Planning application
Former Animal Health Trust Lanwades Park Kentford Newmarket Suffolk CB8 7UU
Works: New dwelling Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hybrid application - A. Planning application - a. private and affordable dwellings following demolition of specified existing buildings b. new commercial building (class E) on ground floor and flats above c. change of use of listed stable block to community use (class F2)/commercial use (class E) d. provision of open space including dedicated area of SANG, e. play space, f. new footpath link to Jeddah Way, g. landscaping, h. car parking and i. associated infrastructure with j. vehicular access from Sir Graham Kirkham Avenue, and Sire Lane B. Outline application (all matters reserved except access) - a. private and affordable dwellings, b. one form entry primary school with 60 space nursery, c. single 30 place nursery, d. allotments, e. provision of open space and SANG, f. play space, g. landscaping, h. car parking and i. associated infrastructure with j. vehicular access from the B1506 and School Road
As published by the council, reference DC/26/1379/HYB
Application record
- Reference
- DC/26/1379/HYB
- Status
- Pending Consideration
- Received
- 7 Sep 2026
- Validated
- 29 Oct 2026
- Ward
- Kentford And Moulton
- Parish
- Moulton
- Postcode
- CB8 7UU
Comment by 29 November 2026
The council is taking comments on this application until then. Comments go to West Suffolk through their own planning portal.
Site history
Applications at this address on the West Suffolk register
This site has had 2 applications since 2024: 0 approved, 1 refused.
-
DC/24/1167/FUL Refused
Former Animal Health Trust Lanwades Park Kentford Newmarket Suffolk CB8 7UU
Planning Application - a. infill glazing of openings and panels of existing buildings; b. external walls to existing buildings c. window and door openings to existing buildings; d. cycle storage; e. refuse storage
Timeline
Dates from the published record
-
7 Sep 2026
Received by West Suffolk
-
29 Oct 2026
Validated
Checked as complete and ready for consideration.
-
30 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
West Suffolk took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: DC/25/0624/HYB (Decided)
Who's behind it
Company information only, from the register and Companies House
Pegasus Group Ltd Agent
1,239 applications on PlanIndex · across 172 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
381 documents on file for this application
- HT LANDMARK BUILDING - THE PAWN - ELEVATIONS (COURTYARD)
- HT FOLLY 2 - THE BISHOP - ELEVATIONS (COURTYARD)
- HT FOLLY 1 - THE ROOK - ELEVATIONS (COURTYARD)
- TRANSPORT ASSESSMENT PART 1 OF 2
- TRANSPORT ASSESSMENT PART 2 OF 2
- BREEAM PRE-ASSESSMENT
- ENVIRONMENTAL STATEMENT - NON TECHNICAL SUMMARY
- ENVIRONMENTAL STATEMENT - MAIN VOLUME
- ENVIRONMENTAL STATEMENT - APPENDIX 2.4 PROJECT SITE RED LINE PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.5 SITE BOUNDARY PARAMETER PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.6 LAND USE PARAMETER PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.7 STOREY HEIGHTS PARAMETER PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.8 OPEN SPACE PARAMETER PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.9 MOVEMENT PARAMETER PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 2.10 ILLUSTRATIVE MASTERPLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 6.1 AIR QUALITY REPORT
- ENVIRONMENTAL STATEMENT - APPENDIX 8.1 LEGISLATION, POLICY AND GUIDANCE
- ENVIRONMENTAL STATEMENT - APPENDIX 8.2 ASSESSMENT METHODOLOGY - PROTECTED SPECIES SURVEYS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.3 ECOLOGY DRAWINGS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.4. ECOLOGICAL DESK STUDY
- ENVIRONMENTAL STATEMENT - APPENDIX 8.5. HABITAT CONDITION ASSESSMENTS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.6. PLANT SPECIES LIST
- ENVIRONMENTAL STATEMENT - APPENDIX 8.7. FUNGI EDNA ASSESSEMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 8.8. BREEDING BIRD SURVEY RESULTS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.9. SWECO STONE-CURLEW ASSESSMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 8.10 NE DAS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.11. STONE-CURLEW SCOPING ASSESSMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 8.12. BAT DNA ANALYSIS RESULTS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.13 FULL GLTA SURVEY RESULTS
- ENVIRONMENTAL STATEMENT - APPENDIX 8.14 AUTOMATED-STATIC BAT SURVEY DATA
- ENVIRONMENTAL STATEMENT - APPENDIX 9.1 HERITAGE IMPACT ASSESSMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 9.2 LANWADES HALL PLOTS
- ENVIRONMENTAL STATEMENT - APPENDIX 9.3 HERITAGE ASSET PLAN
- ENVIRONMENTAL STATEMENT - APPENDIX 9.4 HER CAMBRIDGE AND SUFFOLK
- ENVIRONMENTAL STATEMENT - APPENDIX 10.1 LVIA FIGURES
- ENVIRONMENTAL STATEMENT - APPENDIX 10.2 SITE PHOTOS
- ENVIRONMENTAL STATEMENT - APPENDIX 10.3 REPRESENTATIVE VIEWS
- ENVIRONMENTAL STATEMENT - APPENDIX 10.4 EXTRACT OF SLCA 13 ROLLING ESTATE CHALKLANDS
- ENVIRONMENTAL STATEMENT - APPENDIX 10.5 EXTRACT OF WSLCA A5 KENNETT VALLEY AND G1
- ENVIRONMENTAL STATEMENT - APPENDIX 10.6 EXTRACT OF REVIEW OF LOCAL LANDSCAPE DESIGNATIONS LVL5 KENNETT VALLEY
- ENVIRONMENTAL STATEMENT - APPENDIX 10.7 PHOTOMONTAGES
- ENVIRONMENTAL STATEMENT - APPENDIX 10.8 METHODOLOGY AND SURVEY
- ENVIRONMENTAL STATEMENT - APPENDIX 11.1 BASELINE NOISE SURVEY.
- ENVIRONMENTAL STATEMENT - APPENDIX 11.2 CONSTRUCTION NOISE ASSESSMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 11.3 ROAD TRAFFIC NOISE CALCULATIONS
- ENVIRONMENTAL STATEMENT - APPENDIX 13.1 TRANSPORT STUDY AREA
- ENVIRONMENTAL STATEMENT - APPENDIX 13.2 COLLISION DATA
- ENVIRONMENTAL STATEMENT - APPENDIX 14.1 GREENHOUSE GAS EMISSIONS AND MITIGATION
- ENVIRONMENTAL STATEMENT - APPENDIX 14.2 CLIMATE CHANGE RISK ASSESSMENT
- SUDS PROFORMA
- ASSESSMENT OF WEST SUFFOLK'S 5YHLS
- RETAIL ASSESSMENT
- SUBMISSION SCHEDULE 28.08.2026
- HT E-RANDF - ELEVATIONS
- HT E-RANDF - FLOOR PANS
- HT E1 -RANDF - ELEVATIONS 1
- HT E1 -RANDF - ELEVATIONS 2
- HT F1-B - ELEVATIONS
- HT G1-R - FLOOR PLANS
- HT G1-R - ELEVATIONS
- HT S-F - FLOOR PLANS
- HT TERRACED B TYPES & 2B4P BUNGALOW - FLOOR PLANS
- HT TERRACED B TYPES & 2B4P BUNGALOW - ELEVATIONS
- TRIPLE CARPORT 2 PLOTS 130-131 - FLOOR PLANS AND ELEVATIONS
- LARGE SCALE BOUNDARY TREATMENTS - GARDEN WALLS
- LARGE SCALE BOUNDARY TREATMENTS - FENCES AND GARDENS
- LARGE SCALE BOUNDARY TREATMENTS - FENCES AND GARDENS 2
- LARGE SCALE BOUNDARY TREATMENTS - FOLLY 1 AND 2 (THE ROOK AND THE BISHOP)
- LARGE SCALE BOUNDARY TREATMENTS - LANDMARK BUILDING (THE PAWN)
- JOHN MACDOUGALL VISITOR CENTRE - GROUND FLOOR PLAN
- JOHN MACDOUGALL VISITOR CENTRE - FIRST FLOOR PLAN
- JOHN MACDOUGALL VISITOR CENTRE - ELEVATIONS 1
- JOHN MACDOUGALL VISITOR CENTRE - ELEVATIONS 2
- PUMPING STATION DETAILS
- SUB STATION DETAILS
- LANDSCAPE PROPOSALS - SHEET 3 OF 7
- LANDSCAPE PROPOSALS - SHEET 4 OF 7
- LANDSCAPE PROPOSALS - SHEET 6 OF 7
- LANDSCAPE PROPOSALS - SHEET 7 OF 7
- LANDSCAPE PROPOSALS - SHEET 2 OF 7
- LANDSCAPE PROPOSALS - SHEET 1 OF 7
- LANDSCAPE PROPOSALS - DETAILS AND SPECIFICATION
- LANDSCAPE PROPOSALS - SHEET 5 OF 7
- LANDSCAPE STRATEGY PART 1
- LANDSCAPE STRATEGY PART 2
- LANDSCAPE STRATEGY PART 3
- LANDSCAPE STRATEGY PART 4
- LANDSCAPE STRATEGY PART 5
- LANDSCAPE STRATEGY PART 6
- ENVIRONMENTAL STATEMENT - APPENDIX 3.2 ARB IMPACT ASSESSMENT (WEST)
- ENVIRONMENTAL STATEMENT - APPENDIX 3.1 ARB IMPACT ASSESSMENT (EAST)
- EXISTING ARBORICULTURAL IMPACT ASSESSMENT
- PROPOSED ARBORICULTURAL IMPACT ASSESSMENT
- TPO OVERLAY
- WOODLAND MANAGEMENT PLAN
- WOODLAND MANAGEMENT PLAN
- WOODLAND MANAGEMENT PLAN
- ARBORICULTURAL IMPACT ASSESSMENT
- HT A2-B - ELEVATIONS
- HT A1-B - FLOOR PLANS
- HT A-R - ELEVATIONS
- HT A-R - FLOOR PLANS
- HT A-B - ELEVATIONS
- HT A-B - FLOOR PLANS
- HT A1-B - ELEVATIONS
- HT A2-B - FLOOR PLANS
- HT B4-F - FLOOR PLANS
- HT B4-B - ELEVATIONS
- HT B4-B - FLOOR PLANS
- HT B3-B - FLOOR PLANS
- HT B3-B - ELEVATIONS
- HT B-B - ELEVATIONS
- HT B-F - FLOOR PLANS
- HT B-F - ELEVATIONS
- HT B1-B - FLOOR PLANS
- HT B1-B - ELEVATIONS
- HT B2-F - FLOOR PLANS
- HT B2-F - ELEVATIONS
- HT B4-F - ELEVATIONS
- HT B-B - FLOOR PLANS
- HT C-F - FLOOR PLANS
- HT C-F - ELEVATIONS
- HT C-B - FLOOR PLANS
- HT C-B - ELEVATIONS
- HT C4-B - FLOOR PLANS
- HT C3-B - ELEVATIONS
- HT C3-B - FLOOR PLANS
- HT C2-R - ELEVATIONS
- HT C2-R - FLOOR PLANS
- HT C1-B - ELEVATIONS
- HT C1-B - FLOOR PLANS
- HT C4-B - ELEVATIONS
- HT D1-B - FLOOR PLANS
- HT D-B - ELEVATIONS
- HT D-B - FLOOR PLANS
- HT D1-B - ELEVATIONS
- HT E R AND F - FLOOR PLANS
- HT F1-R -ELEVATIONS
- HT F2-B - FLOOR PLANS
- HT F1-B - FLOOR PLANS
- HT F-R - FLOOR PLANS
- HT F-R - ELEVATIONS
- HT F1-R - FLOOR PLANS
- HT F-B - ELEVATIONS
- HT F-B - FLOOR PLANS
- HT F2-B - ELEVATIONS
- HT G2-R - FLOOR PLANS
