Development Site At 105-106 New Bond Street And 18 Haunch Of Venison Yard London

Awaiting decision Westminster 25/08050/NMA Non-material amendments

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Amendments to planning permission dated 2nd October 2025 (RN 25/04904/FULL) for the Variation of Condition 1 of planning permission dated 4th June 2025 (RN: 25/01184/FULL), which itself varied Conditions 1 and 6 of planning permission dated 11th September 2020 (RN:19/06794/FULL) for, 'Demolition behind the retained New Bond Street facade and erection of a new building comprising sub-basement, basement, ground and six upper storeys for use as retail (Class A1) at basement, part ground and mezzanine floors; offices (Class 81) at part ground, third to sixth floors; and dual/alternative use of the first and second floor as either offices (Class 81) and/or retail (Class A1). Office access to be via Haunch of Venison Yard. Installation of plant at sub-basement and sixth floor levels, terraces at third to fifth floor levels and cycle storage and waste stores at sub­ basement level' NAMELY, to amend the description of develpoment and wording of condition 6.

As published by the council, reference 25/08050/NMA

Application record

Reference
25/08050/NMA
Type
Non-material amendments
Status
Pending
Received
5 Nov 2025
Validated
5 Nov 2025
Ward
West End

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025.

  • 26/02902/FULL Awaiting decision

    Development Site At 105-106 New Bond Street And 18 Haunch Of Venison Yard London

    Variation/removal of Conditions 1, 5, 19, 22, and 23 of planning permission 2nd October 2025 (RN: 25/04904/FULL), which itself varied Condition 1 of planning permission dated 4th June 2025 (RN: 25/01184/FULL), which itself varied Conditions 1 and 6 of planning permission dated 11th September 2020 (RN:19/06794/FULL) for demolition behind the retained New Bond Street facade and erection of a new building comprising sub-basement, basement, ground and six upper storeys for use as retail (Class E( a)) at basement, part ground and mezzanine floors; offices (Class E(g)(i)) at part ground, third to sixth floors; and dual/alternative use of the first and second floor as either offices (Class E(g)(i)) and/or retail (Class E(a)). Office access to be via Haunch of Venison Yard. Installation of plant at sub-basement and roof levels, terraces at upper floors and cycle storage and waste stores within basement level; NAMELY, to incorporate design amends at Level 06 roof to accommodate terrace, reconfigure the basement layout, inclusion of structural panel to glazing at Level 04, and increase lift overrun.

    Submitted 1 May 2026 Full applications

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Westminster

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

CBRE Ltd Agent, registered in London

Active · incorporated 1998 · London

365 applications on PlanIndex · across 80 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided amendment applications in a median of 54 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Development Site At 105-106 New Bond Street And 18 Haunch Of Venison Yard London

    26/02902/FULL Submitted 1 May 2026 50 yards away

    87% historically approved · decision due ~26 Jun

    Variation/removal of Conditions 1, 5, 19, 22, and 23 of planning permission 2nd October 2025 (RN: 25/04904/FULL), which itself varied Condition 1 of planning permission dated 4th June 2025 (RN: 25/01184/FULL), which itself varied Conditions 1 and 6 of planning permission dated 11th September 2020 (RN:19/06794/FULL) for demolition behind the retained New Bond Street facade and erection of a new building comprising sub-basement, basement, ground and six upper storeys for use as retail (Class E( a)) at basement, part ground and mezzanine floors; offices (Class E(g)(i)) at part ground, third to sixth floors; and dual/alternative use of the first and second floor as either offices (Class E(g)(i)) and/or retail (Class E(a)). Office access to be via Haunch of Venison Yard. Installation of plant at sub-basement and roof levels, terraces at upper floors and cycle storage and waste stores within basement level; NAMELY, to incorporate design amends at Level 06 roof to accommodate terrace, reconfigure the basement layout, inclusion of structural panel to glazing at Level 04, and increase lift overrun.

    Awaiting decision Full applications Demolition Windows or glazing 11 docs
  • 106 New Bond Street London W1S 1SY

    25/07922/ADV Submitted 31 Oct 2025 50 yards away

    Display of a scaffold shroud to the front elevation of 105-106 New Bond Street and 18 Haunch of Venison Yard for temporary period between 01 November 2025 to 28 February 2027 incorporating a static, non-illuminated advertisement incorporating an image to the front and side elevations and incorporating an area at first floor level for commercial advertising measuring approximately 9.0m wide by 3.5m high.

    Refused Advertising 9 docs
  • 26 Brook Street West End London W1K 5DQ

    25/05338/FULL Submitted 30 Jul 2025 50 yards away

    Variation of Condition 1 of planning permission dated 3rd October 2024 (RN:24/03691/FULL) for, 'External alterations including replacement windows and doors, infilling three windows and one infilled door opening to the rear, relocation of condenser units and screening to main roof level, installation of a replacement shopfront and erection of an awning'; Namely, changes to the shopfront, which will be extended further along Haunch of Venison Yard, with the large section of curved glass previously proposed, now squared off and replaced with one single pane facing Brook Street and two panes facing the Yard and to introduce a skylight on the roof above the stair core. (Application under Section 73 of the Act).

