Planning application
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from vacant former Use Class E(e) (medical or health services) to Use Class C1 (hotel) and associated internal and external alterations and extensions plus ancillary works.
As published by the council, reference PA/26/00692/NC
Application record
- Reference
- PA/26/00692/NC
- Type
- Listed Building Consent (S8 P&LBC 1990)
- Status
- Registered
- Received
- 6 May 2026
- Validated
- 6 May 2026
- Ward
- Shadwell
- Decision by
- Delegated
- Postcode
- E1 0LR
Site history
Applications at this address on the Tower Hamlets register
This site has had 5 applications since 2025: 2 approved, 0 refused.
-
PA/26/01445/S Awaiting decision
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Submission of details pursuant to condition no.19 (Air Quality Standards), of planning permission...
-
PA/26/00697/NC Awaiting decision
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Change of use from vacant former Use Class E(e) (medical or health services) to Use Class C1 (hotel) and associated internal and external alterations and extensions plus ancillary works. Minor Material Amendment to Planning Permission Ref: PA/21/02551, Dated 18/10/2022 Amendment to condition nos 2 (Approved Plans), 9 (Biodiversity mitigation and enhancement), 11 (Fire Safety), 13 (Site Waste Management), 14 (Deliveries and Servicing) 15 (Scheme of Highway Improvement Works) and rewording of Condition19 (Air Quality Standards for Boilers).
-
PA/25/01767/S Granted
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Submission of details pursuant to Condition 15 (Scheme of Highway Improvement Works) of planning permission ref: PA/21/02551, dated 08/10/2022.
-
PA/25/01476/S Granted
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Submission of details pursuant to condition no.3 (Construction Management Plan) of planning permission ref: PA/21/02551, dated 18/10/2022
Timeline
Dates from the published record
-
6 May 2026
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Iceni Projects Ltd. Agent, registered in London
Active · incorporated 2005 · London
766 applications on PlanIndex · across 90 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
- ADDENDUM
- AIR QUALITY ASSESSMENT
- BRUKL OUTPUT DOC - STEELS LANE ASHP DHW DAIKIN SCOP NO MVHR
- BIODIVERSITY ENHANCEMENTS
- DELIVERY AND SERVICING PLAN
- FIRE STATEMENT AND FIRE SAFETY STRATEGY
- DEMOLITION - FIRST FLOOR PLAN
- 02-DEMOLITION - THIRD FLOOR PLAN
- 03-GA PROPOSED BASEMENT PLAN
- 02-DEMOLITION - SOUTH ELEVATION
- 02-DEMOLITION - SECTION EE AND FF
- 03-GA PROPOSED SETION GG AND HH
- 03-GA PROPOSED SECTIONS KK AND LL
- 03-GA PROPOSED S - W AERIAL VIEW
- 03-GA PROPOSED SECTIONS II AND JJ
- PLANNING COMPLIANCE REPORT - SECTION 73 - PART 2
- ENERGY MODELLING UPDATE
- PLANTING PLAN - BASEMENT
- TRANSPORT ASSESSMENT - PART 1
- DEMOLITION GROUND FLOOR PLAN
- 02-DEMOLITION - SECOND FLOOR PLAN
- 03-GA PROPOSED FOURTH FLOOR PLAN
- 03-GA PROPOSED ROOF PLAN
- 02-DEMOLTION - SECTION AA AND BB
- 03-GA PROPOSED NORTH ELEVATION
- 03-GA PROPOSED SECTION CC, DD AND D2D2
- 03-GA PROPOSED S - E AERIAL VEIW
- 03-GA 3D VIEW - COMMERCIAL ROAD PROPOSED VIEW 2
- ADDENDUM
- S73 STATEMENT OF CONFORMITY BASEMENT CONSTRUCTION
- BRUKL OUTPUT DOC - STEELS LANE PLANNING STRATEGY
- BIODIVERSE ROOF DETAILS
- ARBORICULTURAL METHOD STATEMENT (ADDENDUM)
- TECHNICAL NOTE
- PART 1
- 03-GA PROPOSED FIRST FLOOR PLAN
- 03-GA PROPOSED THIRD FLOOR PLAN
- 02-DEMOLITION - ROOF PLAN
- 02-DEMOLITION - SECTION GG AND HH
- 03-GA PROPOSED SITE PLAN
- 03-GA PROPOSED SECTION AA AND BB
- 03-GA PROPOSED N - W AERIAL VIEW
- 03-GA PROPOSED CLOSE-UP VIEWS
- EXISTING SITE LOCATION AND SITE PLAN
- BRUKL OUTPUT DOC - 384-398 COMMERCIAL ROAD - EXISTING
- TRAVEL PLAN
- PLANTING PLAN - GROUND FLOOR
- SITE WASTE MANAGEMENT PLAN
- TRANSPORT ASSESSMENT - PART 2
- PART 2
- 03-GA PROPOSED GROUND FLOOR PLAN
- 03-GA PROPOSED SECOND FLOOR PLAN
- 02-DEMOLITION - BASEMENT PLAN
- 02-DEMOLITION - NORTH ELEVATION
- 02-DEMOLITION - SECTION CC AND DD
- 03-GA PROPOSED SOUTH ELEVATION
- 03-GA PROPOSED SECTION EE AND FF
- 03-GA PROPOSED N - E AERIAL VIEW
- 03-GA 3D VIEW - COMMERCIAL ROAD PROPOSED VIEW 3
- PLANNING COMPLIANCE REPORT - SECTION 73 - PART 1
- S73 ECOLOGY REVIEW
- COVERING LETTER DATED: 17 APRIL 2026
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided heritage and listed building applications in a median of 56 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Submission of details pursuant to condition no.3 (Construction Management Plan) of planning permission ref: PA/21/02551, dated 18/10/2022
Granted Conditions 36 docs -
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
Submission of details pursuant to Condition 15 (Scheme of Highway Improvement Works) of planning permission ref: PA/21/02551, dated 08/10/2022.
Granted Conditions 4 docs -
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
93% historically approved · decision due ~15 Jun
Change of use from vacant former Use Class E(e) (medical or health services) to Use Class C1 (hotel) and associated internal and external alterations and extensions plus ancillary works. Minor Material Amendment to Planning Permission Ref: PA/21/02551, Dated 18/10/2022 Amendment to condition nos 2 (Approved Plans), 9 (Biodiversity mitigation and enhancement), 11 (Fire Safety), 13 (Site Waste Management), 14 (Deliveries and Servicing) 15 (Scheme of Highway Improvement Works) and rewording of Condition19 (Air Quality Standards for Boilers).
Awaiting decision Amendments Extension 70 docs -
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LB
91% historically approved · decision due ~25 Sep
Submission of details pursuant to condition no.6 (Proposals) of planning permission ref: PA/24/01...
Awaiting decision -
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LR
91% historically approved · decision due ~9 Oct
Submission of details pursuant to condition no.19 (Air Quality Standards), of planning permission...
Awaiting decision -
Steels Lane Health Centre, 384-398 Commercial Road, London, E1 0LB
91% historically approved · decision due ~21 Aug
Submission of Details Pursuant to Condition No.5a (Details drawings at a scale of 1:5 of works to...
Awaiting decision
Other heritage and listed building applications
In Tower Hamlets
-
PA/26/00871/NC Granted
102 Old Ford Road, London, E2 9PW
Replacement of three sash window units (W1, W2, W3); sash boxes retained; 14mm slimline double glazing, integral gazing bar and dark grey paint finish
-
PA/25/02018/NC Granted
Bonner Mile End Primary School Building 1, 2C Ropery Street, London, E3 4QE
The proposed works include: Installation of air-source heat pumps (ASHPs) to Block A; Replacement and upgrading of all existing cast iron radiators and pipework; Adaptation of the storage outbuilding (Block D) to accommodate a new substation to cope with increased electrical demand as a result of decarbonising the heating infrastructure; Enhancement of the school play area; Replacement of all existing single-glazed windows with new heritage-style timber frame, double glazing windows; Replacement of all external timber doors in the same style as existing; Adding further loft insulation to the existing loft space to Block A.
-
PA/26/00844/NC Granted
Wapping Hydraulic Power Station, Wapping Wall, London, E1W 3SG
Installation of secondary glazing to the Boiler House and Coal Store windows, and the application of a waterproof membrane to the interior of the high-level water tanks.
-
PA/26/00921/NC Granted
Wapping Hydraulic Power Station, Wapping Wall, London, E1W 3SG
Demountable, temporary and time limited works for a period of up to 3 years comprising the installation of new entrance gates; the installation of free-standing metal ramps to provide step-free access to the Turbine Hall and Filter House entrances; the installation of a painted timber hoarding to the Accumulator Tower opening, and; the installation of acoustic enclosures to the openings between the Boiler House and Filter House.
-
PA/26/00374/NC Granted
397-399 Westferry Road, London, E14 3AE
Replacement of existing modern doors with new modern doors, replacement of existing modern glazing with attenuated louvers at east elevation. Existing blocked up doorway to be opened and new attenuated louvers to be installed and replacement of existing modern doors at north elevation. Internal alterations to include, removal of the existing modern ground and first floors structures that dominate the internal space, creation of independent single storey structure to provide changing rooms, creation of independent single storey structure to provide a plant room, external signage and other minor associated works.