Details CEMP, landscape scheme, LEMP, site access, tree pruning, location storage materials and BREEAM pursuant to condition 4, 5, 6, 7 and 11 Part A of planning permission dated 20/09/2023 ref 2023/2496 (Demolition of existing entrance/toilet/shower buildings and construction of new entrance building at the north end of the pool, comprising reception, toilets, cafe and external secure bicycle parking. Construction of new facilities on either side of existing cafe building and construction of new facilities on the eastern boundary of the site to match existing cubicles. Works to trees.)
As published by the council, reference 2024/4439
Application record
- Reference
- 2024/4439
- Type
- Details (following full perm.)
- Status
- Pending As published: REGISTERED
- Received
- 19 Dec 2024
- Validated
- 2 Jan 2025
- Ward
- South Balham
- Postcode
- SW16 1RU
Site history
Applications at this address on the Wandsworth register
This site has had 3 applications since 2024: 2 approved, 0 refused.
-
2026/2983 Granted
Tooting Bec Lido Tooting Bec Road SW16 1RU
Details of Construction Management Plan (Phase 1) pursuant to condition 9 of planning permission dated 20/09/2023 ref. 2023/2496 (as varied by NMA 2026/2498) (Demolition of existing entrance/toilet/shower buildings and construction of new entrance building at the north end of the pool, comprising reception, toilets, cafe and external secure bicycle parking. Construction of new facilities on either side of existing cafe building and construction of new facilities on the eastern boundary of the site to match existing cubicles. Works to trees.).
-
2026/2498 Granted
Tooting Bec Lido Tooting Bec Road SW16 1RU
Non-material amendment to planning permission dated 20/09/2023 ref 2023/2496 (Demolition of existing entrance/toilet/shower buildings and construction of new entrance building at the north end of the pool, comprising reception, toilets, cafe and external secure bicycle parking. Construction of new facilities on either side of existing cafe building and construction of new facilities on the eastern boundary of the site to match existing cubicles. Works to trees.) to allow amendments to Condition 9 and addition of condition 12 to read: 9. No development of Phase 1, Phase 2 or Phase 3, including any demolition, shall take place until a construction management plan for the relevant phase has been submitted to and approved in writing by the local planning authority. The construction management plan for each phase shall include details (but not limited to) of the routing of construction vehicles, time of arrival and departure, and any proposed temporary traffic and pedestrian management measures during the course of construction. The demolition and construction works shall be carried out in accordance with the approved plan. 12. The development hereby approved shall be carried out in accordance with phasing plan WRAP-DRG-A-A0160 Rev P02.
Timeline
Dates from the published record
-
19 Dec 2024
Received by Wandsworth
-
2 Jan 2025
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 February 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wandsworth took a median of 59 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Wandsworth for determination, against a statutory target of eight weeks. Over the last year Wandsworth decided full applications in a median of 71 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Tooting Bec Lido Tooting Bec Road SW16 1RU
Details of Construction Management Plan (Phase 1) pursuant to condition 9 of planning permission dated 20/09/2023 ref. 2023/2496 (as varied by NMA 2026/2498) (Demolition of existing entrance/toilet/shower buildings and construction of new entrance building at the north end of the pool, comprising reception, toilets, cafe and external secure bicycle parking. Construction of new facilities on either side of existing cafe building and construction of new facilities on the eastern boundary of the site to match existing cubicles. Works to trees.).
Granted Demolition Trees -
Tooting Bec Lido Tooting Bec Road SW16 1RU
Non-material amendment to planning permission dated 20/09/2023 ref 2023/2496 (Demolition of existing entrance/toilet/shower buildings and construction of new entrance building at the north end of the pool, comprising reception, toilets, cafe and external secure bicycle parking. Construction of new facilities on either side of existing cafe building and construction of new facilities on the eastern boundary of the site to match existing cubicles. Works to trees.) to allow amendments to Condition 9 and addition of condition 12 to read: 9. No development of Phase 1, Phase 2 or Phase 3, including any demolition, shall take place until a construction management plan for the relevant phase has been submitted to and approved in writing by the local planning authority. The construction management plan for each phase shall include details (but not limited to) of the routing of construction vehicles, time of arrival and departure, and any proposed temporary traffic and pedestrian management measures during the course of construction. The demolition and construction works shall be carried out in accordance with the approved plan. 12. The development hereby approved shall be carried out in accordance with phasing plan WRAP-DRG-A-A0160 Rev P02.
