Skip to content
PlanIndex Get alerts
Menu

Planning application

Professional Development Centre, 229 Bethnal Green Road, E2 6AB And 10 Turin Street, E2 6GX

Awaiting decision Tower Hamlets PA/26/00589/A1 Full Planning Permission

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Comprehensive redevelopment of the site comprising demolition of existing buildings (with the exception of the PDC Building, including partial demolition thereof), and the erection of a 5-storey building to provide residential dwellings (Use Class C3) and an Idea Store (Use Class F1), alongside associated servicing, car parking, public realm and ancillary works.

As published by the council, reference PA/26/00589/A1

Application record

Reference
PA/26/00589/A1
Type
Full Planning Permission
Status
Registered
Received
21 Apr 2026
Validated
21 Apr 2026
Ward
Weavers
Decision by
Development Committee
Postcode
E2 6AB

Timeline

Dates from the published record

  1. 21 Apr 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Sphere25 LLP Agent, registered in Waterbeach

Active · incorporated 2018 · Waterbeach

163 applications on PlanIndex · across 21 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

154 documents on file for this application

  • TFL Consultee Comment · 05 Jun 2026
  • CULTURE AND COMMUNITY SPACES AT RISK, GLA Consultee Comment · 03 Jun 2026
  • SPORT ENGLAND Consultee Comment · 22 May 2026
  • THAMES WATER Consultee Comment · 12 May 2026
  • HISTORIC ENGLAND Consultee Comment · 11 May 2026
  • LONDON UNDERGROUND Consultee Comment · 08 May 2026
  • LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST Correspondence · 23 Apr 2026
  • EXISTING GROUND FLOOR PLAN Current Plan · 23 Apr 2026
  • EXISTING FIRST FLOOR PLAN Current Plan · 23 Apr 2026
  • EXISTING SITE SECTION BB Current Plan · 23 Apr 2026
  • EXISTING SOUTH ELEVATION Current Plan · 23 Apr 2026
  • EXISTING NORTH ELEVATION Current Plan · 23 Apr 2026
  • 10 TURN STREET DRAWINGS Current Plan · 23 Apr 2026
  • WEIGHTLIFTING CLUB DRAWINGS Current Plan · 23 Apr 2026
  • BNG METRIC Correspondence · 23 Apr 2026
  • DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE - PART 1 Report · 10 Apr 2026
  • DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE - PART 2 Report · 10 Apr 2026
  • DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE - PART 3 Report · 10 Apr 2026
  • DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE - PART 4 Report · 10 Apr 2026
  • DESKTOP STUDY, PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE - PART 5 Report · 10 Apr 2026
  • SUSTAINABILITY STATEMENT Report · 09 Apr 2026
  • EQUALITY IMPACT ASSESSMENT INITIAL SCREENING TOOL Report · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-0-2 (BASELINE) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-0-2 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-0-2 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-1-5 (BASELINE) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-1-5 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-1-5 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-2-7 (BASELINE) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-2-7 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK B_B-2-7 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F06 - 3B5P M4 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F06 - 3B5P M4 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F05 - 3B5P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F05 - 3B5P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F04 - 2B4P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F04 - 2B4P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F03 - 2B3P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F03 - 2B3P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F02 - 4B6P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F02 - 4B6P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F01 - 1B2P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_4F01 - 1B2P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F06 - 3B5P M4 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F06 - 3B5P M4 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F05 - 3B5P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F05 - 3B5P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F04 - 2B4P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F04 - 2B4P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F03 - 2B3P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F03 - 2B3P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F02 - 4B6P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F02 - 4B6P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F01 - 1B2P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_2F01 - 1B2P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F06 - 3B5P M4 (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F06 - 3B5P M4 (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F05 - 3B5P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F05 - 3B5P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F04 - 2B4P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F04 - 2B4P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F03 - 2B3P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F03 - 2B3P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F02 - 4B6P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F02 - 4B6P (BE GREEN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F01 - 1B2P (BE LEAN) Correspondence · 09 Apr 2026
