Planning application
Land Off Station Road Station Road Lakenheath Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application to discharge conditions 12 (submission of suds details), 16 (foul water disposal), 19 (contaminated land information), 23 (archaeology further details), 26 (implementation of landscaping), 31 (full details of access), 32 (surfacing of the access), 33 (details of estate roads and access), 37 (travel plan for housing) and 38 (noise mitigation (dwellings)) of application DC/14/2096/HYB
As published by the council, reference DCON(D)/14/2096
Application record
- Reference
- DCON(D)/14/2096
- Status
- Pending Consideration
- Received
- 16 Jun 2026
- Validated
- 16 Jun 2026
- Ward
- Lakenheath
- Parish
- Lakenheath
Site history
Applications at this address on the West Suffolk register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
DCON(C)/14/2096 Awaiting decision
Land Off Station Road Station Road Lakenheath Suffolk
Discharge of conditions application for DC/14/2096/HYB -condition 27 - ecological enhancement plan, condition 28 - construction and environmental management plan and condition 42 - ecological clerk of works
-
DCON(B)/14/2096 Granted
Land Off Station Road Station Road Lakenheath Suffolk
Application to discharge condition 29 - construction method statement of DC/14/2096/HYB
-
DCON(A)/14/2096 Granted
Land Off Station Road Station Road Lakenheath Suffolk
Application to discharge conditions 9 (site wide design framework) and 10 (odour assessment) of DC/14/2096/HYB
Timeline
Dates from the published record
-
16 Jun 2026
Received by West Suffolk
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
West Suffolk took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: DC/14/2096/HYB (Decided)
Who's behind it
Company information only, from the register and Companies House
Agent on file, a developer
17 applications on PlanIndex · across 4 councils · 67% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
60 documents on file for this application
- ANGLIAN WATER COMMENTS
- MOD SAFEGUARDING - COMMENTS
- MOD PLANNING - COMMENTS
- PHASE II ENVIRONMENTAL AND GEOTECHNICAL REPORT
- NOISE REPORT - FAÇADE NOISE EXPOSURE ASSESSMENT
- RISING MAIN LONGSECTIONS - PUMP 2
- SECTION 104 CONSTRUCTION DETAILS
- SECTION 104 LAYOUT SHEET 3
- SECTION 104 LAYOUT SHEET 2
- S104 LAYOUT SHEET 1
- MANHOLE SCHEDULES - SHEET 6
- MANHOLE SCHEDULES - SHEET 5
- MANHOLE SCHEDULES - SHEET 4
- MANHOLE SCHEDULES - SHEET 3
- MANHOLE SCHEDULES - SHEET 2
- MANHOLE SCHEDULES - SHEET 1
- SECTION 104 DRAINAGE LONGSECTIONS - SHEET 2
- SECTION 104 DRAINAGE LONGSECTIONS - SHEET 1
- ROAD LONGSECTIONS SHEET 10
- ROAD LONGSECTIONS SHEET 9
- ROAD LONGSECTIONS SHEET 8
- ROAD LONGSECTIONS SHEET 2
- RISING MAIN LONGSECTIONS - SHEET 3
- RISING MAIN LONGSECTIONS - SHEET 2
- RISING MAIN LONGSECTIONS - SHEET 1
- ORIGINAL APPLICATION DC/14/2096/HYB DECISION NOTICE
- APPLICATION FORM - WITHOUT PERSONAL DATA
- CONDITION 26 - SITE OVERVIEW LAYOUT PLAN
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS AND HIGHWAYS DRAINAGE SITE LAYOUT PLAN
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS AND HIGHWAYS DRAINAGE SITE LAYOUT PLAN
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS AND HIGHWAYS DRAINAGE SITE LAYOUT PLAN
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS AND HIGHWAYS DRAINAGE SITE LAYOUT PLAN
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS LONGITUDINAL SECTIONS
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS CONSTRUCTION DETAILS
- CONDITIONS 12 AND 32 - SECTION 38 HIGHWAYS DRAINAGE CONSTRUCTION DETAILS
- CONDITION 33 - SPEED LIMIT REPEATER SIGNS AND ROADMARKINGS
- CONDITIONS 31 AND 33 - SECTION 278 FULL SITE PLAN
- CONDITION 23 - PRE-CONSTRUCT ARCHAEOLOGY
- CONDITION 33 - IMPERMEABLE AREA PLAN SHEET 1
- CONDITION 33 - IMPERMEABLE AREA PLAN SHEET 2
- CONDITION 33 - IMPERMEABLE AREA PLAN SHEET 3
- CONDITION 12 - PROPOSED SURFACE WATER BASIN CROSS-SECTIONS
- CONDITION 12 - SUDS CONSTRAUCTION DETAILS SHEET 2
- CONDITIONS 12, 16, 32 AND 33 - RISING MAIN LAYOUT AND LONGSECTION SHEET 1
- CONDITIONS 12, 16, 32 AND 33 - RISING MAIN LAYOUT AND LONGSECTION SHEET 2
- CONDITIONS 12, 16, 32 AND 33 - RISING MAIN LAYOUT AND LONGSECTION SHEET 3
- CONDITIONS 12, 16, 32 AND 33 - ROAD LONGSECTIONS SHEET 2
- CONDITIONS 12, 16, 32 AND 33 - ROAD LONGSECTIONS SHEET 8
- CONDITION 12, 16, 32 AND 33 - ROAD LONGSECTIONS SHEET 9
- CONDITIONS 12, 16, 32 AND 33 - ROAD LONGSECTIONS SHEET 10
- CONDITIONS 12, 16, 32 AND 33 - DRAINAGE LONGSECTIONS SHEET 1
- CONDITION 12, 16, 32 AND 33 - DRAINAGE LONGSECTIONS SHEET 2
- CONDITIONS 12 AND 16 - MANHOLE SCHEDULES SHEET 1
- CONDITIONS 12 AND 16 - MANHOLE SCHEDULES SHEET 2
- CONDITIONS 12 AND 16 - MANHOLE SCHEDULES SHEET 3
- CONDITION 16 - PRIVATE DRAINAGE CONSTRUCTION DETAILS SHEET 1
- CONDITION 16 - PRIVATE DRAINAGE CONSTRUCTION DETAILS SHEET 2
- CONDITIONS 12 AND 16 - S104 ADOPTABLE CONSTRUCTION DETAILS
- CONDITIONS 31 AND 33 - SECTION 38 FULL SITE PLAN
- CONDITION 37 - RESIDENTIAL TRAVEL PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with West Suffolk for determination, against a statutory target of eight weeks. Over the last year West Suffolk's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on West Suffolk's portal will say. Our guide explains the common types.