43 - 45 Portman Square London W1H 6LY

Awaiting decision Westminster 25/03065/ADFULL Approval of Details (Full PP)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of accurate and verified estimates of the 'Be Seen' energy performance indicators for the Development as outlined in chapter 3 (Planning Stage) of the Be Seen Guidance pursuant to Condition 33 (A) of planning permission dated 7th April 2025 (RN:24/04987/FULL)

As published by the council, reference 25/03065/ADFULL

Application record

Reference
25/03065/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
2 May 2025
Validated
2 May 2025
Ward
West End
Postcode
W1H 6LY

Site history

Applications at this address on the Westminster register

This site has had 14 applications since 2004: 8 approved, 0 refused.

  • 26/04951/NMA Decided

    43 - 45 Portman Square London W1H 6LY

    Amendments to planning permission dated 22 April 2026 (Ref: 25/06153/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; NAMELY, to amend the wording of Condition 27 to allow basement demolition work to proceed in advance of sustaianble drainage construction drawings being approved.

    Submitted 23 Jul 2026 Amendments
  • 26/04721/ADFULL Awaiting decision

    43 - 45 Portman Square London W1H 6LY

    Details of accurate and verified estimates of the 'Be Seen' energy performance indicators for the Development as outlined in chapter 3 (Planning Stage) of the Be Seen Guidance pursuant to condition 33 (A) of planning permission dated 7th April 2025 (RN:24/04987/FULL)

    Submitted 15 Jul 2026
  • 26/04154/NMA Decided

    43 - 45 Portman Square London W1H 6LY

    Amendments to planning permission dated 22 April 2026 (RN: 25/06153/FULL) for the variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; Namely,the retention of existing cores, the infilling of atria, the provision of additional rooflights to the western 3rd floor terrace, layout changes at ground and lower ground levels and changes to some windows on the eastern façade and retention of existing first floor windows, resulting in single storey full height glazing to the retail frontages along Orchard Street (Application under Section 73 of the Act); NAMELY rooftop plant screening; enlargement of lift overrun; adjustments to PV layout; reconfiguration of Level 10 north façade with doors and panels; consolidation and removal of blue roofs at Levels 10 and 8; enlargements of SW stair roof with addition of vent for pressurisation; updating of south façade windows with discreet vents; alerations to NW mansard for maintenance access; addition of additional louvres for building services.

    Submitted 23 Jun 2026 Amendments
  • 26/02687/NMA Awaiting decision

    43 - 45 Portman Square London W1H 6LY

    Amendments to planning permission dated 22nd April 2026 (RN:25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works namely, amendments to mansard roof and rear façades; alterations to skylights and access doors to terraces; alterations to Portman Mews and Orchard Street elevations and to main entrance; alterations to louvres and to internal layout.

    Submitted 22 Apr 2026 Amendments
  • 26/00708/ADFULL Granted

    43 - 45 Portman Square London W1H 6LY

    Details of signed Appendix A of the council's Code of Construction Practice pursuant to Condition 19 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)

    Decided 4 Mar 2026 Full applications
  • 26/00710/ADFULL Granted

    43 - 45 Portman Square London W1H 6LY

    Detailed method statement for interim and temporary drainage measures during the demolition and construction phase pursuant to Condition 26 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)

    Decided 27 Mar 2026 Full applications
  • 26/00709/ADFULL Granted

    43 - 45 Portman Square London W1H 6LY

    Details of Construction Logistics Plan to clarify that TfL's assets and services are not adversely affected during the demolition and construction of the application pursuant to Condition 32 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)

    Decided 12 Mar 2026 Full applications
  • 25/06153/FULL Awaiting decision

    43 - 45 Portman Square London W1H 6LY

    Variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; Namely,the retention of existing cores, the infilling of atria, the provision of additional rooflights to the western 3rd floor terrace, layout changes at ground and lower ground levels and changes to some windows on the eastern façade and retention of existing first floor windows, resulting in single storey full height glazing to the retail frontages along Orchard Street (Application under Section 73 of the Act).

    Submitted 29 Aug 2025 Full applications
  • 06/00987/AD7 Granted

    43 - 45 Portman Square London W1H 6LY

    Display of non-illuminated estate agent board measuring 600mm x 450mm to be attached to the railings in front of the building at a height of 1.5m from ground floor level, for a temporary period of 6 months.

    Decided 16 Feb 2006 Advertising
  • 05/10346/AD7 Granted

    43 - 45 Portman Square London W1H 6LY

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    Decided 29 Dec 2005 Advertising

Timeline

Dates from the published record

  1. 2 May 2025

    Received by Westminster

  2. 30 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file

2,030 applications on PlanIndex · across 33 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 43 - 45 Portman Square London W1H 6LY

    06/00987/AD7 Submitted 9 Feb 2006 0m away

    Display of non-illuminated estate agent board measuring 600mm x 450mm to be attached to the railings in front of the building at a height of 1.5m from ground floor level, for a temporary period of 6 months.

    Granted Advertising 3 docs
  • 43 - 45 Portman Square London W1H 6LY

    04/09146/AD7 Submitted 18 Nov 2004 0m away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.

    Granted Advertising 3 docs
  • 43 - 45 Portman Square London W1H 6LY

    05/10346/AD7 Submitted 22 Dec 2005 0m away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    Granted Advertising 2 docs
  • Hesketh House 43 - 45 Portman Square London W1H 6LY

    06/10363/FULL Submitted 22 Dec 2006 0m away

    Alterations to entrance on Portman Square including removal of gates and installation of full height glazed lobby.

    Withdrawn Full applications Windows or glazing 10 docs
  • 43 - 45 Portman Square London W1H 6LY

    26/04951/NMA Submitted 23 Jul 2026 0m away

    92% historically approved · decision due ~17 Sep

    Amendments to planning permission dated 22 April 2026 (Ref: 25/06153/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; NAMELY, to amend the wording of Condition 27 to allow basement demolition work to proceed in advance of sustaianble drainage construction drawings being approved.

    Decided Amendments Extension Demolition
  • 43 - 45 Portman Square London W1H 6LY

    26/04721/ADFULL Submitted 15 Jul 2026 0m away

    89% historically approved · decision due ~9 Sep

    Details of accurate and verified estimates of the 'Be Seen' energy performance indicators for the Development as outlined in chapter 3 (Planning Stage) of the Be Seen Guidance pursuant to condition 33 (A) of planning permission dated 7th April 2025 (RN:24/04987/FULL)

    Awaiting decision

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.