Skip to content
PlanIndex Get alerts
Menu

Planning application

Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR

Awaiting decision Tower Hamlets PA/26/00697/NC Variation / Removal Condition (TCPA S73)

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from vacant former Use Class E(e) (medical or health services) to Use Class C1 (hotel) and associated internal and external alterations and extensions plus ancillary works. Minor Material Amendment to Planning Permission Ref: PA/21/02551, Dated 18/10/2022 Amendment to condition nos 2 (Approved Plans), 9 (Biodiversity mitigation and enhancement), 11 (Fire Safety), 13 (Site Waste Management), 14 (Deliveries and Servicing) 15 (Scheme of Highway Improvement Works) and rewording of Condition19 (Air Quality Standards for Boilers).

As published by the council, reference PA/26/00697/NC

Application record

Reference
PA/26/00697/NC
Type
Variation / Removal Condition (TCPA S73)
Status
Registered
Received
20 Apr 2026
Validated
20 Apr 2026
Ward
Shadwell
Decision by
Delegated
Postcode
E1 0LR

Site history

Applications at this address on the Tower Hamlets register

This site has had 5 applications since 2025: 2 approved, 0 refused.

  • PA/26/01445/S Awaiting decision

    Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR

    Submission of details pursuant to condition no.19 (Air Quality Standards), of planning permission...

    Submitted 14 Aug 2026
  • PA/26/00692/NC Awaiting decision

    Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR

    Change of use from vacant former Use Class E(e) (medical or health services) to Use Class C1 (hotel) and associated internal and external alterations and extensions plus ancillary works.

    Submitted 6 May 2026 Heritage and listed buildings
  • PA/25/01767/S Granted

    Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR

    Submission of details pursuant to Condition 15 (Scheme of Highway Improvement Works) of planning permission ref: PA/21/02551, dated 08/10/2022.

    Decided 6 Mar 2026 Conditions
  • PA/25/01476/S Granted

    Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR

    Submission of details pursuant to condition no.3 (Construction Management Plan) of planning permission ref: PA/21/02551, dated 18/10/2022

    Decided 26 Mar 2026 Conditions

Timeline

Dates from the published record

  1. 20 Apr 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: PA/21/02551/A1 (Decided)

Who's behind it

Company information only, from the register and Companies House

Iceni Projects Ltd. Agent, registered in London

Active · incorporated 2005 · London

766 applications on PlanIndex · across 90 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