- HT G-B -ELEVATIONS
- HT G-B -FLOOR PLANS
- HT G2-R - ELEVATIONS
- HT H1-B - FLOOR PLANS
- HT H-B - ELEVATIONS
- HT H-B - FLOOR PLANS
- HT H1-B - ELEVATIONS
- HT J1-R - FLOOR PLANS
- HT J-B - FLOOR PLANS
- HT J-B - ELEVATIONS
- HT J1-R - ELEVATIONS
- HT K1-B AND R - FLOOR PLANS
- HT K-B AND R - ELEVATIONS
- HT K-B AND R -FLOOR PLANS
- HT K1-B AND R - ELEVATIONS
- HT M1-R,M2-R,M2.1-R,M3-F - ELEVATIONS 1
- HT M1-R,M2-R,M2.1-R,M3-F - GROUND FLOOR PLANS
- HT M1-R,M2-R,M2.1-R,M3-F - FIRST FLOOR PLANS
- HT M1-R,M2-R,M2.1-R,M3-F - ELEVATIONS 2
- HT N1-B - FLOOR PLANS
- HT N-B - ELEVATIONS
- HT N-B - FLOOR PLANS
- HT N1-B - ELEVATIONS
- HT Q-B - FLOOR PLANS
- HT Q-B - ELEVATIONS
- HT S-F - ELEVATIONS
- HT CH2.1-TB - ELEVATIONS
- HT CH3.1-TB - FLOOR PLANS
- HT CH1.1-TB - ELEVATIONS
- HT CH2.1-TB - FLOOR PLANS
- HT CH1.1-TB - FLOOR PLANS
- HT CH3.1-TB - ELEVATIONS
- HT SCHOOL HOUSE - ELEVATIONS 1
- HT SCHOOL HOUSE - SECOND FLOOR PLANS
- HT SCHOOL HOUSE - FIRST FLOOR PLANS
- HT SCHOOL HOUSE - GROUND FLOOR PLANS
- HT SCHOOL HOUSE -ELEVATIONS 2
- HT BARN COMPLEX - FLOOR PLANS2
- HT BARN COMPLEX - ELEVATIONS
- HT MAISONETTE COMPLEX 1 - ELEVATIONS
- HT MAISONETTE COMPLEX 1 - GROUND FLOOR PLAN
- HT MAISONETTE COMPLEX 1 - FIRST FLOOR PLAN
- HT MAISONETTE COMPLEX 2 - FIRST FLOOR PLAN
- HT MAISONETTE COMPLEX 2 - ELEVATIONS
- HT MAISONETTE COMPLEX 3 - ELEVATIONS 1
- HT MAISONETTE COMPLEX 3 - ELEVATIONS 2
- HT MAISONETTE COMPLEX 3 - GROUND FLOOR PLAN
- HT MAISONETTE COMPLEX 3 - FIRST FLOOR PLAN
- HT FLYING LINK - TYPICAL ADJOINING ELEVATIONS
- HT LODGE - ELEVATIONS AND FLOOR PLANS
- HT STABLE - FIRST FLOOR PLAN
- HT STABLE - GROUND FLOOR PLAN
- HT STABLE - ELEVATIONS (EXTERNAL)
- HT STABLE - ELEVATIONS (INTERNAL)
- HT FLATS AND SHOP - ELEVATIONS AND FLOOR PLANS
- HT AH-2.1 - FLOOR PLANS
- HT AH-2.1 - ELEVATIONS
- HT AH-2.2 - FLOOR PLANS
- HT AH-2.2 - FLOOR PLANS
- HT AH-3.1 - FLOOR PLANS
- HT AH-3.1 - ELEVATIONS
- HT AH-3.2 - ELEVATIONS
- HT AH-3.2 -FLOOR PLANS
- HT AH-3.3 - FLOOR PLANS
- HT AH-3.3 - ELEVATIONS
- HT AH-4.1 - ELEVATIONS
- HT AH-4.1 - FLOOR PLANS
- HT AH-4.2 - FLOOR PLANS
- HT AH-4.2 - ELEVATIONS
- HT AH-5.1 - ELEVATIONS
- HT AH-5.1 - FLOOR PLANS
- HT AM1- R,AM2- R,AM2.1- R,AM3- F - GROUND FLOOR PLANS
- HT AM1- R,AM2- R,AM2.1- R,AM3- F - FIRST FLOOR PLANS
- HT AM1- R,AM2- R,AM2.1- R,AM3- F - ELEVATIONS 1
- HT AM1- R,AM2- R,AM2.1- R,AM3- F - ELEVATIONS 2
- HT ACH1.1 - FLOOR PLANS
- HT ACH1.1 - ELEVATIONS
- HT ACH1.2-TB - ELEVATIONS
- HT ACH1.2-TB - FLOOR PLANS
- HT AM COMPLEX 1 - GROUND FLOOR PLANS
- HT AM COMPLEX 1 - FIRST FLOOR PLANS
- HT AM COMPLEX 1 - ELEVATIONS
- HT AM COMPLEX 2 - ELEVATIONS
- HT AM COMPLEX 2 - GROUND FLOOR PLAN
- HT AM COMPLEX 2 - FIRST FLOOR PLAN
- HT AM COMPLEX 3 - FLOOR PLANS
- HT AM COMPLEX 3 - ELEVATIONS 1
- HT AM COMPLEX 3 - ELEVATIONS 2
- HT ANNEX 1 - ELEVATIONS AND FLOOR PLANS
- HT ANNEX 2 - ELEVATIONS AND FLOOR PLANS
- HT ANNEX 3 - ELEVATIONS AND FLOOR PLANS
- PLOTS 203,205,206,207 GARAGE COMPLEX 1 - ELEVATIONS AND FLOOR PLANS
