Planning application
1 Bishop's Bridge Road W2 6BA
Relates to 25/09071/ADV
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of 'BT Street Hub 3' units. (Linked to 25/09071/ADV)
As published by the council, reference 25/09070/FULL
Application record
- Reference
- 25/09070/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 15 Dec 2025
- Validated
- 15 Dec 2025
- Ward
- Hyde Park
- Postcode
- W2 6BA
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025.
-
25/09071/ADV Awaiting decision
1 Bishop's Bridge Road W2 6BA
Installation of two digital 75-inch LCD display screens, one on each side of the Street Hub unit. (Linked to 25/09070/FULL)
Timeline
Dates from the published record
-
15 Dec 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 65 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/09071/ADV Awaiting decision
1 Bishop's Bridge Road W2 6BA
Installation of two digital 75-inch LCD display screens, one on each side of the Street Hub unit. (Linked to 25/09070/FULL)
1 later application on the register refers to this one:
-
25/09071/ADV Awaiting decision
1 Bishop's Bridge Road W2 6BA
Installation of two digital 75-inch LCD display screens, one on each side of the Street Hub unit. (Linked to 25/09070/FULL)
Who's behind it
Company information only, from the register and Companies House
Dalcour Maclaren Ltd Agent, registered in Bicester
Active · incorporated 2003 · Bicester
363 applications on PlanIndex · across 79 councils · 64% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 89 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1 Bishop's Bridge Road W2 6BA
84% historically approved · decision due ~9 Feb
Installation of two digital 75-inch LCD display screens, one on each side of the Street Hub unit. (Linked to 25/09070/FULL)
Awaiting decision Advertising 14 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
87% historically approved · decision due ~2 Jan
Variation of condition 1 of planning permission dated 2nd April 2015 (RN:12/07668/FULL) for the Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, the integration of the ground/canal level retail unit and the office reception, with associated alteration to building entrances; the replacement of the full-height eastern terrace screen with a half height balustrade; and rearrangement / location of the photovoltaic panels at roof level.
Awaiting decision Full applications 43 docs -
Triangle Development Site Situated Adjacent To Paddington Station Praed Street London W2 6BA
Amendments to planning permission dated 2nd April 2015 (RN:12/07668/FULL) for Development of an office building comprising canal-side reception with 21 storeys of offices and either Class A1/A2/A3 use at canal-side and first floor level, alongside pedestrian linkages to Paddington Station and Bishop's Bridge Road, in conjunction with landscaping and other associated works. Namely, rationalisation of the southern structural transfer expression; rationalisation of the canal side structural transfer expression to match the structural grid; reconfiguration of the east and central core, including: addition of a dedicated fire-fighting lift, addition of a combined passenger/evacuation lift and a passenger/goods lift that now serve the basement levels, and enlargement and relocation of the accessible WC from the eastern to the central core; external alterations to the western lift shaft façade, reducing the extent of glazing; the material treatment of the stair and lift cores changed from aluminium cladding to concrete; 500mm extension of the north office façade; replacement of the brise soleil (fins) with deeply expressed mullion system; external terraces reconfigured; Internal layout reconfiguration; and adjustment of the Building Maintenance Unit (BMU) layout at roof level.
Granted Amendments Extension Windows or glazing 65 docs -
15 Sheldon Square London W2 6DL
84% historically approved · decision due ~27 Oct
Display of internally illuminated fascia sign measuring 0.255m X 2.473m, 0.255m X 2.473m, 0.9m X 0.9m and internally illuminated hanging sign 0.6m X 0.6m
Decided Advertising 11 docs -
15 Sheldon Square London W2 6DL
87% historically approved · decision due ~3 Jul
Details of cycle parking pursuant to condition 14 of planning permission dated 10 February 2026 (RN: 25/00673/FULL)
Awaiting decision Full applications 7 docs -
15 Sheldon Square London W2 6DL
87% historically approved · decision due ~18 Jun
Details of the ways in which you will protect the trees which you are keeping pursuant to condition 16 of planning permission dated 19th February 2026 (RN:25/00673/FULL)
Awaiting decision Full applications Trees 7 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.
-
26/06234/FULL Awaiting decision
40 Grosvenor Place London SW1X 7HJ
Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))
-
26/06249/FULL Awaiting decision
53 Wimpole Street London W1G 8YH
Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)