Planning application
183 Bethnal Green Road, London, E2 6AB
Works: Extension Demolition Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of single storey rear extension. Erection of single storey rear extension with basement, second floor rear extension, upwards extension to create one additional storey comprising one dwelling, alterations to shopfront and associated internal alterations. (Amended Description)
As published by the council, reference PA/25/01774/A1
Application record
- Reference
- PA/25/01774/A1
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permit
- Received
- 10 Nov 2025
- Validated
- 10 Nov 2025
- Decided
- 20 Mar 2026
- Ward
- Weavers
- Decision by
- Delegated
- Postcode
- E2 6AB
Timeline
Dates from the published record
-
10 Nov 2025
Received by Tower Hamlets
-
20 Mar 2026
Decision issued: Permit
-
25 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Ankur Architects Agent, an architecture practice
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
- OFFICERS REPORT
- DECISION_NOTICE
- LETTER ON HIGHWAYS AND WASTE INFORMATION 23RD JANUARY 2026
- AND SUSTAINABILITY STATEMENT
- EXISTING & PROPOSED DRAINAGE LAYOUT
- PROPOSED BASEMENT FLOOR & GROUND FLOOR PLAN
- PROPOSED SATCHWELL ROAD (EAST) ELEVATION
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED BETHNAL GREEN ROAD (SOUTH) ELEVATION
- PROPOSED REAR (NORTH) ELEVATION
- PROPOSED WEST ELEVATION
- PROPOSED SECTION AA
- SHOP FRONT DETAIL
- WINDOW REVEAL DETAIL
- BICYCLE PARKING DETAIL
- CONSTRUCTION MANAGEMENT PLAN
- EXISTING FLOOR PLANS AND ELEVATIONS
- LONDON UNDERGROUND
- AIR QUALITY ASSESSMENT
- EXISTING SITE PLAN
- LOCATION PLAN
- PROPOSED DRAWINGS
- COVERING LETTER DATED: 06 OCT 2025
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission on 20 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
160 Bethnal Green Road, London, E2 6DG
97% historically approved · decision due ~1 Jul
Submission of details to discharge condition 6 (Car Free) of planning permission PA/14/3128 dated 02/01/2015
Awaiting decision Conditions 2 docs -
222 Bethnal Green Road, London, E2 0AA
Proposed x1 illuminated digital fascia sign
Refused Advertising 5 docs -
224 Bethnal Green Road, London, E2 0AA
New extractor flue for e(b)-restaurant and internal alterations
Granted Full applications 15 docs -
121 Bethnal Green Road, London, E2 7DG
91% historically approved · decision due ~12 Nov
Proposed x2 externally illuminated signages and x2 externally illuminated projection signs
Awaiting decision -
Bus Shelter, Pavement Outside 140 Bethnal Green Road, London E2
Display of a double sided internally illuminated digital screen to the existing bus shelter structure, including the display of subtle animated content.
Granted Advertising 8 docs -
Bus Shelter, Pavement Outside 233 Bethnal Green Road, London, E2
Internal illuminated sequential advertisement capable of static and dynamic content display with automatic rotation of images
Granted Advertising 9 docs
Other full applications
In Tower Hamlets
-
PA/26/00916/NC Granted
2 Athelstane Grove, London, E3 5JG
Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.
-
PA/26/01504/NC Awaiting decision
412 Hackney Road, London, E2 7AP
Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.
-
PA/26/00497/NC Decided
72 Cambridge Heath Road, London, E1 5QJ
The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.
-
PA/26/01526 Awaiting decision
37 Zealand Road, London, E3 5RA
Mansard roof extension, together with new front facing double-glazed timber sash dormer windows, rear facing double-glazed aluminium dormer windows, rear facing rooflights and roof integrated solar panels.
-
PA/26/01527 Awaiting decision
53 Ellesmere Road, London, E3 5QU
Proposed mansard roof extension