Planning application

Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

Granted Thurrock 24/00811/DCOAPP Development Consent Order Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

As published by the council, reference 24/00811/DCOAPP

Application record

Reference
24/00811/DCOAPP
Type
Development Consent Order Application
Status
Permitted
Decision
Approved
Received
24 Jul 2024
Validated
24 Jul 2024
Decided
19 Nov 2024
Ward
OLD Tilbury Riverside And Thurrock Park
Decision by
Chief Planning Officer Decision
Postcode
RM18 8QR

Site history

Applications at this address on the Thurrock register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/00943/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part for requirement 8 (external lighting) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)

    Decided 18 Oct 2024
  • 24/00206/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part, for Requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure.

    Decided 23 Sep 2024

Timeline

Dates from the published record

  1. 24 Jul 2024

    Received by Thurrock

  2. 19 Nov 2024

    Decision issued: Approved

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Thurrock granted permission on 19 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Thurrock's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00943/DCOAPP Submitted 29 Aug 2024 0m away

    Application to discharge requirements in part for requirement 8 (external lighting) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)

    Granted 8 docs
  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00206/DCOAPP Submitted 19 Feb 2024 0m away

    Application to discharge requirements in part, for Requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure.

    Granted 13 docs