Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01330/FULL

99B Portnall Road London W9 3BB

Awaiting decision Westminster Full Planning Permission Application

Proposal

Use of roof of rear closet wing as a roof terrace and installation of decking and railings to flat roof. (Retrospective application).

As published by the council, reference 26/01330/FULL

Timeline

Dates from the published record

  1. 3 Mar 2026

    Received by Westminster

  2. 6 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/07209/FULL Awaiting decision

    Basement 74 Ashmore Road London W9 3DG

    Erection of a single storey rear extension at lower ground floor level and associated works.

    6 Oct 2025 66m away Full applications
  • 25/05990/FULL Granted

    74 Ashmore Road London W9 3DG

    Installation of handrail to left hand side ascending of front entrance steps

    22 Aug 2025 67m away Full applications
  • 26/01018/FULL Awaiting decision

    Ground Floor Flat 98 Portnall Road London W9 3BE

    Erection of a single storey part infill rear extension.

    17 Feb 2026 69m away Full applications
  • 25/07940/CLEUD Awaiting decision

    98 Portnall Road London W9 3BE

    Confirmation of a roof terrace has been in use for a period of more than years.

    3 Nov 2025 71m away Lawful development
  • 26/03842/TELNOT Decided

    80 Bravington Road London W9 3AJ

    Installation of a fixed line broadband electronic communications apparatus outside mythril house 80 bravington road.

    10 Jun 2026 96m away Telecoms
  • 26/01023/FULL Awaiting decision

    72A Bravington Road London W9 3AJ

    Erection of ground floor side infill extension, excavation of front garden and associated works.

    17 Feb 2026 103m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications