Planning application

Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

Granted Thurrock 24/00943/DCOAPP Development Consent Order Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application to discharge requirements in part for requirement 8 (external lighting) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)

As published by the council, reference 24/00943/DCOAPP

Application record

Reference
24/00943/DCOAPP
Type
Development Consent Order Application
Status
Permitted
Decision
Granted As published: Approved
Received
29 Aug 2024
Validated
29 Aug 2024
Decided
18 Oct 2024
Ward
OLD Tilbury Riverside And Thurrock Park
Decision by
Chief Planning Officer Decision
Postcode
RM18 8QR

Site history

Applications at this address on the Thurrock register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/00811/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

    Decided 19 Nov 2024
  • 24/00206/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part, for Requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure.

    Decided 23 Sep 2024

Timeline

Dates from the published record

  1. 29 Aug 2024

    Received by Thurrock

  2. 18 Oct 2024

    Decision issued: Approved

  3. 19 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 24/00811/DCOAPP (Permitted)

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • DECISION NOTICE Decision Notice · 18 Oct 2024
  • ENVIRONMENTAL HEALTH Consultee Comment · 20 Sep 2024
  • COVER LETTER 29.8.24 Cover Letter · 04 Sep 2024
  • DATA SHEET - FLODLIGHT Studies and Reports · 04 Sep 2024
  • DATA SHEET - PIR MOTION SENSOR Studies and Reports · 04 Sep 2024
  • ELIGHTING CONTAINER MOUNTING SUPPORT Current Plan · 04 Sep 2024
  • THURROCK STORAGE - GENERAL LIGHTING SCHEME - CW23502 REV H Studies and Reports · 04 Sep 2024
  • THURROCK STORAGE - OBTRUSIVE LIGHTING COMPLIANCE REPORT Studies and Reports · 04 Sep 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Thurrock granted permission on 18 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Thurrock's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00811/DCOAPP Submitted 24 Jul 2024 50 yards away

    Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

    Granted 27 docs
  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00206/DCOAPP Submitted 19 Feb 2024 50 yards away

    Application to discharge requirements in part, for Requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure.

    Granted 12 docs
  • West Tilbury Hall Church Road West Tilbury Essex RM18 8UB

    24/01252/TPOCA Submitted 26 Nov 2024 0.3 miles away

    T1. Horse Chestnut - removing 5 metres in length off the top and sides of the tree.

    Granted Trees 6 docs