Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00998/NONMAT

Sandleford Park East Newtown Road Newtown Newbury

Awaiting decision West Berkshire Non-Material Amendment

Proposal

Application for a Non-Material Amendment following the grant of Outline Planning Permission 20/01238/OUTMAJ allowed on Appeal on the 6th of May 2022. Amendments to Description of Development, to approved parameter plans and to the wording of Conditions 2, 5, and 48 in order to remove reference to Park House School Expansion Land; and removal of conditions 9,10, and 28 which relate to Park House School Expansion Land. The amended description of the development shall read: (20/01238/OUTMAJ) " Outline planning permission (with all matters reserved except for access) for up to 1,000 new homes; an 80 extra care housing units (Use Class C3) as part of the affordable housing provision; a new 2 form entry primary school (D1); a local centre to comprise flexible commercial floorspace (A1-A5 up to 2,150 sq m, B1a up to 200 sq m) and D1 use (up to 500sq m); the formation of new means of access onto Monks Lane; new open space including the laying out of a new country park; drainage infrastructure; walking and cycling infrastructure and other associated infrastructure works.

As published by the council, reference 26/00998/NONMAT

Timeline

Dates from the published record

  1. 7 May 2026

    Received by West Berkshire

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with West Berkshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

In West Berkshire

  • 26/01639/NONMAT Awaiting decision

    Hill Farm Boames Lane Enborne Newbury RG20 0JT

    Application for a Non-Material Amendment Following a Grant of Planning Permission 23/01190/FUL. Amendments: Conversion of three former agricultural barns to three residential units with associated access, parking landscaping and ancillary works, to be carried out in phases.

    27 Jul 2026 Amendments
  • 26/01641/NONMAT Awaiting decision

    Barn At Beedon Manor Farm Beedon Newbury RG20 8SW

    Application for a Non-Material Amendment Following a Grant of Planning Permission 22/02047/FULD (appeal ref: 3319969): Demolition of the existing large agricultural buildings and replacement with new residential dwellings, together with access, parking, landscaping and any other associated infrastructure. Amendment: to increase the size of two windows on the east elevation of Unit H2.

    27 Jul 2026 Amendments
  • 26/01606/NONMAT Awaiting decision

    North Lakeside The Green Theale Reading

    Application for a Non-Material Amendment Following a Grant of Planning Permission 24/00416/FUL. Amendments: Vary the timing requirement stated in Condition 3 to enable the construction access to be stopped up by 31st May 2029.

    22 Jul 2026 Amendments
  • 26/01307/ELEC8 Granted

    Snelsmore Water Tower Snelsmore Common Newbury

    Section 37 of the Electricity Act 1989 to install or keep installed an electric line above ground. Replacement of existing 100Kva split phase transformer with 100Kva three-phase transformer. Add lame leg to Pole. To upgrade 1 span of 50 ABC TO 95 ABC.

    16 Jun 2026 Amendments
  • 26/01361/NONMAT Granted

    Feathers Farm Blandys Lane Upper Basildon Reading RG8 8PG

    Application for a Non-Material Amendment Following a Grant of Planning Permission 26/00504/FUL. Amendments: The front extension under the canopy is to increase. Roof windows removed and fenestration arrangement revised to the rear elevation

    23 Jun 2026 Amendments