Planning application
26/00708/ADFULL
43 - 45 Portman Square London W1H 6LY
Proposal
Details of signed Appendix A of the council's Code of Construction Practice pursuant to Condition 19 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)
As published by the council, reference 26/00708/ADFULL
Timeline
Dates from the published record
-
5 Feb 2026
Received by Westminster
-
4 Mar 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04721/ADFULL Awaiting decision
43 - 45 Portman Square London W1H 6LY
Details of accurate and verified estimates of the 'Be Seen' energy performance indicators for the Development as outlined in chapter 3 (Planning Stage) of the Be Seen Guidance pursuant to condition 33 (A) of planning permission dated 7th April 2025 (RN:24/04987/FULL)
-
26/00710/ADFULL Granted
43 - 45 Portman Square London W1H 6LY
Detailed method statement for interim and temporary drainage measures during the demolition and construction phase pursuant to Condition 26 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)
-
26/00709/ADFULL Granted
43 - 45 Portman Square London W1H 6LY
Details of Construction Logistics Plan to clarify that TfL's assets and services are not adversely affected during the demolition and construction of the application pursuant to Condition 32 of planning permission dated 07 April 2025 (RN: 24/04987/FULL)
-
26/04154/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 02 March 2026 (RN: 25/06153/FULL) for the variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; Namely,the retention of existing cores, the infilling of atria, the provision of additional rooflights to the western 3rd floor terrace, layout changes at ground and lower ground levels and changes to some windows on the eastern façade and retention of existing first floor windows, resulting in single storey full height glazing to the retail frontages along Orchard Street (Application under Section 73 of the Act); NAMELY rooftop plant screening; enlargement of lift overrun; adjustments to PV layout; reconfiguration of Level 10 north façade with doors and panels; consolidation and removal of blue roofs at Levels 10 and 8; enlargements of SW stair roof with addition of vent for pressurisation; updating of south façade windows with discreet vents; alerations to NW mansard for maintenance access; addition of additional louvres for building services.
-
25/06153/FULL Awaiting decision
43 - 45 Portman Square London W1H 6LY
Variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for, 'Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works'; Namely,the retention of existing cores, the infilling of atria, the provision of additional rooflights to the western 3rd floor terrace, layout changes at ground and lower ground levels and changes to some windows on the eastern façade and retention of existing first floor windows, resulting in single storey full height glazing to the retail frontages along Orchard Street (Application under Section 73 of the Act).
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.