Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

Granted Thurrock 24/00206/DCOAPP Development Consent Order Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application to discharge requirements in part, for Requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure.

As published by the council, reference 24/00206/DCOAPP

Application record

Reference
24/00206/DCOAPP
Type
Development Consent Order Application
Status
Permitted
Decision
Granted As published: Approved
Received
19 Feb 2024
Validated
19 Feb 2024
Decided
23 Sep 2024
Ward
OLD Tilbury Riverside And Thurrock Park
Decision by
Chief Planning Officer Decision
Postcode
RM18 8QR

Site history

Applications at this address on the Thurrock register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/00943/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part for requirement 8 (external lighting) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)

    Decided 18 Oct 2024
  • 24/00811/DCOAPP Granted

    Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

    Decided 19 Nov 2024

Timeline

Dates from the published record

  1. 19 Feb 2024

    Received by Thurrock

  2. 23 Sep 2024

    Decision issued: Approved

  3. 19 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 23/00549/DCOAPP (Permitted)

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • DECISION NOTICE REQ 7 Decision Notice · 25 Sep 2024
  • DECISION NOTICE PART RELEASE Decision Notice · 29 Apr 2024
  • REQUIREMENT 17 - LOCAL EMPLOYMENT AND SKILLS STRATEGY Studies and Reports · 18 Apr 2024
  • PORT OF TILBURY Consultee Comment · 04 Apr 2024
  • ENVIRONMENTAL HEALTH Consultee Comment · 19 Mar 2024
  • ENVIRONMENT AGENCY Consultee Comment · 14 Mar 2024
  • TRAVEL PLAN Consultee Comment · 07 Mar 2024
  • REQUIREMENT 7 - PHASE 2 CWTP Studies and Reports · 06 Mar 2024
  • HIGHWAYS (TRAVEL PLAN) Consultee Comment · 28 Feb 2024
  • REQUIREMENT 5 - PHASE 2 COCP Studies and Reports · 19 Feb 2024
  • REQUIREMENT 6 - PHASE 2 CTMP Studies and Reports · 19 Feb 2024
  • REQUIREMENT 17 - LOCAL EMPLOYMENT AND SKILLS STRATEGY Studies and Reports · 19 Feb 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Thurrock granted permission on 23 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Thurrock's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00943/DCOAPP Submitted 29 Aug 2024 50 yards away

    Application to discharge requirements in part for requirement 8 (external lighting) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)

    Granted 8 docs
  • Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

    24/00811/DCOAPP Submitted 24 Jul 2024 50 yards away

    Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

    Granted 27 docs
  • West Tilbury Hall Church Road West Tilbury Essex RM18 8UB

    24/01252/TPOCA Submitted 26 Nov 2024 0.3 miles away

    T1. Horse Chestnut - removing 5 metres in length off the top and sides of the tree.

    Granted Trees 6 docs