Planning application

26/00681/CLLB

The Lawn Paddington Station Praed Street London W2 1RL

Awaiting decision Westminster Cert of Law - Prposed works to LB

Proposal

Replacement of a existing freestanding Caffe Ritazza kiosk with a new design for Benugo at unit 13 and 14.

As published by the council, reference 26/00681/CLLB

Timeline

Dates from the published record

  1. 19 Jan 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Westminster is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 25/06032/COADV Granted

    121 - 123 Praed Street London W2 1RL

    Display of X2 internally illuminated fascia signs with gold spaced off 3D ppc aluminium/acrylic internally blacklit signage measuring 0.9m x 5.4m (Linked 25/06031/COFUL)

    22 Aug 2025 0m away Advertising
  • 25/05223/FULL Granted

    131 Praed Street London W2 1RL

    Erection of upward extension of the rear closet wing; creation of a mansard roof storey in association with the creation of two dwellings (Use Class C3).

    28 Jul 2025 37m away Full applications
  • 26/03760/FULL Awaiting decision

    6 - 8 Norfolk Square London W2 1RS

    Installation of mechanical services equipment, split system air-conditioning, including external condenser, three at rear third floor flat roof, and two in each rear lightwell on the north and south sides of the site and internal fans (Retrospective). (Linked with 26/03761/LBC)

    8 Jun 2026 57m away Full applications
  • 26/03761/LBC Awaiting decision

    6 - 8 Norfolk Square London W2 1RS

    Installation of mechanical services equipment, split system air-conditioning, including external condenser, three at rear third floor flat roof, and two in each rear lightwell on the north and south sides of the site and internal fans (Retrospective). (Linked with 26/03761/LBC)

    8 Jun 2026 57m away Heritage and listed buildings
  • 26/03466/ADFULL Awaiting decision

    144 Praed Street London W2 1HU

    Detailed modular green wall to include details of the construction, depth and specification of the substrate, the number, size, species and density of the proposed planting, and details of sustainable irrigation and maintenance, including a bio-diversity management plan pursuant to condition 13 of planning permission dated 9th August 2024 (RN:22/08247).

    27 May 2026 57m away Full applications
  • 26/02093/FULL Awaiting decision

    144 Praed Street London W2 1HU

    Variation of condition 1 of planning permission dated 9th August 2024 (RN:22/08247/FULL) for the Replacement of mansard roof with sheer brickwork extension, new mansard roof extension and roof top plant enclosure to provide additional hotel accommodation (Class C1). Alterations to façade fenestration and shopfronts to the building, installation of green wall to side (north east) and associated works. NAMELY, To secure amendments to the roof scape of the approved hotel, including new dormers will be introduced to serve the new 7th floor hotel bedrooms; extension of firefighting lift and staircase housing by 1 storey; consented roof plant enclosure is moved up a storey and pulled back from the roof perimeter and architectural metal railings proposed to screen the plant.

    30 Mar 2026 57m away Full applications