    Refused Full applications Windows or glazing 23 docs
  • 20 Brook Street West End London W1K 5DE

    25/05619/ADV Submitted 11 Aug 2025 50 yards away

    84% historically approved · decision due ~12 Nov

    Display of non illuminated fascia sign measuring 4.77m X 0.46m and internally illuminated projecting sign measuring 0.15m X 0.65m

    Awaiting decision Advertising 21 docs
  • 20 Brook Street West End London W1K 5DE

    25/05618/FULL Submitted 11 Aug 2025 50 yards away

    87% historically approved · decision due ~11 Nov

    Replacement shopfront, replacement roof light on the third floor roof facing North, minor internal alterations, installation of secondary glazing on the second and third and floor, replacement air conditioning for the ground and basement floor, alterations of the basement tea point and WC area and replacement fire doors at main escape core. (Linked to 25/05616/LBC)

    Awaiting decision Full applications Loft or dormer Roofing +1 35 docs
  • 22 Brook Street Mayfair London W1K 5DF

    03/04542/LBC Submitted 10 Jun 2003 50 yards away

    Display of an internally-illuminated projecting sign.

    Decided Heritage and listed buildings 3 docs

In Westminster

  • 26/06232/NMA Awaiting decision

    37 Trevor Place London SW7 1LE

    Amendments to planning permission dated 17th July 2026 (RN 26/03030/FULL) for the Alterations including enlargement of louvres and installation of new plant in basement; landscaping of roof terrace; second floor windows replaced with door sets; partial demolition at ground and first floor levels to create new lightwell and landscaped courtyard. NAMELY, addition of a free-standing sauna to the second-floor roof terrace.

    Received 11 Sep, published by the council 21 Sep 2026 Amendments
  • 26/06256/NMA Awaiting decision

    Queens Court Queensway London W2 4QN

    Amendments to planning permission dated 21st May 2026 (RN:25/05013/FULL) for Variation of conditions 1, 3, 8, 9 and 17 of planning permission dated 11th May 2022 (RN 18/09765/FULL) for the Change of use of rear part of Queensway Market to Retail, Financial and Professional services, Office and Restaurant (within Class E) use and 5 residential units facing Princes Court, reconfiguration of retail units along Queensway including introduction of Retail uses at Nos.23 and 33 (current entrances to Queensway Market) and use of Nos.25 and 41-43 Queensway as Restaurant uses, installation of new shopfronts to Nos.23 to 43 Queensway 23-43, erection of infill extension to rear at ground floor level, erection of two new pavilion structures for Retail use and associated new hard and soft landscaping on land between Queens Court and Princes Court, installation of green roofs, rooflights and mechanical plant within enclosures to first floor level roofs between projecting rear wings of Queens Court installation of kitchen extract ducts to rear elevations, and associated cycle parking, waste storage, plant and other ancillary alterations ('Application 2'). Namely, to vary the hours of operation for the refrigeration plant controlled by condition 6.

    Received 11 Sep, published by the council 21 Sep 2026 Amendments
  • 26/06251/NMA Awaiting decision

    19 Cumberland Street London SW1V 4LS

    Amendments to planning permission dated 20th March 2026 (RN:25/08960/FULL) for Lower ground floor rear infill extension with terrace above, replacement of rear first floor conservatory, new roof level rear single dormer with access to third floor roof terrace, alterations to windows and external refurbishment, namely the change of conservatory gable roof to a flat GRP roof.

    Received 11 Sep, published by the council 18 Sep 2026 Amendments
  • 26/06201/NMA Awaiting decision

    Almack House 28 King Street St James's London SW1Y 6QW

    Amendments to planning permission dated 16th April 2026 (RN:26/01487/FULL) for Installation of a mechanical plant at lower ground floor and installation of two grilles to two lower ground floor windows, namely change to approved grille.

    Received 10 Sep, published by the council 17 Sep 2026 Amendments
  • 26/06212/NMA Awaiting decision

    10 - 11 Lancaster Gate London W2 3LH

    Amendment to Condition 12 (Whole Life Carbon) of planning permission dated 19th April 2024 (RN 23/04044/FULL) for Change of use from hotel to residential use (Class C3) with associated internal alterations to create 11 new units and external alterations comprising reconfiguration and recladding of the rear extension and restoration of the existing building. Namely to include additional requirement to evidence and justify where benchmarks cannot be achieved, consider mitigation measures and if none, evidence that all mitigation measures have been exhausted. (Linked with RN 26/06213/ADFULL)

    Received 10 Sep, published by the council 17 Sep 2026 Amendments