  • SAP WORKSHEETS - BLOCK A_1F01 - 1B2P (BE GREEN) Correspondence · 09 Apr 2026
  • EQUALITY IMPACT ASSESSMENT INITIAL SCREENING TOOL Correspondence · 01 Apr 2026
  • PART 3 Design & Access Statement · 31 Mar 2026
  • EXISTING SITE PLAN Current Plan · 31 Mar 2026
  • EXISTING SITE SECTION AA Current Plan · 31 Mar 2026
  • EXISTING WEST ELEVATION Current Plan · 31 Mar 2026
  • PROPOSED FIRST FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED ROOF PLAN Current Plan · 31 Mar 2026
  • PROPOSED NORTH ELEVATION Current Plan · 31 Mar 2026
  • PROPOSED WEST ELEVATION - BAY STUDY Current Plan · 31 Mar 2026
  • PROPOSED SECOND FLOOR PLAN Current Plan · 31 Mar 2026
  • PART 1 Design & Access Statement · 31 Mar 2026
  • SITE LOCATION PLAN Current Plan · 31 Mar 2026
  • EXISTING SECOND MEZZANINE FLOOR PLAN Current Plan · 31 Mar 2026
  • EXISTING SITE SECTION CC Current Plan · 31 Mar 2026
  • EXISTING EAST ELEVATION Current Plan · 31 Mar 2026
  • PROPOSED THIRD FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECTION BB Current Plan · 31 Mar 2026
  • PROPOSED SOUTH ELEVATION Current Plan · 31 Mar 2026
  • PROPOSED FIRST FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED ROOF PLAN Current Plan · 31 Mar 2026
  • PART 6 Design & Access Statement · 31 Mar 2026
  • PART 4 Design & Access Statement · 31 Mar 2026
  • PROPOSED SITE PLAN Current Plan · 31 Mar 2026
  • EXISTING SECOND FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECOND FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECTION AA Current Plan · 31 Mar 2026
  • PROPOSED EAST ELEVATION Current Plan · 31 Mar 2026
  • PROPOSED GROUND FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECOND MEZZANINE FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECTION CC Current Plan · 31 Mar 2026
  • PART 2 Design & Access Statement · 31 Mar 2026
  • BAY STUDY - EXISTING AND PROPOSED SOUTH ELEVATION Current Plan · 31 Mar 2026
  • EXISTING FIRST FLOOR PLAN Current Plan · 31 Mar 2026
  • EXISTING ROOF PLAN Current Plan · 31 Mar 2026
  • PROPOSED GROUND FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED FOURTH FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECTION CC Current Plan · 31 Mar 2026
  • PROPOSED WEST ELEVATION Current Plan · 31 Mar 2026
  • MPROPOSED FIRST MEZZANINE FLOOR PLAN Current Plan · 31 Mar 2026
  • PROPOSED SECTION AA Current Plan · 31 Mar 2026
  • PROPOSED SECTION BB Current Plan · 31 Mar 2026
  • PROPOSED NORTH ELEVATION Current Plan · 31 Mar 2026
  • BIODIVERSITY NET GAIN ASSESSMENT Report · 31 Mar 2026
  • CGI VIEW 2 Current Plan · 31 Mar 2026
  • PRA METHODOLOGY Correspondence · 31 Mar 2026
  • DESK STUDY AND PRELIMINARY RISK ASSESSMENT AND SITE RECONNAISSANCE Report · 31 Mar 2026
  • ENVIROCHECK REPORT - MINING AND GROUND STABILITY DATASHEET Report · 31 Mar 2026
  • LANDSCAPE MANAGEMENT PLAN Report · 31 Mar 2026
  • PLANTING SCHEDULE Correspondence · 31 Mar 2026
  • PROPOSED SOUTH ELEVATION Current Plan · 31 Mar 2026
  • CGI VIEW 4 Current Plan · 31 Mar 2026
  • CONSTRUCTION MANAGEMENT PLAN - APPENDICES A - SITE LOCATION PLAN Report · 31 Mar 2026
  • LANDSCAPE EQUIPMENT AND FURNITURE SCHEDULE Correspondence · 31 Mar 2026
  • PROPOSED LIGHTING PLAN Current Plan · 31 Mar 2026
  • CAVAT VALUATION FOR PROPOSED DEVELOPMENT Correspondence · 31 Mar 2026
  • PROPOSED WEST ELEVATION Current Plan · 31 Mar 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Report · 31 Mar 2026
  • CGI VIEW 1 Current Plan · 31 Mar 2026
  • CONSTRUCTION MANAGEMENT PLAN Report · 31 Mar 2026
  • RAPID HEALTH IMPACT ASSESSMENT MATRIX - SELF-COMPLETION FORM Report · 31 Mar 2026
  • PROPOSED LANDSCAPE PLAN Current Plan · 31 Mar 2026
  • PROPOSED UGF KEY PLAN Current Plan · 31 Mar 2026
  • ARBORICULTURAL REPORT AND TREE SURVEY Report · 31 Mar 2026
  • PROPOSED EAST ELEVATION Current Plan · 31 Mar 2026
  • OPERATIONAL WASTE MANAGEMENT STRATEGY Report · 31 Mar 2026
  • BNG METRIC Correspondence · 31 Mar 2026
  • CGI VIEW 3 Current Plan · 31 Mar 2026
  • APPENDIICES Daylight & Sunlight · 31 Mar 2026
  • ENVIROCHECK REPORT DATASHEET Report · 31 Mar 2026
  • PROPOSED TREE PLAN Current Plan · 31 Mar 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 31 Mar 2026
  • RIBA STAGE 3 LONDON PLAN FIRE STATEMENT Report · 31 Mar 2026
  • PART 5 Design & Access Statement · 31 Mar 2026
  • RESIDENTIAL TRAVEL PLAN Report · 31 Mar 2026
  • AIR QUALITY ASSESSMENT Report · 31 Mar 2026
  • ENERGY STATEMENT Report · 31 Mar 2026
  • COVER LETTER Correspondence · 31 Mar 2026
  • DRAINAGE STRATEGY Report · 31 Mar 2026
  • NOISE IMPACT ASSESSMENT Report · 31 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Bus Shelter, Pavement Outside 233 Bethnal Green Road, London, E2

