Planning application
BPS Kirtling Street Phase 5A SW8 5BN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of details pursuant to Condition 45 (archaeological investigation) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
As published by the council, reference 2026/3169
Application record
- Reference
- 2026/3169
- Status
- REGISTERED
- Received
- 7 Sep 2026
- Postcode
- SW8 5BN
Timeline
Dates from the published record
-
7 Sep 2026
Received by Wandsworth
-
7 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wandsworth took a median of 60 days over the applications it decided in the last year.
What happens while it is decided
This application is with Wandsworth for determination, against a statutory target of eight weeks. Over the last year Wandsworth's median decision took 60 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Wandsworth's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Battersea Power Station Phase 3b Kirtling Street SW8 5BN
89% historically approved · decision due ~21 Oct
Application under Section 96A of the Town and Country Planning Act 1990 for 'non-material' amendments to conditions 8 (floorspace restrictions), 10 (distribution of uses) and 11 (maximum floorspace per development zone) of planning permission 2020/0579 dated 05/09/2020. The amendments relate to the change of use of unit UG-14 within Phase 3B of the development from retail / professional and financial services (class A1/A2) to food and beverage (class A3/A4/A5).
Awaiting decision -
Battersea Power Station development site Phase 5A SW8 5BN
89% historically approved · decision due ~30 Oct
Submission of details pursuant to Condition 81 Part C (air quality assessment) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
Awaiting decision -
Battersea Power Station development site Phase 5A SW8 5BN
89% historically approved · decision due ~30 Oct
Submission of details pursuant to Condition 53 (drainage maintenance regime) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.
Awaiting decision -
Battersea Power Station Kirtling Street London SW8 5BN
89% historically approved · decision due ~28 Jun
2022/1168 - Submission of landscape details pursuant to Condition 19 for Phase 3B only of planning permission 2020/0579 dated 25/09/2020 for "Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." 2020/0579 - Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bar
Awaiting decision Reserved matters New dwelling Extension +1 -
Battersea Power Station Kirtling Street SW8 5BX
89% historically approved · decision due ~24 Aug
Retention of decking, balustrade, two bridges, lighting and other associated fixed items, and use of the jetty as flexible class E(a), F1, F2, drinking establishment, hot-food takeaway and cinema (sui generis) uses for a temporary period of two years. (See related listed building consent application ref. 2025/4021.)
Awaiting decision -
Battersea Power Station Kirtling Street SW8 5BX
89% historically approved · decision due ~24 Aug
Listed building consent application for the retention of decking, balustrades, two bridges, lighting and other associated fixed items for a period of two years.(See related planning application ref. 2025/4019.)
Awaiting decision