Granted Demolition Trees -
Tooting Common Tooting Bec Road London SW16 1RU
79% historically approved · decision due ~13 Oct
This application seeks consent for the continued display of temporary advertisements and signage associated with events, activities and facilities within Tooting Common for the period 1 July 2026 to 30 June 2031. The proposed advertisements comprise a range of temporary banners, signs, flags, A-boards, freestanding display units and event branding associated with community events, cultural activities, sporting events, markets, recreational programmes and park facilities. The advertisements will primarily provide event information, wayfinding, operational guidance and promotional material relating to activities taking place within Wandsworth Park. Signage will be located at established advertising positions throughout the park, including entrance gates, event sites, sports facilities, concession areas and other designated event locations. Advertisements will vary in size, design and material depending on the specific event or activity but will remain temporary in nature and displayed only for the period necessary to support individual events and park operations. The application includes advertising associated with: Event and activity banners Directional and wayfinding signage Sports, recreation and facility signage Temporary event branding Community event and market signage Freestanding display units and flags Illuminated and non-illuminated signage where appropriate All advertisements will be displayed in accordance with the Agreement for the Hire of Wandsworth Park and in line with the supporting plans and appendices submitted as part of this application. I would use essentially this wording for all of the remaining parks, simply changing the park-specific references and tweaking the activities slightly: Tooting Common ??? add festivals, Country on the Common, sporting events, community activities. Wandsworth Common ??? community events, sporting activities, fairs, outdoor recreation. King George's Park ??? sports tournaments, community events, funfairs (where appl
Awaiting decision Advertising -
Telecommunication Mast and Cabinet CTIL144615 VF37219 on Pavement East of Railway Bridge Street Furniture Bedford Hill
Notification of intention to remove and replace the existing 12.5m streetpole with a new 20m streetpole supporting 12no. antennas, installation of 6no. equipment cabinets and 1no. electrical meter cabinet and ancillary works thereto.
Granted Telecoms 7 docs -
Telecommunication Mast and Cabinet CTIL144615 VF37219 on Pavement East of Railway Bridge Street Furniture Bedford Hill
Notification of intention to remove and replace the existing 12.5m streetpole with a new 20m streetpole supporting 12no. antennas, installation of 6no. equipment cabinets and 1no. electrical meter cabinet and ancillary works thereto.
Granted Telecoms 6 docs -
Tooting Bec Common Open Spaces Tooting Bec Road London
Details of construction management condition 3 planning permission dated 11/11/2025 ref 2025/1580 (Refubishment of playground and railings around tennis court ticket hut.).
Granted Full applications 15 docs
Other full applications
In Wandsworth
-
2026/3254 Awaiting decision
99 Falcon Road London Wandsworth SW11 2PF
Erection of a mansard roof extension, demolition of the existing rear extension and erection of a replacement two-storey rear extension, together with the conversion of the property into 2 self contained flats from an existing shop and flat
-
2025/3775 Granted
Block C Peabody Estate Flat 1 St Johns Hill SW11 1UA
Details of "Be Seen" pursuant to Section 106 Schedule 10 part 1.1 of planning permission dated 03/11/2022 ref 2021/5678 for Block 03C only (Variation of Condition 15 (in accordance with approved drawings), Condition 24 (lifetime homes standards), Condition 25 (Code for Sustainable Homes Interim (Design Stage) Certificate), Condition 28 (Energy Performance Certificate), Condition 32 (secure cycle parking spaces), Condition 41 (building heights), Condition 42 (non residential floorspace) and Condition 43 (residential units) pursuant to planning permission dated 19/01/2019 ref 2017/5837 to allow: Changes to internal residential layouts resulting in an amended residential unit mix (including an increase of up to 59 residential units); minor adjustments to the massing, building footprint and height of Plots 3 and 7 (Phase 3) and associated changes to the external building facade of Plots 3, 7and 8 (Phase 3); reconfiguration of commercial floorspace; alterations to play space and landscape design, servicing arrangements, cycle parking and provision of plant.)
-
2025/3673 Granted
Riverside Business Centre 168 Haldane Place SW18 4UQ
Details of Phase I Geoenvironmental & Geotechnical Assessment. Preliminary Phase II Site Investigation Report, Ground Gas Risk Assessment, Supplementary Site Investigation Report, Phase III Site Investigation Report, Works Information Document and Updated Remediation Method Statement [FOR BLOCK G ONLY] pursuant to condition 49 of planning permission dated 17/12/2024 ref. 2023/3661 (Variation of Conditions 3 (in accordance with approved drawings), 4 (Environmental Impact Assessment), 34 (Energy Strategy), 42 (Flood Risk Assessment), 47 (Ultra-Low NOX Gas fired boilers) pursuant to planning permission ref. 2021/3601 dated 13 September 2022 (Demolition of existing buildings and erection of 5 buildings ranging from ground plus 4 (with double-height ground floor) to ground plus 8 storeys with basement to provide 21,403sqm flexible light industrial, storage and distribution floorspace (Class B1, B1c and B8), 678sqm flexible non-residential institutions and assembly and leisure space use (Class D1/D2), 402 residential units (Class C3), two new streets linking Haldane Place and Bendon Valley, car and cycle parking and associated public realm enhancements comprising detailed landscaping, communal amenity space and a new Wandle Riverside Walk) Amendments to the Courtyard Buildings (Blocks B, C, D, E, F) comprising the relocation of principal accesses, raising of central courtyard Finish Floor Levels, removal of ramps/balustrades at ground floor level, omission of basements to Block B, D and E-F, removal of 7-storey glass atrium and internal bridge links joining Blocks B-C and E-F, amendments to Blocks D and E. Amendments to the Riverside Buildings (Blocks G, H, I) comprising the relocation of principal accesses, amendments to Block H basement, amendments to roof gardens and addition of commercial bin store.).
-
2026/3253 Awaiting decision
124 Sarsfeld Road London Wandsworth SW12 8HL
Two storey rear extension, loft conversion and associated alterations.
-
2026/1296 Granted
330-390 Southcroft Road SW16 6QU
Formation of hard and soft landscaping to create 29no. car parking spaces, 6no. motorcycle parking spaces, 66no. cycle parking spaces and 2no bin stores.