Skip to content
PlanIndex Get alerts
Menu

Planning application

125 Praed Street London W2 1RL

Refused Westminster 25/08046/FULL Full Planning Permission Application

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Installation of two (replacement) compressor units within a new wooden enclosure at front of the shop (retrospective).

As published by the council, reference 25/08046/FULL

Application record

Reference
25/08046/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Refused
Received
5 Nov 2025
Validated
11 May 2026
Decided
6 Jul 2026
Ward
Hyde Park
Decision by
Delegated Decision
Postcode
W2 1RL

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Westminster

  2. 11 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jul 2026

    Decision issued: Application Refused

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 121 - 123 Praed Street London W2 1RL

    25/06031/COFUL Submitted 22 Aug 2025 12m away

    Shopfront refurbished and redecorated existing cornice, timber console brackets, and pilasters, new rendered panel below fascia and to existing exposed brick pilasters (front face and side reveal) (Linked 25/06032/COADV)

    Granted Full applications Windows or glazing 18 docs
  • 131 Praed Street London W2 1RL

    25/05223/FULL Submitted 28 Jul 2025 15m away

    Erection of upward extension of the rear closet wing; creation of a mansard roof storey in association with the creation of two dwellings (Use Class C3).

    Granted Full applications Extension Loft or dormer 25 docs
    Several homes
  • 1 - 10 Praed Mews London W2 1QY

    25/08877/FULL Submitted 8 Dec 2025 21m away

    Replacement of the roof coverings with natural slate.

    Granted Full applications 16 docs
  • 1 - 10 Praed Mews London W2 1QY

    26/01984/ADFULL Submitted 26 Mar 2026 35m away

    87% historically approved · decision due ~21 May

    Details of a sample or photographs of the sample of slate you will use to clad the pitched roof slopes of the buildings pursuant to condition 2 of planning permission dated 19th March 2026 (RN:25/08877).

    Awaiting decision Full applications 7 docs
  • 15 Praed Mews London W2 1QY

    26/02227/FULL Submitted 2 Apr 2026 35m away

    87% historically approved · decision due ~30 Jun

    Installation of roof-mounted photovoltaic (PV) solar panels including associated electrical connections, mounting equipment and ancillary components.

    Awaiting decision Full applications 13 docs
  • St Marys N H S Trust Praed Street London W2 1NY

    26/00988/EIASCR Submitted 26 Nov 2025 39m away

    Works to The Bays building (to be known as the Fleming Centre) comprising demolition of the existing roof, internal floors, internal walls and ground floor slab; retention of, and alteration to, the existing external walls and facade; and construction of new four-storey vertical extension, plus a roof level including a rooftop terrace, to provide a mixed-use building comprising: Exhibition, education and multifunctional space (F1/Sui Generis); Healthcare research laboratories and consulting rooms with associated clinical spaces (Class E(g)(ii)); and/or Offices, workspace and meeting space (Class E(g)(i)). Demolition of existing portacabin, waste store, Vacuum Insulated Evaporator tank and compound; construction of ancillary pavilion structure; new public realm; new hard and soft landscaping; works to the canal wall; together with provision of servicing, refuse storage, cycle parking, plant equipment and all other associated works.

    Decided Outline Extension Demolition 3 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications