planning permission dated 7 March 2024 (RN 23/05424/FULL)
Timeline
Dates from the published record
-
12 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 86 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,604 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Westminster
-
26/05984/FULL Decided
41 Sutherland Street London SW1V 4JX
Replacement of front, side and rear windows with double glazed timber framed sash windows and replacement of a door with a double glazed timber framed door.
-
26/06134/FULL Decided
Flat 10H Hyde Park Mansions Cabbell Street London NW1 5BG
Replacement of front and rear second floor level windows with slim-profile double-glazed panels, retaining the existing window and door frames.
-
26/07258/FULL Awaiting decision
16A Croxley Road London W9 3HL
Installation of air to air heat pumps to offices and bedrooms.
-
26/07193/FULL Awaiting decision
98 Victoria Street London SW1E 5JL
Shopfront alterations. (Linked with 26/07194/ADV)
-
26/07187/FULL Awaiting decision
Ground Floor Flat 151 Portnall Road London W9 3BN
Erection of a single storey rear extension.