Planning application
Dorchester Hotel 53 Park Lane London W1K 1QA
Works: Extension
Relates to 25/09221/FULL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 3 of listed building consent dated 15 November 2024 (RN: 24/05002/LBC) for the: Installation of flue to mezzanine roof on the Northwest facade for an emergency generator. Namely, to allow extension to the timeframe to prepare the final material. ( Linked to 25/09221/FULL)
As published by the council, reference 25/09170/FULL
Application record
- Reference
- 25/09170/FULL
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 18 Dec 2025
- Validated
- 19 Dec 2025
- Ward
- West End
- Postcode
- W1K 1QA
Site history
Applications at this address on the Westminster register
This site has had 18 applications since 2025: 6 approved, 0 refused.
-
26/06482/FULL Awaiting decision
Dorchester Hotel 53 Park Lane London W1K 1QA
Installation of rooflight on the southwest corner of the roof. (Linked with 26/06483/LBC)
-
26/06483/LBC Awaiting decision
Dorchester Hotel 53 Park Lane London W1K 1QA
Installation of rooflight on the southwest corner of the roof. (Linked with 26/06482/FULL)
-
26/05795/ADFULL Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Details of new doors and windows pursuant to Condition 4 (A and B) of planning permission dated 29th September 2023 (RN22/08705/FULL)
-
26/05759/ADLBC Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Detailed drawings of the new doors and new windows pursuant to condition 4 (A), (B) of listed building dated 29th September 2023 (RN:22/08706/LBC)
-
26/05712/LBC Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation of the building. (Linked with 26/05711/FULL)
-
26/05711/FULL Awaiting decision
Dorchester Hotel 53 Park Lane London W1K 1QA
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation (Linked with 26/05712/LBC)
-
26/05713/ADFULL Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Details of photographs and/or manufacturers' specifications of the facing materials pursuant to condition 4 of planning permission dated 20 March 2026 (RN: 24/06594/FULL)
-
26/05634/ADLBC Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Details of approval of photographs and/or manufacturers' specifications of the facing materials you will use, including paving, and elevations and roof plans annotated to show where the materials are to be located and detailed drawings of new internal doors pursuant to conditions 3 and 4 of listed building consent dated 20th March 2026 (RN 24/06595/LBC)
-
26/04237/ADV Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Display of 3 illuminated flags at ninth floor to the south elevation measuring 2.7m x 1.4m. (Linked to 26/04220/LBC)
-
26/04220/LBC Decided
Dorchester Hotel 53 Park Lane London W1K 1QA
Erection of 3 externally illuminated flagpoles at ninth floor to the south elevation. (Linked to 26/04237/ADV)
Timeline
Dates from the published record
-
18 Dec 2025
Received by Westminster
-
19 Dec 2025
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/09221/FULL Granted
Dorchester Hotel 53 Park Lane London W1K 1QA
Variation of condition 5 of planning permission dated 15 November 2024 (RN:24/05001/FULL) for the: Installation of flue to mezzanine roof on the Northwest facade for an emergency generator. Namely, to allow extension to the timeframe to prepare the final material.
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Dorchester Hotel 53 Park Lane London W1K 1QA
Variation of condition 5 of planning permission dated 15 November 2024 (RN:24/05001/FULL) for the: Installation of flue to mezzanine roof on the Northwest facade for an emergency generator. Namely, to allow extension to the timeframe to prepare the final material.
Granted Full applications Extension 14 docs -
Dorchester Hotel 53 Park Lane London W1K 1QA
Variation of Condition 3 of listed building consent dated 15 November 2024 (RN: 24/05002/LBC) for, 'Installation of flue to mezzanine roof on the Northwest facade for an emergency generator'; Namely, to allow extension to the timeframe to prepare the final material. (Linked to 25/09221/FULL)
Granted Heritage and listed buildings Extension 16 docs -
Dorchester Hotel 53 Park Lane London W1K 1QA
90% historically approved · decision due ~21 Oct
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation of the building. (Linked with 26/05711/FULL)
Decided Heritage and listed buildings Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
88% historically approved · decision due ~21 Oct
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation (Linked with 26/05712/LBC)
Awaiting decision Full applications Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
89% historically approved · decision due ~16 Oct
Detailed drawings of the new doors and new windows pursuant to condition 4 (A), (B) of listed building dated 29th September 2023 (RN:22/08706/LBC)
Decided Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
89% historically approved · decision due ~15 Oct
Details of photographs and/or manufacturers' specifications of the facing materials pursuant to condition 4 of planning permission dated 20 March 2026 (RN: 24/06594/FULL)
Decided
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.