Planning application

The Victoria Tower Gardens Millbank London SW1P 3YB

Granted Westminster 25/07908/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of the results of the chemical testing undertaken as part of the ground site investigation pursuant to Condition 5 of planning permission dated 7th July 2023 (RN: 23/02182/FULL)

As published by the council, reference 25/07908/ADFULL

Application record

Reference
25/07908/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Granted As published: Application Permitted
Received
29 Oct 2025
Validated
27 Nov 2025
Decided
13 Mar 2026
Ward
St James's
Decision by
Delegated Decision
Postcode
SW1P 3YB

Site history

Applications at this address on the Westminster register

This site has had 8 applications since 2022: 3 approved, 0 refused.

  • 26/05170/ADV Awaiting decision

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Display of 15ft traditional tree planned for Victoria Tower Gardens with white lights and silver, blue and purple mixed size baubles with London Heritage Quarter branded base (from 10 November 2025 until 03 January 2027)

    Submitted 31 Jul 2026 Advertising
  • 26/05095/TPO Decided

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Tree surgery as per attached specification entitled 26/05095/TPO Victoria Tower Gardens dated 03 September 2026.

    Submitted 29 Jul 2026 Trees
  • 26/04921/OBS Awaiting decision

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Application called in by the Minisry of Housing, Communities and Local Government (ref: APP/XF990/V/19/3240661) for: Installation of the United Kingdom Holocaust Memorial and Learning Centre including excavation to provide a basement and basement mezzanine for the learning centre (Class D1); erection of a single storey entrance pavilion; re-provision of the Horseferry Playground and refreshments kiosk (Class A1); repositioning of the Spicer Memorial; new hard and soft landscaping and lighting around the site; and all ancillary and associated works. Please find below a link to the Gov.uk webpage where the above documents are available. https://www.gov.uk/guidance/holocaust-memorial-and-learning-centre-updated-planning-application-documents

    Submitted 16 Jul 2026
  • 26/03834/ADV Awaiting decision

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Display of a non-illuminated PVC banner measuring 1m x 3m for a temporary period from 01 September 2026 to 01 October 2027.

    Submitted 11 Jun 2026 Advertising
  • 26/02104/ADV Awaiting decision

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Display of one non illuminated Lion sculpture for the Pride in the Quarter Trail, celebrating the 2026 World Cup and LGBTQ+ pride measuring 1.2m x 0.9m x 1.9m from 1st June 2026 until 10th Augsut 2026.

    Submitted 30 Mar 2026 Advertising
  • 25/05273/ADV Granted

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Display of 15ft traditional tree planned for Victoria Tower Gardens with white lights and silver, blue and purple mixed size baubles with London HeritageQuarter branded base (from 15 November 2025 until 06 January 2026)

    Decided 14 Aug 2025 Advertising
  • 22/05300/TPO Granted

    The Victoria Tower Gardens Millbank London SW1P 3YB

    Trees T1 to T23 are all Platanus x hispanica. T1 (0W2U): Tip reduce limb to south and SSE 2m and lift rest of southerly crown until 1 m above wall. T2 (0W2T): Thin main southern lower crown section by 20%. Drop crotch thin inner crown to SW by 30%. T3 (0W2S): Drop crotch thin central lower limb to SSW by 20%. T4 (0W2R): Thin lower section of lowest limb to SE 30%. Drop crotch lower branches by 30% on lowest limb to SSW. T5 (0W2Q): Tip back southern lower crown by 1m. T6 (0W2P): Thin lower central limb tips by 30% and shorten lower limb SSW by 1m. T7 (0W2N): Thin lower central limb by 30%. T8 (0W2M): Tip back central lower branch by 1m and drop crotch lowest branch by 2m on the lower limb to SW. T9 (0W2L): Thin all lowest branches to south by 30%. T10 (0W2K): Thin two lowest central limbs to south and SSW by 30%. T11 (0W2J): Lift lowest central limbs to south by 1m and remove lower fork of lowest limb SSW. T12 (0W2H): Remove lower fork of central limb to south and lift remaining branches to south by 1m. T13 (0W28): Thin central lower limb to south by 30% and lift remaining branches by 1m. T14 (0W27): Thin central lower limbs to south by 30% and drop crotch each of lower limb SSW by 2m. T15 (0W26): Thin both lower limbs to south by 30% and lift remaining by 1m. T16 (0W25): Thin central lower crown to south and lowest limb by 30%. T17 (0W24): Drop crotch lift central lower crown to south by 2m. T18 (0W23): Drop crotch central lower limb to south back 2.5m, thin lowest branches by 20%. T19 (0W22): Drop crotch central lowest limb to south back 2m T20 (0W21): Tip back lowest branches to south by 1m. T21 (0W20): Thin central lowest limb to south 20% and lift remaining branches 1m. T22 (0W1Z) Drop crotch lowest limb SSW back 2m. Thin central lower crown to south 20%. T23 (0W1Y): Drop crotch lift lowest branches to south 1m.

