Skip to content
PlanIndex Get alerts
Menu

Planning application

Balsam House, 160 East India Dock Road, London, E14 0BP

Awaiting decision Tower Hamlets PA/26/01389/A1

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Redevelopment to provide a new building between 7 to 13 storeys high plus basement (to accommodat...

As published by the council, reference PA/26/01389/A1

Application record

Reference
PA/26/01389/A1
Status
Registered
Validated
22 Sep 2026
Ward
Poplar
Decision by
Delegated
Postcode
E14 0BP

Timeline

Dates from the published record

  1. 22 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  2. 28 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

MRPP Agent, registered in London

Active · incorporated 2026 · London

39 applications on PlanIndex · across 10 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Balsam House Ltd Applicant, registered in Ilford

Active · incorporated 2008 · Ilford

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

76 documents on file for this application

  • EA EXTERNAL CONSULTATION CHECKLIST FOR LPAS Correspondence · 23 Sep 2026
  • HEALTH IMPACT ASSESSMENT Report · 23 Sep 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 22 Sep 2026
  • PEDESTRIAN LEVEL WIND DESK- BASED ASSESSMENT Report · 22 Sep 2026
  • EXISTING ELEVATIONS Current Plan · 08 Sep 2026
  • EXISTING ROOF PLAN AND SITE SECTIONS Current Plan · 08 Sep 2026
  • LIGHTING ASSESSMENT AND STRATEGY Report · 08 Sep 2026
  • EAST AND WEST ELEVATIONS Current Plan · 11 Aug 2026
  • SOUTH ELEVATION - COTTAGE STREET Current Plan · 11 Aug 2026
  • NORTH ELEVATION - EAST INDIA DOCK ROAD Current Plan · 11 Aug 2026
  • PART 5 Design & Access Statement · 11 Aug 2026
  • PART 6 Design & Access Statement · 11 Aug 2026
  • PART 7 Design & Access Statement · 11 Aug 2026
  • WLC APPENDIX C Correspondence · 11 Aug 2026
  • REUSE AND RECYCLING OF WASTE PLAN Report · 07 Aug 2026
  • FINANCIAL VIABILITY ASSESSMENT REPORT Report · 07 Aug 2026
  • UTILITY POC AND CAPACITY REPORT Report · 07 Aug 2026
  • STUDENT RESIDENTIAL TRAVEL PLAN Report · 07 Aug 2026
  • PRELIMINARY RISK ASSESSMENT REPORT Report · 07 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Report · 07 Aug 2026
  • FLOOD RISK AND DRAINAGE STRATEGY REPORT Report · 07 Aug 2026
  • FIRE STATEMENT (ISSUE 01) Report · 07 Aug 2026
  • PART 1 Heritage Statement · 07 Aug 2026
  • PART 2 Heritage Statement · 07 Aug 2026
  • PART 3 Heritage Statement · 07 Aug 2026
  • ENERGY AND SUSTAINABILITY STATEMENT Report · 07 Aug 2026
  • APPENDIX A - FULL SAP CALCULATION PRINTOUT Correspondence · 07 Aug 2026
  • APPENDIX B - FULL SAP CALCULATION PRINTOUT Correspondence · 07 Aug 2026
  • APPENDIX C - FULL SAP CALCULATION PRINTOUT Correspondence · 07 Aug 2026
  • APPENDIX D - GLA CARBON EMISSION REPORTING SPREADSHEET Correspondence · 07 Aug 2026
  • OVERHEATING ASSESSMENT Report · 07 Aug 2026
  • BREEAM ACCREDITED PROFESSIONAL STAGE 2/3 SUSTAINABILITY REPORT Report · 07 Aug 2026
  • WHOLE LIFE CARBON AND CIRCULAR ECONOMY Report · 07 Aug 2026
  • WHOLE LIFE CARBON ANALYSIS Report · 07 Aug 2026
  • WLC APPENDIX B Correspondence · 07 Aug 2026
  • WLC APPENDIX E Correspondence · 07 Aug 2026
  • WLC APPENDIX F Correspondence · 07 Aug 2026
  • LIGHT WITHIN REPORT - PART 1 Report · 07 Aug 2026
  • LIGHT WITHIN REPORT - PART 2 Report · 07 Aug 2026
  • PART 1 Design & Access Statement · 07 Aug 2026
  • PART 2 Design & Access Statement · 07 Aug 2026
  • PART 3 Design & Access Statement · 07 Aug 2026
  • PART 4 Design & Access Statement · 07 Aug 2026
  • PART 8 Design & Access Statement · 07 Aug 2026
  • PART 9 Design & Access Statement · 07 Aug 2026
  • PART 10 Design & Access Statement · 07 Aug 2026
  • PART 11 Design & Access Statement · 07 Aug 2026
  • PART 12 Design & Access Statement · 07 Aug 2026
  • SITE LOCATION PLAN Current Plan · 07 Aug 2026
  • SITE LOCATION PLAN WITH PROPOSED GROUND FLOOR Current Plan · 07 Aug 2026
  • EXISTING PLANS - GROUND AND FIRST Current Plan · 07 Aug 2026
  • EXISTING PLANS - SECOND AND THIRD Current Plan · 07 Aug 2026
  • GROUND FLOOR LEVEL GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 01 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 02 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 03-06 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 07 GA PLAN Current Plan · 07 Aug 2026
  • LEVELS 08 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 09 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 10 GA PLAN Current Plan · 07 Aug 2026
  • LEVEL 11-12 GA PLAN Current Plan · 07 Aug 2026
  • BASEMENT LEVEL GA PLAN Current Plan · 07 Aug 2026
  • ROOF LEVEL GA PLAN Current Plan · 07 Aug 2026
  • SECTION AA Current Plan · 07 Aug 2026
  • SECTIONS BB AND CC Current Plan · 07 Aug 2026
  • CONTEXT SECTIONS N-S Current Plan · 07 Aug 2026
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Report · 07 Aug 2026
  • BIODIVERSITY NET GAIN ASSESSMENT REPORT Report · 07 Aug 2026
  • BIODIVERSITY METRIC Correspondence · 07 Aug 2026
  • AIR QUALITY ASSESSMENT Report · 07 Aug 2026
  • NOISE ASSESSMENT Report · 07 Aug 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 07 Aug 2026
  • INCLUDING AFFORDABLE HOUSING STATEMENT AND STATEMENT OF COMMUNITY INVOLVEMENT Planning Statement · 07 Aug 2026
  • AFFORDABLE HOUSING STATEMENT Report · 07 Aug 2026
  • DESK-BASED ASSESSMENT - ARCHAEOLOGY Report · 07 Aug 2026
  • FIRE STATEMENT Report · 07 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Poplar Fire Station, 168 East India Dock Road, London, E14 0BP

    PA/26/00864/NC Submitted 21 May 2026 100 yards away

    The proposal is to decarbonise Poplar Fire Station while renewing aging or unserviceable systems. The main components of this project are: - Replacement of Heating and Domestic Hot Water Central Plant with Air Sourced Heat Pumps (ASHPs) located on the roof; - Installation of roof insulation and raising roof parapet by 250mm to accommodate the increased roof insulation; - Relocating existing solar PV panels on the roof to accommodate the new ASHPs.

    Granted Full applications 13 docs
  • 1-35 Plimsoll Close, London, E14

    PA/26/00072/NC Submitted 29 Jan 2026 100 yards away

    Works to T1, T2, T3 - ( Plantanus Hispanica Trees) - Pollard by 4 metres.

    Granted Trees 5 docs
  • BT Street Hub Outside 175 to 179, East India Dock Road, London, E14 0EA

    PA/25/01748/NC Submitted 9 Oct 2025 100 yards away

    Display of double sided digital 75-inch LCD display screens on the Street Hub unit

    Refused Advertising 14 docs
  • BT Street Hub Outside 175 to 179, East India Dock Road, London, E14 0EA

    PA/25/01747/NC Submitted 9 Oct 2025 100 yards away

    Proposed installation of a new Street Hub 3 unit

    Refused Full applications 14 docs
    Several homes
  • 12-14 Vesey Path, London, E14 6BT

    PA/26/00027/NC Submitted 19 Jan 2026 150 yards away

    The retention of 1 illuminated logo panel and 2 non-illuminated top/bottom signs associated to the ATM

    Granted Advertising 8 docs
  • 12-14 Vesey Path, London, E14 6BT

    PA/26/00026/NC Submitted 19 Jan 2026 150 yards away

    The retention of an Automated Teller Machine and associated signage

    Granted Full applications 8 docs