- PLOTS 217,218 GARAGE COMPLEX 2 - ELEVATIONS AND FLOOR PLANS
- PLOTS 239,240,241 DOUBLE CAR PORT - ELEVATIONS AND FLOOR PLANS
- PLOTS 12,13,14, TRIPLE CAR PORT 1 - ELEVATIONS AND FLOOR PLANS
- PLOT 171CARPORT AND DRIVE THROUGH - ELEVATIONS AND FLOOR PLANS
- PLOTS 130,131 TRIPLE CARPORT 2 - ELEVATIONS AND FLOOR PLANS
- PLOTS 114-116 CARPORT COMPLEX 1 - ELEVATIONS AND FLOOR PLANS
- CYCLE AND REFUSE STORES 1 - ELEVATIONS AND FLOOR PLANS
- PLOTS 1-9 CAR PORT AND REFUSE STORE - ELEVATIONS AND FLOOR PLANS
- CAR PORT AND REFUSE STORE 2 - ELEVATIONS AND FLOOR PLANS
- PLOTS 1-9 CYCLE STORE - ELEVATIONS AND FLOOR PLANS
- SINGLE GARAGE - ELEVATIONS AND FLOOR PLANS
- TWIN GARAGE - ELEVATIONS AND FLOOR PLANS
- DOUBLE GARAGE - ELEVATIONS AND FLOOR PLANS
- CYCLE STORE AND GARAGE/STORE - ELEVATIONS AND FLOOR PLANS
- COMMUNAL ELECTRIC BIKE STORAGE - ELEVATIONS AND FLOOR PLANS
- STREET SCENE ELEVATIONS 1-3
- STREET SCENE ELEVATIONS 1-3
- DEMOLITION PLAN ELEVATIONS - BUILDING 1 LAB 1
- DEMOLITION PLAN ELEVATIONS - BUILDING 1 LAB 2
- DEMOLITION PLAN ELEVATIONS - BUILDING 3 LAB 3
- DEMOLITION PLAN ELEVATIONS - BUILDING 4 LAB 4
- DEMOLITION PLAN ELEVATIONS - BUILDING 5 LAB 5
- DEMOLITION PLAN ELEVATIONS - BUILDING 6 LAB 6
- DEMOLITION PLAN ELEVATIONS - BUILDING 7 DUTCH BARN
- DEMOLITION PLAN ELEVATIONS - BUILDING 8 OFFICES
- DEMOLITION PLAN ELEVATIONS - BUILDING 9 OFFICES
- DEMOLITION PLAN ELEVATIONS - BUILDING 10 BARN
- DEMOLITION PLAN ELEVATIONS - BUILDING 11 CENTRE FOR SMALL STUDIES
- DEMOLITION PLAN ELEVATIONS - BUILDING 12 RADIOTHERAPY
- DEMOLITION PLAN ELEVATIONS - BUILDING 13 MRI
- DEMOLITION PLAN ELEVATIONS - BUILDING 14 XRAY SCINTIGRAPHY
- DEMOLITION PLAN ELEVATIONS - BUILDING 16 VACCINE CENTRE
- DEMOLITION PLAN ELEVATIONS - BUILDING 17 HYDROTHERAPY BUILDING
- DEMOLITION PLAN ELEVATIONS - BUILDING 18 KENNELS
- DEMOLITION PLAN ELEVATIONS - BUILDING 19 OFFICE
- DEMOLITION PLAN ELEVATIONS - BUILDING 20 VISITORS ACCOMODATION
- DEMOLITION PLAN ELEVATIONS - BUILDING 21 STORE
- DEMOLITION PLAN ELEVATIONS - BUILDING 22 EXERCISE/TREADMILL UNIT
- DEMOLITION PLAN ELEVATIONS - BUILDING 23 STABLES
- DEMOLITION PLAN ELEVATIONS - BUILDING 24 STABLES
- DEMOLITION PLAN ELEVATIONS - BUILDING 25 STABLES
- DEMOLITION PLAN ELEVATIONS - BUILDING 26 MRI BARN
- DEMOLITION PLAN ELEVATIONS - BUILDING 27 FORGE BARN
- DEMOLITION PLAN ELEVATIONS - BUILDING 28 STORE/BARNS
- DEMOLITION PLAN ELEVATIONS - BUILDING 29 STABLES
- DEMOLITION PLAN ELEVATIONS - BUILDING 30 ISOLATION STABLES
- DEMOLITION PLAN ELEVATIONS - BUILDING 31 VACCINE CENTRE
- DEMOLITION PLAN ELEVATIONS - BUILDING 32 PADDOCK BARN
- HT FOLLY 1 - THE ROOK - ELEVATIONS
- HT FOLLY 1 - THE ROOK - GROUND AND FIRST FLOOR PLANS
- HT FOLLY 1 - THE ROOK - SECOND AND THIRD FLOOR PLANS
- HT FOLLY 1 - THE ROOK - SECOND AND THIRD FLOOR PLANS
- HT FOLLY 2 - THE BISHOP - SECOND FLOOR PLANS
- HT FOLLY 2 - THE BISHOP - GROUND AND FIRST FLOOR PLANS
- HT FOLLY 2 - THE BISHOP - ELEVATIONS
- HT LANDMARK BUILDING - THE PAWN - ELEVATIONS
- HT LANDMARK BUILDING - THE PAWN - FLOOR PLANS
- MEMORIAL OBELISK - ELEVATIONS
- PARAMETER PLAN - SITE BOUNDARY
- PARAMETER PLAN - LAND USE PLAN
- PARAMETER PLAN - STOREY HEIGHTS PLAN
- PARAMETER PLAN - OPEN SPACE STRATEGY
- PARAMETER PLAN - MOVEMENT HIERARCHY PLAN
- PARAMETER PLAN - PHASING PLAN
- LOCATION PLAN - HYBRID
- EXISTING SITE PLAN - HYBRID
- TECHNICAL PLANNING LAYOUT - SHEET 1 OF 3
- TECHNICAL PLANNING LAYOUT - SHEET 2 OF 3
- TECHNICAL PLANNING LAYOUT - SHEET 3 OF 3
- PLANNING LAYOUT - SHEET 1 OF 3
- PLANNING LAYOUT - SHEET 2 OF 3
- PLANNING LAYOUT - SHEET 3 OF 3
- CAR PARKING AND CYCLE STORAGE STRATEGY - SHEET 1 OF 3
- CAR PARKING AND CYCLE STORAGE STRATEGY - SHEET 2 OF 3
- CAR PARKING AND CYCLE STORAGE STRATEGY - SHEET 3 OF 3
- BOUNDARY TREATMENT PLAN - SHEET 1 OF 3
- BOUNDARY TREATMENT PLAN - SHEET 2 OF 3
- BOUNDARY TREATMENT PLAN - SHEET 3 OF 3
- REFUSE AND RECYCLING STRATEGY - SHEET 1 OF 3
- REFUSE AND RECYCLING STRATEGY - SHEET 2 OF 3
- REFUSE AND RECYCLING STRATEGY - SHEET 3 OF 3
- FIRE STRATEGY - SHEET 1 OF 3
- FIRE STRATEGY - SHEET 2 OF 3
- FIRE STRATEGY - SHEET 3 OF 3
- DEMOLITION PLAN
- MASTERPLAN DETAILED LAYOUT (RENDERED)
- MASTERPLAN (RENDERED)
- BNG METRIC - HYBRID
- BNG METRIC - DETAILED
- BIODIVERSITY NET GAIN ASSESSMENT - PART 1
- BIODIVERSITY NET GAIN ASSESSMENT - PART 2
- HABITATS REGULATIONS ASSESSMENT - PART 1
- HABITATS REGULATIONS ASSESSMENT - PART 2
- ENVIRONMENTAL STATEMENT - APPENDIX 4.2 LIGHTING STRATEGY - PART 1
- ENVIRONMENTAL STATEMENT - APPENDIX 4.2 LIGHTING STRATEGY - PART 2
- MARKET AND MARKETING EVIDENCE - APPENDIX 4
- ENVIRONMENTAL STATEMENT - APPENDIX 2.1 (ARCHAEOLOGY DBA EASTERN AREA)
- ENVIRONMENTAL STATEMENT - APPENDIX 2.2 (ARCHAEOLOGY DBA WESTERN AREA)
- BIODIVERSITY CHECKLIST
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 2 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 3 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 4 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 5 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 6 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 8 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 8 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 1 OF 9
- ENVIRONMENTAL STATEMENT - APPENDIX 7.1 FLOOD RISK ASSESSMENT - PART 9 OF 9
- DESIGN AND ACCESS STATEMENT PART 1 OF 7
- DESIGN AND ACCESS STATEMENT PART 2 OF 7
- DESIGN AND ACCESS STATEMENT PART 3 OF 7
- DESIGN AND ACCESS STATEMENT PART 4 OF 7
- DESIGN AND ACCESS STATEMENT PART 5 OF 7
- DESIGN AND ACCESS STATEMENT PART 6 OF 7
- DESIGN AND ACCESS STATEMENT PART 7 OF 7
- MARKET AND MARKETING EVIDENCE JULY 2026
- ECONOMIC BENEFITS REPORT
- CIRCULAR ECONOMY STATEMENT
- ENVIRONMENTAL STATEMENT - APPENDIX 14.3 ENERGY AND SUSTAINABILITY
- ENVIRONMENTAL STATEMENT - APPENDIX 14.4 WHOLE LIFE CARBON
- BENCHMARK LAND VALUE ASSESSMENT
- PLANNING AND AFFORDABLE HOUSING STATEMENT
- COVER LETTER
- HEALTH IMPACT ASSESSMENT
- FEASIBILITY STUDY - PRIMARY SCHOOL
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 1 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 10 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 11 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 12 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 13 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 2 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 3 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 4 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 5 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 6 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 7 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 8 OF 13
- ENVIRONMENTAL STATEMENT - APPENDIX 2.3 GROUND CONDITIONS TECH NOTE PART 9 OF 13
- SCHEDULE OF ACCOMODATION
- ENVIRONMENTAL STATEMENT - APPENDIX 11.4 ACOUSTIC PLANNING REPORT
- FRAMEWORK TRAVEL PLAN
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with West Suffolk for determination, against a statutory target of eight weeks. Over the last year West Suffolk's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on West Suffolk's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Former Animal Health Trust Lanwades Park Kentford Newmarket Suffolk CB8 7UU
Planning Application - a. infill glazing of openings and panels of existing buildings; b. external walls to existing buildings c. window and door openings to existing buildings; d. cycle storage; e. refuse storage
Refused Full applications Extension Windows or glazing 90 docs -
6 Larnach Drive Kentford Newmarket Suffolk CB8 7RF
Householder planning application - rear conservatory extension
Granted Householder Extension 9 docsSmall domestic -
Lanwades Hall Lanwades Park Kentford Suffolk CB8 7UA
Planning application - change of use of two rooms from office, fitness facilities, wedding venue, conference and function and beauty treatment rooms (class E) to wedding guest accommodation and holiday lets with the installation of ensuite bathroom facilities (sui generis)
Granted Full applications 15 docs -
Lanwades Hall Lanwades Park Kentford Suffolk CB8 7UA
Application for listed building consent - a. internal alterations to existing door b. installation of two ensuite bathroom facilities
Granted Heritage and listed buildings 11 docs -
2 Jeddah Way Kentford Suffolk CB8 8JY
TPO 02 (2010) tree preservation order - one silver birch (T178 on plan and on order) fell
Refused Trees 5 docs -
New Dwellings Jeddah Way Kentford Suffolk CB8 8JY
96% historically approved · decision due ~26 Mar
Planning application - a. variation of condition two of DC/22/0169/VAR to enable the use of amended approved layout for plot 1 for the five dwellings with associated car parking and landscaping, b. discharge of conditions 2 (approved plans),9 (ecological enhancements),10 (lighting) and 13 (water use) of DC/22/0169/VAR
Awaiting decision Amendments 17 docsSeveral homes