Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North Of Wales End Road Wales End Road Cavendish Suffolk

Awaiting decision West Suffolk DC/25/1027/FUL Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Planning application - proposed hybrid renewable energy scheme for the construction and operation of a solar farm and battery energy storage system (BESS), with associated works, equipment and necessary infrastructure

As published by the council, reference DC/25/1027/FUL

Application record

Reference
DC/25/1027/FUL
Type
Full Planning Application
Status
Pending Decision
Received
26 Jun 2025
Validated
14 Jul 2025
Ward
Clare, Hundon And Kedington
Parish
Cavendish

Timeline

Dates from the published record

  1. 26 Jun 2025

    Received by West Suffolk

  2. 14 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Suffolk took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Laurence Associates Agent, registered in Cambridge

Dissolved · incorporated 2007 · Cambridge

307 applications on PlanIndex · across 7 councils · 79% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Cavendish Solar Limited Applicant, registered in London

Active · incorporated 2024 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

231 documents on file for this application

  • SCC ARCHAEOLOGICAL SERVICE Consultation Response · 25 Sep 2026
  • RESPONSE TO SCC HIGHWAYS AUTHORITY FROM AGENT Supporting Documents · 15 Sep 2026
  • TREE OFFICER Consultation Response · 28 Aug 2026
  • PROPOSED LAYOUT Site and Other Plans/Drawings · 20 Aug 2026
  • TREE SCHEDULE Supporting Documents · 20 Aug 2026
  • RPA Supporting Documents · 20 Aug 2026
  • UPDATED LANDSCAPE OFFICER COMMENT Consultation Response · 17 Jul 2026
  • UPDATED LVIA Supporting Documents · 15 Jul 2026
  • UPDATED LVIA Supporting Documents · 01 Jul 2026
  • UPDATED LANDSCAPE MASTERPLAN Site and Other Plans/Drawings · 01 Jul 2026
  • RESPONSE TO PARISH COUNCIL Supporting Documents · 12 May 2026
  • GEOPHYSICAL SURVEY Supporting Documents · 12 May 2026
  • SUFFOLK WILDLIFE TRUST UPDATED RESPONSE Consultation Response · 25 Feb 2026
  • LANDSCAPE OFFICER Consultation Response · 19 Dec 2025
  • HTTC LTD ON BEHALF OF WALES END SOLAR FARM GROUP - COMMENTS Neighbour Response · 12 Dec 2025
  • ROBBS FARM BARN - COMMENTS Neighbour Response · 05 Dec 2025
  • SCC PUBLIC RIGHTS OF WAY Consultation Response · 02 Dec 2025
  • SCC FLOODS & WATER Consultation Response · 01 Dec 2025
  • REVISED AIA Supporting Documents · 14 Nov 2025
  • FRA AND SUDS ADDITIONAL INFORMATION Supporting Documents · 14 Nov 2025
  • NETHER HALL PEACOCKS ROAD - COMMENT Neighbour Response · 14 Nov 2025
  • HIGHWAYS TECHNICAL NOTE Application Correspondence · 05 Nov 2025
  • NETHER HALL - COMMENTS Neighbour Response · 04 Nov 2025
  • 24 WEST PARK ROAD - COMMENTS Neighbour Response · 23 Oct 2025
  • COEPS, THE GREEN - COMMENTS Neighbour Response · 13 Oct 2025
  • 2 PENTLOW DRIVE - COMMENTS Neighbour Response · 13 Oct 2025
  • OLD VICARAGE, NEW HOUSE LANE - COMMENTS Neighbour Response · 11 Oct 2025
  • ARBORICULTURAL OFFICER Consultee Comment · 07 Oct 2025
  • MEMBER OF PARLIAMENT - COMMENTS Neighbour Response · 22 Sep 2025
  • 7 HAREWOOD AVENUE - COMMENTS Neighbour Response · 18 Sep 2025
  • ROBBS FARM BARN - FURTHER COMMENTS Neighbour Response · 17 Sep 2025
  • AMENDED TREE SURVEY - NORTH Site and Other Plans/Drawings · 15 Sep 2025
  • AMENDED TREE SCHEDULE Supporting Documents · 15 Sep 2025
  • AMENDED TREE CONSTRAINTS PLAN, ARBORICULTURAL IMPACT ASSESSMENT AND TREE PROTECTION PLAN Site and Other Plans/Drawings · 15 Sep 2025
  • AMENDED TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENT Supporting Documents · 15 Sep 2025
  • DORAY, PEACOCKS ROAD - COMMENTS Neighbour Response · 11 Sep 2025
  • CHURCH FARM, BARN ROAD - COMMENTS Neighbour Response · 05 Sep 2025
  • FIVE BELLS, THE GREEN - COMMENTS Neighbour Response · 05 Sep 2025
  • THE POND HOUSE - COMMENTS Neighbour Response · 03 Sep 2025
  • THE GEORGE - COMMENTS Neighbour Response · 03 Sep 2025
  • 3 LIME VILLA - COMMENTS Neighbour Response · 02 Sep 2025
  • 1 PARK VIEW - COMMENTS Neighbour Response · 01 Sep 2025
  • MOORS FARM - COMMENTS Neighbour Response · 29 Aug 2025
  • CHESTNUT COTTAGE, LOWER STREET - COMMENTS Neighbour Response · 28 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT Supporting Documents · 26 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT - APPENDICES PART 1 Supporting Documents · 26 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT - APPENDICES PART 2 Supporting Documents · 26 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT - APPENDICES PART 3 Supporting Documents · 26 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT - APPENDICES PART 4 Supporting Documents · 26 Aug 2025
  • ECOLOGICAL IMPACT ASSESSMENT - APPENDICES PART 5 Supporting Documents · 26 Aug 2025
  • THE OLD RECTORY - COMMENTS Neighbour Response · 26 Aug 2025
  • 5 BLACKLANDS HALL FARM BARNS - COMMENTS Neighbour Response · 26 Aug 2025
  • 15 PENTLOW DRIVE - COMMENTS Neighbour Response · 26 Aug 2025
  • ROSE BANK, 11A PEACOCKS CLOSE - COMMENTS Objection Comment · 25 Aug 2025
  • CAVENDISH LODGE - COMMENTS Neighbour Response · 22 Aug 2025
  • 1 PEACOCKS ROAD - COMMENTS Neighbour Response · 21 Aug 2025
  • 18 GREYS CLOSE - COMMENTS Neighbour Response · 21 Aug 2025
  • 27 PEACOCKS CLOSE - COMMENTS Neighbour Response · 21 Aug 2025
  • GLENVIEW, MELFORD ROAD - COMMENTS Neighbour Response · 20 Aug 2025
  • THE BLACK HOUSE - COMMENTS Neighbour Response · 18 Aug 2025
  • 38 PEACOCKS CLOSE - COMMENTS Neighbour Response · 15 Aug 2025
  • BAYNARDS - COMMENTS Neighbour Response · 14 Aug 2025
  • 24 GREYS CLOSE - FURTHER COMMENTS Neighbour Response · 14 Aug 2025
  • GOOSEMANS, PEACOCKS ROAD - COMMENTS Neighbour Response · 14 Aug 2025
  • SCC FLOODS & WATER Consultation Response · 14 Aug 2025
  • SUFFOLK FIRE & RESCUE Consultation Response · 13 Aug 2025
  • 4-5 HOUGHTON HALL COTTAGE - COMMENTS Neighbour Response · 13 Aug 2025
  • 13 THE COLUMBINES - COMMENTS Neighbour Response · 13 Aug 2025
  • 10 ANDREWS CLOSE - COMMENTS Neighbour Response · 13 Aug 2025
  • NETHERDENE, PEACOCKS ROAD - COMMENTS Neighbour Response · 13 Aug 2025
  • ALMORE HOUSE, HIGH STREET - COMMENTS Neighbour Response · 13 Aug 2025
  • 12 GREYS CLOSE - COMMENTS Neighbour Response · 13 Aug 2025
  • KIMSON COTTAGE - COMMENTS Neighbour Response · 12 Aug 2025
  • 14 PEACOCKS CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • 26 PEACOCKS CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • CORNER BUNGALOW, POOLE STREET - COMMENTS Neighbour Response · 12 Aug 2025
  • BURGHLEY HOUSE, THE GREEN - COMMENTS Neighbour Response · 12 Aug 2025
  • AMENDED APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 12 Aug 2025
  • 3 THE COLUMBINES - COMMENTS Neighbour Response · 12 Aug 2025
  • 6 ORCHARD CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • 6 ORCHARD CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • 13 THE COLUMBINES - COMMENTS Neighbour Response · 12 Aug 2025
  • 10 GREYS CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • 42 PEACOCKS CLOSE - COMMENTS Neighbour Response · 12 Aug 2025
  • PRENTICE HOUSE, HIGH STREET - COMMENTS Neighbour Response · 12 Aug 2025
  • 5 THE COLUMBINES - COMMENTS Neighbour Response · 12 Aug 2025
  • PENTLOW MILL, PENTLOW LANE - COMMENTS Neighbour Response · 11 Aug 2025
  • 8 PENTLOW DRIVE - COMMENTS Neighbour Response · 11 Aug 2025
  • HIGHFIELD HOUSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 9 CHURCH CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • FAILTE, PEACOCKS ROAD - COMMENTS Neighbour Response · 11 Aug 2025
  • 16 PEACOCKS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 57 PEACOCKS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 56 PEACOCKS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • PARISH COUNCIL Consultation Response · 11 Aug 2025
  • 24 GREYS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 4 GREYS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 11 PEACOCKS CLOSE - COMMENTS Neighbour Response · 11 Aug 2025
  • 11 PEACOCKS CLOSE - COMMENTS Neighbour Response · 10 Aug 2025
  • 14 THE MALTINGS - COMMENTS Neighbour Response · 10 Aug 2025
  • STOUR VIEW, POOLE STREET - COMMENTS Neighbour Response · 10 Aug 2025
  • FLINT HOUSE, POOLE STREET - COMMENTS Neighbour Response · 10 Aug 2025
  • 40 PEACOCKS CLOSE - COMMENTS Neighbour Response · 09 Aug 2025
  • PEEL HOUSE - COMMENTS Neighbour Response · 09 Aug 2025
  • 11 PEACOCKS ROAD - COMMENTS Neighbour Response · 09 Aug 2025
  • 15 PEACOCKS CLOSE - COMMENTS Neighbour Response · 08 Aug 2025
  • WAVER HOUSE, THE GREEN - COMMENTS Neighbour Response · 08 Aug 2025
  • SCC PUBLIC RIGHTS OF WAY Consultation Response · 08 Aug 2025
  • WHITE HOUSE, NETHER ROAD - COMMENTS Neighbour Response · 08 Aug 2025
  • 14 GREYS CLOSE - COMMENTS Neighbour Response · 08 Aug 2025
  • PEACOCKS HOUSE - COMMENTS Neighbour Response · 07 Aug 2025
  • 49 PEACOCKS CLOSE - COMMENTS Neighbour Response · 07 Aug 2025
  • 49 PEACOCKS CLOSE - COMMENTS Neighbour Response · 07 Aug 2025
  • 56 PEACOCKS CLOSE - COMMENTS Neighbour Response · 07 Aug 2025
  • BRAMLEY HOUSE - COMMENTS Neighbour Response · 07 Aug 2025
  • BAYNARDS - COMMENTS Neighbour Response · 07 Aug 2025
  • 2 GREYS CLOSE - COMMENTS Neighbour Response · 07 Aug 2025
  • OVERHALL - COMMENTS Neighbour Response · 07 Aug 2025
  • THE GEORGE SAVAGE TRUST - COMMENTS Neighbour Response · 07 Aug 2025
  • 22 GREYS CLOSE - COMMENTS Neighbour Response · 07 Aug 2025
  • SUFFOLK WILDLIFE TRUST Consultation Response · 07 Aug 2025
  • SCC ARCHAEOLOGICAL SERVICE Consultation Response · 07 Aug 2025
  • SCC HIGHWAYS AUTHORITY Consultation Response · 07 Aug 2025
  • ROSE COTTAGE - COMMENTS Neighbour Response · 06 Aug 2025
  • LLAINOLEU ISAF - COMMENTS Neighbour Response · 06 Aug 2025
  • BRAMLEY HOUSE, PEACOCKS ROAD - COMMENTS Neighbour Response · 06 Aug 2025
  • 17 GREYS CLOSE - COMMENTS Neighbour Response · 06 Aug 2025
  • OLD ROMNEY - COMMENTS Neighbour Response · 06 Aug 2025
  • PUBLIC HEALTH & HOUSING Consultee Comment · 06 Aug 2025
  • 35 PEACOCKS CLOSE - COMMENTS Neighbour Response · 06 Aug 2025
  • OLD FORGE HOUSE -COMMENTS Neighbour Response · 06 Aug 2025
  • 1 MANOR COTTAGES - COMMENTS Neighbour Response · 06 Aug 2025
  • 6 GREYS CLOSE - COMMENTS Neighbour Response · 06 Aug 2025
  • 1 MANOR COTTAGES - COMMENTS Neighbour Response · 06 Aug 2025
  • GULLING GREEN - COMMENTS Neighbour Response · 06 Aug 2025
  • FLINT HOUSE - COMMENTS Neighbour Response · 06 Aug 2025
  • 2 KEEBLE CLOSE - COMMENTS Neighbour Response · 05 Aug 2025
  • 1 PEACOCKS CLOSE - COMMENTS Neighbour Response · 05 Aug 2025
  • THE STUDIO, POOLE STREET - COMMENTS Neighbour Response · 05 Aug 2025
  • WILLOW HOUSE, PEACOCKS ROAD - COMMENTS Neighbour Response · 05 Aug 2025
  • 1 MANOR COTTAGES - COMMENTS Neighbour Response · 05 Aug 2025
  • CHOODLES - COMMENTS Neighbour Response · 04 Aug 2025
  • 20 PEACOCKS CLOSE - COMMENTS Neighbour Response · 04 Aug 2025
  • WAVER COTTAGE - COMMENTS Neighbour Response · 04 Aug 2025
  • DUCKS HALL, DUCKS HALL LANE - COMMENTS Neighbour Response · 04 Aug 2025
  • CHURCH FARM, PEACOCKS ROAD - COMMENTS Neighbour Response · 04 Aug 2025
  • HTTC LTD ON BEHALF OF WALES END SOLAR FARM GROUP - COMMENTS Neighbour Response · 04 Aug 2025
  • NETHERDENE - COMMENTS Neighbour Response · 03 Aug 2025
  • MULBERRY COTTAGE - COMMENTS Neighbour Response · 01 Aug 2025
  • 2 PEACOCKS CLOSE - COMMENTS Neighbour Response · 01 Aug 2025
  • 13 PEACOCKS ROAD - COMMENTS Neighbour Response · 01 Aug 2025
  • THE BLACK HOUSE, FENSTEAD END - COMMENTS Neighbour Response · 31 Jul 2025
  • 49 PEACOCKS CLOSE - COMMENTS Neighbour Response · 31 Jul 2025
  • PAROCHIAL CHURCH COUNCIL (PCC) OF ST MARY'S CHURCH - COMMENTS Neighbour Response · 31 Jul 2025
  • FORESTRY COMMISSION Consultation Response · 30 Jul 2025
  • THE BLACK HOUSE - COMMENTS Neighbour Response · 30 Jul 2025
  • 12 PEACOCKS CLOSE - COMMENTS Neighbour Response · 29 Jul 2025
  • 3 PEACOCKS LEY - COMMENTS Neighbour Response · 29 Jul 2025
  • THE BLACK HOUSE - COMMENTS Neighbour Response · 29 Jul 2025
  • NATURAL ENGLAND Consultation Response · 29 Jul 2025
  • THREE CHIMNEYS - COMMENTS Neighbour Response · 28 Jul 2025
  • ROBBS FARM BARN - COMMENTS Neighbour Response · 28 Jul 2025
  • ROSE COTTAGE, PLUM STREET - COMMENTS Neighbour Response · 28 Jul 2025
  • ROBBS FARM - COMMENTS Neighbour Response · 28 Jul 2025
  • WALES END FARM - COMMENTS Neighbour Response · 27 Jul 2025
  • SCOTT'S HILL - COMMENTS Neighbour Response · 25 Jul 2025
  • CAVENDISH MILL - COMMENTS Neighbour Response · 24 Jul 2025
  • WASTE MANAGEMENT Consultee Comment · 24 Jul 2025
  • 6 PEACOCKS CLOSE - COMMENT Neighbour Response · 24 Jul 2025
  • MOORS FARM - COMMENT Neighbour Response · 24 Jul 2025
  • ROSE COTTAGE - COMMENTS Neighbour Response · 23 Jul 2025
  • ARBORICULTURAL OFFICER Consultee Comment · 22 Jul 2025
  • ENVIRONMENT TEAM Consultee Comment · 22 Jul 2025
  • CAMBRIDGE CITY AIRPORT Consultation Response · 21 Jul 2025
  • ACTIVE TRAVEL ENGLAND Consultation Response · 21 Jul 2025
  • ENVIRONMENT TEAM - SUSTAINABILITY Consultee Comment · 18 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 1 Site and Other Plans/Drawings · 14 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 2 Site and Other Plans/Drawings · 14 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 3 Site and Other Plans/Drawings · 14 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 4 Site and Other Plans/Drawings · 14 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 5 Site and Other Plans/Drawings · 14 Jul 2025
  • TOPOGRAPHICAL SURVEY PART 6 Site and Other Plans/Drawings · 14 Jul 2025
  • SUPERSEDED PROPOSED LAYOUT Site and Other Plans/Drawings · 07 Jul 2025
  • SURVEY FOR CONTEXT Site and Other Plans/Drawings · 02 Jul 2025
  • BNG METRIC Supporting Documents · 02 Jul 2025
  • SURVEY FOR CONTEXT Site and Other Plans/Drawings · 02 Jul 2025
  • SUPERSEDED APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 26 Jun 2025
  • NOISE IMPACT ASSESSMENT Supporting Documents · 26 Jun 2025
  • SUPERCEDED TREE SURVEY Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERCEDED TREE SURVEY Supporting Documents · 26 Jun 2025
  • SUPERSEDED LANDSCAPE STRATEGY Supporting Documents · 26 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT Supporting Documents · 26 Jun 2025
  • PROPOSED ELEVATION 01 - PV TABLE Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATION - BESS CONTAINER Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATION - TRANSFORMER AND LOW VOLTAGE STATION Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATION - BATTERY INVERTER STATION ELEVATION Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERSEDED PROPOSED ELEVATION - 33KV SUBSTATION Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERSEDED PROPOSED ELEVATION - 33KV SUBSTATION SHEET 2 OF 2 Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERSEDED PROPOSED ELEVATION - 33KV DNO SUBSTATION Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERSEDED PROPOSED ELEVATION - CCTV AND LIGHTING Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATIONS - BOUNDARY TREATMENTS Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATIONS - STORAGE CONTAINER Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATIONS - OFFICE AND WELFARE FACILITIES Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED SECTION - ACCESS TRACK Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATION - WATER TANK Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED SECTION - CABLE CROSS SECTION Site and Other Plans/Drawings · 26 Jun 2025
  • PROPOSED ELEVATION - WEATHER STATION Site and Other Plans/Drawings · 26 Jun 2025
  • SUPERSEDED FIRE STRATEGY PLAN Site and Other Plans/Drawings · 26 Jun 2025
  • LOCATION PLAN Site and Other Plans/Drawings · 26 Jun 2025
  • CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Documents · 26 Jun 2025
  • DESIGN, ACCESSIBILITY AND PLANNING APPRAISAL Supporting Documents · 26 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT - APPENDICES Supporting Documents · 26 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT - APPENDICES PART 2 Supporting Documents · 26 Jun 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Supporting Documents · 26 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT - APPENDICES FIGURE 1 Supporting Documents · 26 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT - APPENDICES FIGURE 2 Supporting Documents · 26 Jun 2025
  • TECHNICAL INFORMATION Supporting Documents · 26 Jun 2025
  • TECHNICAL INFORMATION Supporting Documents · 26 Jun 2025
  • TECHNICAL INFORMATION Supporting Documents · 26 Jun 2025
  • TECHNICAL INFORMATION Supporting Documents · 26 Jun 2025
  • SOLAR MODULE GLARE AND REFLECTANCE - TECHNICAL NOTE Supporting Documents · 26 Jun 2025
  • OUTLINE BATTERY SAFETY MANAGEMENT PLAN Supporting Documents · 26 Jun 2025
  • BIODIVERSITY CHECKLIST Supporting Documents · 26 Jun 2025
  • AGRICULTURAL LAND CLASSIFICATION Supporting Documents · 26 Jun 2025
  • LAND CONTAMINATION ASSESSMENT Supporting Documents · 26 Jun 2025
  • SUPERSED PRELIMINARY ECOLOGICAL APPRAISAL Supporting Documents · 26 Jun 2025
  • GLINT AND GLARE ASSESSMENT Supporting Documents · 26 Jun 2025
  • FLOOD RISK ASSESSMENT AND SURFACE WATER DRAINAGE STRATEGY Supporting Documents · 26 Jun 2025
  • PREAPP INFORMATION Supporting Documents · 26 Jun 2025
  • HISTORIC ENVIRONMENT DESK BASED ASSESSMENT Supporting Documents · 26 Jun 2025
  • ALTERNATIVE SITES ASSESSMENT Supporting Documents · 26 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with West Suffolk for determination, against a statutory target of eight weeks. Over the last year West Suffolk decided full applications in a median of 90 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In West Suffolk

  • DC/26/1592/FUL Awaiting decision

    The Coal Yard Wilde Street Beck Row Suffolk IP28 8BL

    Planning application - access and parking for plots 1 and 2

    Received 19 Oct, published by the council 23 Oct 2026 Full applications
  • DC/26/1576/FUL Awaiting decision

    Network House Western Way Bury St Edmunds Suffolk IP33 3SP

    Planning application - installation of three extraction systems and associated external flues

    Received 16 Oct, published by the council 22 Oct 2026 Full applications
  • DC/26/1563/FUL Awaiting decision

    Langham Business Park Thingoe Hill Bury St Edmunds Suffolk IP32 6BE

    Planning application - a. retention and change of use of existing industrial building to dog-care, grooming and vocational education facility (sui generis) b. single storey micro-business units (use class E(g)) c. designation of yard for open-air commercial storage (use class B8) with associated access, parking and landscaping

    Received 14 Oct, published by the council 21 Oct 2026 Full applications
  • DC/26/1558/FUL Awaiting decision

    All Saints Hotel The Street Fornham St Genevieve Suffolk IP28 6JQ

    Planning application - overspill car park with associated soft landscaping and tree screening

    Received 13 Oct, published by the council 20 Oct 2026 Full applications
  • DC/26/1547/FUL Awaiting decision

    22 Auction Street Bury St Edmunds Suffolk IP33 3FA

    Planning application - a. installation of delivery hatch and front door b. outdoor seating and planters c. menu box on front elevation d. festoon lighting

    Received 9 Oct, published by the council 22 Oct 2026 Full applications