Planning application
Dorchester Hotel 53 Park Lane London W1K 1QA
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Detailed drawings of the new doors and new windows pursuant to condition 4 (A), (B) of listed building dated 29th September 2023 (RN:22/08706/LBC)
As published by the council, reference 26/05759/ADLBC
Application record
- Reference
- 26/05759/ADLBC
- Status
- Pending
- Received
- 21 Aug 2026
- Validated
- 21 Aug 2026
- Postcode
- W1K 1QA
Timeline
Dates from the published record
-
21 Aug 2026
Received by Westminster
-
28 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Westminster is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Dorchester Hotel 53 Park Lane London W1K 1QA
90% historically approved · decision due ~21 Oct
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation.(Linked with 26/05711/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
87% historically approved · decision due ~21 Oct
Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation (Linked with 26/05712/LBC)
Awaiting decision Full applications Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
89% historically approved · decision due ~15 Oct
Details of photographs and/or manufacturers' specifications of the facing materials pursuant to condition 4 of planning permission dated 20 March 2026 (RN: 24/06594/FULL)
Awaiting decision -
Dorchester Hotel 53 Park Lane London W1K 1QA
89% historically approved · decision due ~13 Oct
Details of approval of photographs and/or manufacturers' specifications of the facing materials you will use, including paving, and elevations and roof plans annotated to show where the materials are to be located and detailed drawings of new internal doors pursuant to conditions 3 and 4 of listed building consent dated 20th March 2026 (RN 24/06595/LBC)
Awaiting decision -
Dorchester Hotel 53 Park Lane London W1K 1QA
89% historically approved · decision due ~19 Oct
Details of new doors and windows pursuant to Condition 4 (A and B) of planning permission dated 29th September 2023 (RN22/08705/FULL)
Awaiting decision Windows or glazing -
Dorchester Hotel 53 Park Lane London W1K 1QA
85% historically approved · decision due ~21 Aug
Display of 3 illuminated flags at ninth floor to the south elevation measuring 2.7m x 1.4m. (Linked to 26/04220/LBC)
Decided Advertising