Awaiting decision Wandsworth 2023/2055 Reserved Matters (following outline)

Works: New dwelling Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

2014/2837 Application for Amendments to the planning permission dated the 29/04/14 (ref: 2013/6639) for the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, student housing, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping. (The Amendments include the changing of Development Zones O1 & RS4 from outline to detailed elements of the outline planning permission; the submission of detailed designs for O1 & RS4, Town Square, High Street and Prospect; deletion of parameter plans, Architectural Code and Placemaking Code for O1 & RS4; changes to the massing, height, disposition, land use and residential mix of O1 & RS4; provision of additional retail car parking through creation of two additional levels of basement parking beneath O1 & RS4; relocating gym from the first floor of the Power Station to lower ground floor in RS4; introducing an element of affordable housing into O1; relocation of D1 community facility to the Prospect; deletion of student housing from the proposed land uses, and other consequential changes). (The application is accompanied by an Addendum to the Environmental Statement). - REVISED PROPOSAL: SEE COVERING LETTER DATED 28 JULY 2014. 2021/5039 Submission of details pursuant to condition 27 (occupation of A1/A2 areas) and 28 (retail unit size) in relation to Phase 3A of planning permissi

As published by the council, reference 2023/2055

Application record

Reference
2023/2055
Type
Reserved Matters (following outline)
Status
On-line
Received
31 May 2023
Validated
31 May 2023
Postcode
SW8 5BN

Site history

Applications at this address on the Wandsworth register

This site has had 2 applications since 2023.

  • 2023/1714 Awaiting decision

    Battersea Power Station Kirtling Street London SW8 5BN

    2022/1168 - Submission of landscape details pursuant to Condition 19 for Phase 3B only of planning permission 2020/0579 dated 25/09/2020 for "Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." 2020/0579 - Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bar

    Submitted 3 May 2023 Reserved matters

Timeline

Dates from the published record

  1. 31 May 2023

    Received by Wandsworth

  2. 21 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 26 July 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wandsworth took a median of 59 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Wandsworth for determination, against a statutory target of eight weeks. Over the last year Wandsworth's median decision took 59 days. More in our guide to how long planning decisions take.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Battersea Power Station Kirtling Street London SW8 5BN

    2023/1714 Submitted 3 May 2023 50 yards away

    89% historically approved · decision due ~28 Jun

    2022/1168 - Submission of landscape details pursuant to Condition 19 for Phase 3B only of planning permission 2020/0579 dated 25/09/2020 for "Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." 2020/0579 - Application under Section 73 of the Town and Country Planning Act 1990 for variations to Conditions 7 (Parameter Plans), 8 (Floorspace Areas), 10 (Distribution of Use Classes), 11 (Maximum Floorspace Areas), 13 (No. of Residential Units) and 61 (Approved Drawings) of the outline planning permission dated 8th November 2016 (ref: 2016/1119) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bar

    Awaiting decision Reserved matters New dwelling Extension +1
  • BPS Kirtling Street Phase 5A SW8 5BN

    2026/3169 Submitted 7 Sep 2026 50 yards away

    89% historically approved · decision due ~2 Nov

    Submission of details pursuant to Condition 45 (archaeological investigation) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.

    Awaiting decision
  • Battersea Power Station Phase 3b Kirtling Street SW8 5BN

    2026/2944 Submitted 26 Aug 2026 50 yards away

    89% historically approved · decision due ~21 Oct

    Application under Section 96A of the Town and Country Planning Act 1990 for 'non-material' amendments to conditions 8 (floorspace restrictions), 10 (distribution of uses) and 11 (maximum floorspace per development zone) of planning permission 2020/0579 dated 05/09/2020. The amendments relate to the change of use of unit UG-14 within Phase 3B of the development from retail / professional and financial services (class A1/A2) to food and beverage (class A3/A4/A5).

    Awaiting decision
  • Phase 5A Battersea Power Station SW8 5BN

    2026/3200 Submitted 9 Sep 2026 50 yards away

    89% historically approved · decision due ~4 Nov

    Submission of details pursuant to Condition 43 (ground investigations) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.

    Awaiting decision
  • BPS Kirtling Street Phase 5A SW8 5BN

    2026/3170 Submitted 9 Sep 2026 50 yards away

    89% historically approved · decision due ~4 Nov

    Submission of details pursuant to Condition 22 (Car Parking Management Strategy) and Condition 59 (Servicing Management Strategy) for Phase 5A only of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power Station masterplan.

    Awaiting decision
  • Battersea Power Station development site Phase 5A SW8 5BN

    2026/3211 Submitted 10 Sep 2026 50 yards away

    89% historically approved · decision due ~3 Nov

    Submission of details pursuant to condition 2 (Dust Management Plan (DMP)) and condition 3 (Construction Environmental Management Plan (CEMP)) for Phase 5A of the Battersea Power Station development, as approved under application ref. 2026/0169 dated 27/08/2026 pursuant to condition 3 (reserved matters) of planning permission 2021/0414 dated 28/02/2022.