    Decided 16 Aug 2022 Trees

Timeline

Dates from the published record

  1. 29 Oct 2025

    Received by Westminster

  2. 27 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Mar 2026

    Decision issued: Application Permitted

  4. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Restoration and Renewal Delivery Authority Ltd Agent, registered in London

Active · incorporated 2020 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 13 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • The Victoria Tower Gardens Millbank London SW1P 3YB

    25/05273/ADV Submitted 29 Jul 2025 50 yards away

    Display of 15ft traditional tree planned for Victoria Tower Gardens with white lights and silver, blue and purple mixed size baubles with London HeritageQuarter branded base (from 15 November 2025 until 06 January 2026)

    Granted Advertising Trees 12 docs
  • The Victoria Tower Gardens Millbank London SW1P 3YB

    26/05170/ADV Submitted 31 Jul 2026 50 yards away

    82% historically approved · decision due ~25 Sep

    Display of 15ft traditional tree planned for Victoria Tower Gardens with white lights and silver, blue and purple mixed size baubles with London Heritage Quarter branded base (from 10 November 2025 until 03 January 2027)

    Awaiting decision Advertising Trees
  • The Victoria Tower Gardens Millbank London SW1P 3YB

    26/05095/TPO Submitted 29 Jul 2026 50 yards away

    100% historically approved · decision due ~23 Sep

    Tree surgery as per attached specification entitled 26/05095/TPO Victoria Tower Gardens dated 03 September 2026.

    Decided Trees
  • The Victoria Tower Gardens Millbank London SW1P 3YB

    26/04921/OBS Submitted 16 Jul 2026 50 yards away

    89% historically approved · decision due ~10 Sep

    Application called in by the Minisry of Housing, Communities and Local Government (ref: APP/XF990/V/19/3240661) for: Installation of the United Kingdom Holocaust Memorial and Learning Centre including excavation to provide a basement and basement mezzanine for the learning centre (Class D1); erection of a single storey entrance pavilion; re-provision of the Horseferry Playground and refreshments kiosk (Class A1); repositioning of the Spicer Memorial; new hard and soft landscaping and lighting around the site; and all ancillary and associated works. Please find below a link to the Gov.uk webpage where the above documents are available. https://www.gov.uk/guidance/holocaust-memorial-and-learning-centre-updated-planning-application-documents

    Awaiting decision
    Small domestic
  • 55 Unit B Nine Elms Lane SW11 7DS

    2026/2427 Submitted 27 Aug 2026 50 yards away

    88% historically approved · decision due ~22 Oct

    Submission of details pursuant to the discharge of Conditions 28 and 50 of planning application 2019/2250 dated 18/12/2020 (Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 9 (Parameter Plans), 10 (GEA Floorspace Limits), 34 (BREEAM) and 52 (Wind Mitigation) of part outline and part detail planning permission 2017/6762 dated 28th March 2019 for 'Minor Material Amendment pursuant to Conditions 1 (time limit), 2 (time limit for reserved matters), 9 (parameter plans), 11 (Maximum Floorspaces), 15 (distribution and internal configuration of residential units for each plot), 32 (construction sequence and delivery plan) and 41 (land and groundwater contamination) of part outline and part detailed planning permission 2016/2424, dated 23rd January 2017 for 'Minor Material Amendment pursuant to Conditions 3 (reserved matters), 9 (parameter plans), 10 (GEA floorspace limits), 13 (residential unit limit), 18 (car parking space limit), 32 (B8 use restriction) and 41 (land and groundwater contamination) of part outline and part detailed planning permission 2011/2462, dated 30/03/12 for demolition of all existing buildings and construction of a mixed use redevelopment comprising 7 building plots with buildings up to 23 storeys high to provide residential units; commercial and community floorspace; associated basement parking and part of the 'Nine Elms Linear Park'. All matters reserved apart from the appearance and scale of Blocks B1, D1 & G and two new access points from Nine Elms Lane.' An addendum to the Environmental Statement has been submitted under The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).)

    Awaiting decision Demolition
  • 55 Unit D Nine Elms Lane SW11 7DS

    2026/0452 Submitted 3 Feb 2026 50 yards away

    Submission of details pursuant to the partial discharge of Condition 50 (Noise Insulation) in respect of Unit D, Plot D only of planning permission 2019/2250 dated 18/12/2020.

    Granted Full applications 4 docs

In Westminster

  • 26/05984/FULL Decided

    41 Sutherland Street London SW1V 4JX

    Replacement of front, side and rear windows with double glazed timber framed sash windows and replacement of a door with a double glazed timber framed door.

    Received 2 Sep, published by the council 11 Sep 2026 Full applications
  • 26/06134/FULL Decided

    Flat 10H Hyde Park Mansions Cabbell Street London NW1 5BG

    Replacement of front and rear second floor level windows with slim-profile double-glazed panels, retaining the existing window and door frames.

    Received 8 Sep, published by the council 15 Sep 2026 Full applications
  • 26/07258/FULL Awaiting decision

    16A Croxley Road London W9 3HL

    Installation of air to air heat pumps to offices and bedrooms.

    Received 22 Oct, published by the council 23 Oct 2026 Full applications
  • 26/07193/FULL Awaiting decision

    98 Victoria Street London SW1E 5JL

    Shopfront alterations. (Linked with 26/07194/ADV)

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/07187/FULL Awaiting decision

    Ground Floor Flat 151 Portnall Road London W9 3BN

    Erection of a single storey rear extension.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications