Planning application
2025/4019
Battersea Power Station Kirtling Street SW8 5BX
Proposal
Retention of decking, balustrade, two bridges, lighting and other associated fixed items, and use of the jetty as flexible class E(a), F1, F2, drinking establishment, hot-food takeaway and cinema (sui generis) uses for a temporary period of two years. (See related listed building consent application ref. 2025/4021.)
As published by the council, reference 2025/4019
Timeline
Dates from the published record
-
6 Nov 2025
Received by Wandsworth
-
29 Jun 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Wandsworth is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
2026/0707 Granted
Battersea Power Station and nearby land including the former South Lambeth Goods Yard; the former Battersea Water Pumping Station; the site of the former Spicer-Cowan warehouse and former Dalkia boiler house; 28, 88 and 188 Kirtling Street; 2 Battersea Park Road; and parts of Battersea Park Road, Cringle Street and Kirtling Street, Queenstown Road and Queens Circus, SW8
Submission of details of the interface between Phase 3C and the Northern Line Extension pursuant to condition 66 (NLE interface) of planning permission 2021/0414 dated 28/02/2022 in relation to Phase 3C of the Battersea Power Station development site only.
-
2025/3240 Awaiting decision
Battersea Power Station Phase 3C SW8 5BN
Submission of details pursuant to condition 53 (drainage maintenance regime) and parts B and C of condition 81 (air quality assessment) for Phase 3C only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
-
2025/4660 Awaiting decision
1st Floor Turbine Hall A Battersea Power Station
Application for advertisement consent for the retention of an illuminated sign at level 1 of Turbine Hall A measuring 2.40m by 2.20m and the relocation of an existing wall mounted LED screen measuring 0.50m by 1.00m.
-
2025/4473 Awaiting decision
Battersea Power Station and nearby land including the former South Lambeth Goods Yard; the former Battersea Water Pumping Station; the site of the former Spicer-Cowan warehouse and former Dalkia boiler house; 28, 88 and 188 Kirtling Street; 2 Battersea Park Road; and parts of Battersea Park Road, Cringle Street and Kirtling Street, Queenstown Road and Queens Circus, SW8
Submission of details pursuant to conditions 6 (landscaping), 15 (distribution and configuration of residential units), 18 (phasing), 25 (non-car parking and service areas), 26 (access and servicing for commercial units), 35 (sustainability and energy strategy), 36 (sustainable waste strategy), 41 (scheme to protect residential accommodation from external noise sources), 44 (ecological mitigation measures), 46 part A (supplementary flood risk assessment), 48 (flood defences), 49 (surface water drainage scheme), 60 (safeguarded wharves mitigation), 80 (urban greening factor), 81 (air quality assessment), 82 (wind analysis), 83 (light pollution and solar glare assessment), 84 (fire statement), 85 (cycle parking), 86 (daylight and sunlight assessment) and 87 (flood resilience/resistance measures) of planning permission 2021/0414 dated 28/02/2022 in relation to Phase 5A of the Battersea Power Station development site only.
-
2025/4459 Awaiting decision
Battersea Power Station, Cringle Street, London, SW8
Erection of structures, freestanding furniture and an illuminated sign within Turbine Hall A of Battersea Power Station. (The proposed structures are associated with the 'Chimney Lift Experience' on level 1 of Turbine Hall A.) (Listed building consent application).
-
2025/4021 Awaiting decision
Battersea Power Station Kirtling Street SW8 5BX
Listed building consent application for the retention of decking, balustrades, two bridges, lighting and other associated fixed items for a period of two years.(See related planning application ref. 2025/4019.)