70 documents on file for this application

  • TFL Consultee Comment · 23 Jul 2026
  • TFL Consultee Comment · 22 May 2026
  • ADDENDUM Planning Statement · 21 May 2026
  • HISTORIC ENGLAND Consultee Comment · 13 May 2026
  • LONDON UNDERGROUND Consultee Comment · 07 May 2026
  • HISTORIC ENGLAND GLAAS Consultee Comment · 05 May 2026
  • HSE HAS NO INTEREST Consultee Comment · 30 Apr 2026
  • DELIVERY AND SERVICING PLAN Report · 20 Apr 2026
  • PLANTING PLAN - BASEMENT Current Plan · 20 Apr 2026
  • LANDSCAPE ADDENDUM PLANS Current Plan · 20 Apr 2026
  • BRUKL OUTPUT DOC - 384-398 COMMERCIAL ROAD - EXISTING Correspondence · 20 Apr 2026
  • 03-GA PROPOSED GROUND FLOOR PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECOND FLOOR PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - BASEMENT PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - NORTH ELEVATION Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SECTION CC AND DD Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SOUTH ELEVATION Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION EE AND FF Current Plan · 20 Apr 2026
  • 03-GA PROPOSED N - E AERIAL VIEW Current Plan · 20 Apr 2026
  • 03-GA 3D VIEW - COMMERCIAL ROAD PROPOSED VIEW 3 Current Plan · 20 Apr 2026
  • PLANNING COMPLIANCE REPORT - SECTION 73 - PART 1 Report · 20 Apr 2026
  • ARBORICULTURAL METHOD STATEMENT - ADDENDUM Correspondence · 20 Apr 2026
  • TRANSPORT ASSESSMENT - PART 1 Report · 20 Apr 2026
  • BIODIVERSITY ENHANCEMENTS Correspondence · 20 Apr 2026
  • BRUKL OUTPUT DOC - STEELS LANE PLANNING STRATEGY Correspondence · 20 Apr 2026
  • FIRE STATEMENT AND FIRE SAFETY STRATEGY Report · 20 Apr 2026
  • 03-GA PROPOSED FIRST FLOOR PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED THIRD FLOOR PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - ROOF PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SOUTH ELEVATION Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SITE PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION AA AND BB Current Plan · 20 Apr 2026
  • 03-GA PROPOSED N - W AERIAL VIEW Current Plan · 20 Apr 2026
  • 03-GA PROPOSED CLOSE-UP VIEWS Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION II AND JJ Current Plan · 20 Apr 2026
  • S73 STATEMENT OF CONFORMITY BASEMENT CONSTRUCTION Correspondence · 20 Apr 2026
  • S73 STATEMENT OF CONFORMITY Correspondence · 20 Apr 2026
  • TRAVEL PLAN Report · 20 Apr 2026
  • BIODIVERSE ROOF DETAILS Current Plan · 20 Apr 2026
  • ENERGY MODELLING UPDATE Report · 20 Apr 2026
  • 02-DEMOLITION - GROUND FLOOR Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SECOND FLOOR PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED FOURTH FLOOR PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED ROOF PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SECTION AA AND BB Current Plan · 20 Apr 2026
  • 03-GA PROPOSED NORTH ELEVATION Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION CC, DD AND D2D2 Current Plan · 20 Apr 2026
  • 03-GA PROPOSED S - E AERIAL VIEW Current Plan · 20 Apr 2026
  • 03-GA 3D VIEW - COMMERCIAL ROAD PROPOSED VIEW 2 Current Plan · 20 Apr 2026
  • PART 2 Design & Access Statement · 20 Apr 2026
  • ADDENDUM Planning Statement · 20 Apr 2026
  • AIR QUALITY ASSESSMENT Report · 20 Apr 2026
  • SITE WASTE MANAGEMENT PLAN Report · 20 Apr 2026
  • TRANSPORT ASSESSMENT - PART 2 Report · 20 Apr 2026
  • PLANTING PLAN - GROUND FLOOR Current Plan · 20 Apr 2026
  • BRUKL OUTPUT DOC - STEELS LANE ASHP DHW DAIKIN SCOP NO MVHR Correspondence · 20 Apr 2026
  • 02-DEMOLITION - FIRST FLOOR PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - THIRD FLOOR PLAN Current Plan · 20 Apr 2026
  • 03-GA PROPOSED BASEMENT PLAN Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SOUTH ELEVATION Current Plan · 20 Apr 2026
  • 02-DEMOLITION - SECTION EE AND FF Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION GG AND HH Current Plan · 20 Apr 2026
  • 03-GA PROPOSED SECTION KK AND LL Current Plan · 20 Apr 2026
  • 03-GA PROPOSED S - W AERIAL VIEW Current Plan · 20 Apr 2026
  • PART 1 Design & Access Statement · 20 Apr 2026
  • PLANNING COMPLIANCE REPORT - SECTION 73 - PART 2 Report · 20 Apr 2026
  • COVERING LETTER DATED: 17 APRIL 2026 Correspondence · 20 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided amendment applications in a median of 45 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Tower Hamlets

  • PA/26/00532/S Granted

    Land Comprising Harriott House, Apsley House, Pattison House, The Redcoat Centre & Redcoat Community Centre, London, E1

    Application for Non-Material amendment to planning permission ref: PA/24/00368, dated 26/06/2025. Non Material amendments Sought: Several technical amendments to ensure that the consented scheme achieves full compliance with current Building Regulations, British Standards, and fire safety requirements.

    15 Apr 2026 Amendments
  • PA/26/00838/NC Granted

    Tower Wharf, Tower of London and Arches beneath Tower Bridge, Tower Bridge Approach, London, EC3N 4AB

    Application for Non-Material amendment to planning permission ref: PA/25/00620, Dated 30/06/2025. Non Material amendment(s) Sought: Reconfiguration of Reveller entrance doors Alterations to doors within Moat Arches Increase in ASHP enclosure footprint

    12 May 2026 Amendments
  • PA/26/00812/S Granted

    Pavement in front of 197 to 337 Whitechapel Road, Whitechapel Road, London, E1

    Application for non-material amendment of Planning permission Ref: PA/24/01403, Dated 07/02/2025 Non Material Amendment(s) Sought: Removal of Bulkhead: The overhead bulkhead as been omitted in favour of demountable components. A fall to the roof tarp will be formed through the installation of a 'pitch former' fixed to the top bars.

    7 May 2026 Amendments
  • PA/26/00935/S Granted

    Wood Wharf RM01A (Development Plots A1, A4 and B3) Wood Wharf, Prestons Road, London E14

    Application for Non-Material amendment to planning permission ref: PA/16/00772, Dated 16/06/2026. Non Material amendment(s) Sought: The repositioning of the fence line at One Park Drive (Plot A1) Removal of Condition 3 to the RMA 01A

    28 May 2026 Amendments
  • PA/26/00734/S Granted

    Former News International Site, Buildings H & J, London Dock, 1 Virginia Street, London E98 1XY

    Application for Non-Material Amendment to planning permission ref: PA/23/02079, Dated 26/06/2024. Non-Material Amendment(s) Sought: Minor internal and external modifications to Building H resulting from a new core configuration and the optimisation of internal layouts

    24 Apr 2026 Amendments