    Awaiting decision

In Wandsworth

  • 2026/3250 Awaiting decision

    Salvation Army Citadel 9 Ram Street SW18 1TJ

    Demolition of existing building and erection of a new six-storey building to provide flexible community/commercial use (Class F.2/E) on part of the ground floor with the remainder of the ground floor and the upper floors providing a 50-bedroom hotel use (Class C1) with associated entrance/lobby, plant, refuse storage, cycle storage and landscaping.

    Received 10 Sep, published by the council 21 Sep 2026 Reserved matters
  • 2026/3226 Withdrawn

    94A Mitcham Lane SW16 6NR

    Determination as to whether prior notification is required for change of use from retail (Class E) to 1 x 1-bedroom and 1 x studio flats (Class C3)

    Received 9 Sep, published by the council 10 Sep 2026 Reserved matters
  • 2026/3227 Withdrawn

    96 Mitcham Lane SW16 6NR

    Details of cycle parking details and external noise pursuant to conditions 1 & 2 of prior approval dated 07/02/2024 ref 2023/4669 (Determination as to whether prior notification is required for change of use from retail (Class E) to 1 x 1-bedroom and 1 x studio flats C3.)

    Received 9 Sep, published by the council 10 Sep 2026 Reserved matters
  • 2026/0169 Granted

    Battersea Power Station and nearby land including the former South Lambeth Goods Yard; the former Battersea Water Pumping Station; the site of the former Spicer-Cowan warehouse and former Dalkia boiler house; 28, 88 and 188 Kirtling Street; 2 Battersea Park Road; and parts of Battersea Park, Road Cringle Street and Kirtling Street, Queenstown Road and Queens Circus SW8

    Details of reserved matters (scale, external appearance, landscaping, layout of buildings and distribution of land uses) in respect of Phase 5A (Development Zone RS-6A), pursuant to condition 3 of planning permission 2021/0414 dated 28/02/2022 for the Battersea Power station development for the restoration, extension, alterations and conversion of the Power Station building and demolition of other buildings and development of the land surrounding the Power Station to provide a mix of uses, open space and landscaping works.

    Received 14 Jan, published by the council 29 Jul 2026 Reserved matters
  • 2026/1344 Awaiting decision

    Woking Close Family Centre 140 Woking Close London Wandsworth SW15 5LD

    SCHEDULE APPLICATION NUMBER: 2025/2356 LOCATION: DESCRIPTION: DRAWING NOS: Woking Close Family Centre, 140 Woking Close, SW15 5LD Variation of condition 2 (in accordance with approved drawings), 3 (cycle parking) and 4 (travel plan) pursuant to planning permission dated 09/12/2022 ref 2022/3705 (Use of ground and first floors as an educational facility (Class F1) with associated car and cycle parking.) to allow an increase in the number of students in the educational facility from 24 to 32 with an associated increase in staff. CH016-1F-DWG-101 Rev C; CH016-1F-DWG-100 Rev C; TQRQM22248155258990 The development hereby permitted shall be begun within 3 years or 09/12/2022 Reason: To prevent the accumulation of unimplemented planning permissions 1/4??? 2025/2356 Director of Place: Paul Moore Official and to comply with Section 91 of the Town and Country Planning Act 1990 (as amended) and to meet the requirements of Section 51 of the Planning and Compulsory Purchase Act 2004 and to meet the requirements of The Town and Country Planning (Development Management Procedure) (England) Order 2015. Revised Condition: The development shall be carried out in accordance with the reports, specifications and drawings detailed CH016-1F-DWG-101 Rev C; CH016-1F-DWG-100 Rev C; TQRQM22248155258990 Reason: To ensure a satisfactory standard of development and to allow the local planning authority to review any potential changes to the scheme. Within six months of commencement of the use hereby approved, details of the location, number and design of secure and covered cycle parking shall be submitted to and approved in writing by the local planning authority. The cycle parking shall be provided in accordance with the approved details prior to the occupation of the development and be retained for cycle parking purposes for the users of the development and for no other purpose. Reason: To ensure adequate provision is made for cycle parking in accordance with Council policies LP2, LP37, LP51, PM2, PM3, PM4, PM6, PM7, PM8 and PM9 of the Local Plan coupled with the requirements of the National Planning Policy Framework. (Note: Condition discharged under application ref. 2023/2265) Revised Condition: Within six months of commencement of the use hereby approved, a revised school travel plan in accordance with Transport for London's STARS programme shall be submitted to and approved in writing by the local planning authority, and thereafter annually updated and submitted to and approved in writing by the local planning authority. Reason: To encourage greater use of public transport, cycling and walking in accordance with Council policies LP49 and LP51 of the Local Plan (2023) (Note: the original condition 4 was discharged under application ref. 2023/2265 but the current S73 consent requires the submission of a revised and updated school travel plan).

    Received 8 Apr, published by the council 10 Aug 2026 Reserved matters