    PA/26/00469/NC Submitted 16 Mar 2026 50 yards away

    Internal illuminated sequential advertisement capable of static and dynamic content display with automatic rotation of images

    Granted Advertising 9 docs
  • 224 Bethnal Green Road, London, E2 0AA

    PA/25/02057/NC Submitted 4 Dec 2025 100 yards away

    New extractor flue for e(b)-restaurant and internal alterations

    Granted Full applications 15 docs
  • 222 Bethnal Green Road, London, E2 0AA

    PA/26/00784/NC Submitted 30 Apr 2026 100 yards away

    Proposed x1 illuminated digital fascia sign

    Refused Advertising 5 docs
  • 256 Bethnal Green Road, London, E2 0AA

    PA/26/01297/NC Submitted 14 Aug 2026 100 yards away

    85% historically approved · decision due ~9 Oct

    Retention and regularisation of the repositioned rear kitchen extract flue and associated extraction plant serving the existing restaurant

    Awaiting decision Full applications 9 docs
  • 281-285 Bethnal Green Road, London, E2 6AH

    PA/26/00281/S Submitted 16 Feb 2026 150 yards away

    97% historically approved · decision due ~13 Apr

    Submission of details pursuant to condition no.4 (Construction Management and Logistics Plan) of planning permission ref: PA/21/02204, dated 06/01/2023

    Awaiting decision Conditions 21 docs
  • 183 Bethnal Green Road, London, E2 6AB

    PA/25/01774/A1 Submitted 10 Nov 2025 150 yards away

    Demolition of single storey rear extension. Erection of single storey rear extension with basement, second floor rear extension, upwards extension to create one additional storey comprising one dwelling, alterations to shopfront and associated internal alterations. (Amended Description)

    Granted Full applications Extension Demolition +1 26 docs
    Domestic

In Tower Hamlets

  • PA/26/00916/NC Granted

    2 Athelstane Grove, London, E3 5JG

    Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.

    Received 3 Jun, published by the council 25 Jul 2026 Full applications
  • PA/26/01504/NC Awaiting decision

    412 Hackney Road, London, E2 7AP

    Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.

    Received 4 Sep, published by the council 11 Oct 2026 Full applications
  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    Received 25 Mar, published by the council 25 Jul 2026 Full applications
  • PA/26/01526 Awaiting decision

    37 Zealand Road, London, E3 5RA

    Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.

    Received 1 Sep, published by the council 4 Sep 2026 Full applications
  • PA/26/01527 Awaiting decision

    53 Ellesmere Road, London, E3 5QU

    Proposed mansard roof extension

    Received 1 Sep, published by the council 4 Sep 2026 Full applications