Skip to content
PlanIndex Get alerts
Menu

Planning application

32 Chippenham Mews London W9 2AW

Awaiting decision Westminster 26/00576/FULL Full Planning Permission Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of garage to habitable space; Installation of two new ground floor windows; replacment of first floor windows with juliet balconies and replacement of second floor windows.

As published by the council, reference 26/00576/FULL

Application record

Reference
26/00576/FULL
Type
Full Planning Permission Application
Status
Pending
Received
2 Feb 2026
Validated
2 Feb 2026
Ward
Harrow Road
Postcode
W9 2AW

Timeline

Dates from the published record

  1. 2 Feb 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Pringle.Design Limited Agent, a design practice registered in Wallington

Active · incorporated 2014 · Wallington

51 applications on PlanIndex · across 15 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 400 Harrow Road London W9 2HU

    26/00617/PACU2F Submitted 3 Feb 2026 50 yards away

    89% historically approved · decision due ~31 Mar

    Notification for Prior Approval to retain the ground floor in commercial use (Use Class E) and introduce two self-contained residential flats (Use Class C3) at first and second floor level. (Class A3) Town and Country Planning (General Permitted Development) (England) Order 2015 - Schedule 2, Part 3, Class C.

    Awaiting decision New dwelling 12 docs
  • St Peters C Of E Primary School Chippenham Mews London W9 2AN

    26/06589/FULL Submitted 25 Sep 2026 50 yards away

    88% historically approved · decision due ~20 Nov

    Installation of air source heat pumps.

    Awaiting decision Full applications
  • 400 Harrow Road London W9 2HU

    26/02771/PACU2F Submitted 27 Apr 2026 50 yards away

    89% historically approved · decision due ~22 Jun

    Notification for Prior Approval for conversion of the first and second floor from Class E to 1 X 2 person 1 bedroom flat and 1 x 1 person studio flat. Town and Country Planning (General Permitted Development) (England) Order 2015 - Schedule 2, Part 3, Class G.

    Awaiting decision 8 docs
  • 291 Harrow Road London W9 3RN

    25/07319/COGADF Submitted 9 Oct 2025 50 yards away

    Details of an updated pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement pursuant to Condition 58 (part A in relation to demolition) of planning permission dated 9th October 2025 (RN:25/02170/COFUL).

    Granted Full applications Demolition 10 docs
  • 291 Harrow Road London W9 3RN

    25/07321/COGADF Submitted 9 Oct 2025 50 yards away

    Details of an auditable system of arboricultural site monitoring, site supervision and record keeping pursuant to condition 23, part 1 and in relation to demolition phase only of planning permission dated 9th October 2025 (RN:25/02170/COFUL)

    Granted Full applications Demolition 15 docs
  • 291 Harrow Road London W9 3RN

    25/07320/COGADF Submitted 9 Oct 2025 50 yards away

    Details of a desktop study; detailed site investigation and remediation strategy pursuant to Phases 1-3 of Condition 4 Part A (in relation to 1-2 Elmfield Way only) of planning permission dated 9th October 2025 (RN:25/02170/COFUL)

    Granted Full applications 18 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications