Planning application
65 Bucknalls Lane Garston Watford Hertfordshire WD25 9NE
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of single storey side and rear extensions, conversion of garage into habitable accommodation and loft conversion including rear dormer window
As published by the council, reference 26/0536/FUL
Application record
- Reference
- 26/0536/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- approved
- Received
- 1 Apr 2026
- Validated
- 8 Apr 2026
- Decided
- 3 Jun 2026
- Ward
- Leavesden
- Parish
- Abbots Langley Parish Council
- Decision by
- Delegated Decision
- Postcode
- WD25 9NE
Timeline
Dates from the published record
-
1 Apr 2026
Received by Three Rivers
-
8 Apr 2026
Validated
Checked as complete and ready for consideration.
-
3 Jun 2026
Decision issued: approved
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Fullers Avenue Garston Watford Hertfordshire WD25 9BU
Part retrospective: Construction of timber pergola structure
Granted Amendments 15 docs -
69 Bucknalls Lane Garston Watford Hertfordshire WD25 9NE
Single storey front and rear extensions, roof extension including increase in ridge height to create a two storey dwelling with front dormer window and alterations to fenestration
Granted Full applications Extension Loft or dormer +2 11 docsSmall domestic -
71 Bucknalls Lane Garston Watford Hertfordshire WD25 9NE
Retrospective: Change of use of land to residential curtilage and addition of hardstanding, erection of a detached garage, boundary wall, fence and gates
Granted Amendments 11 docsSmall domestic -
71 Bucknalls Lane Garston WD25 9NE
Construction of two storey ancillary annexe fronting and accessed via Farriers Way
Refused Full applications 19 docs -
71 Bucknalls Lane Garston WD25 9NE
Change of use of land to residential curtilage and addition of hardstanding
Granted Full applications 9 docs -
69 Bucknalls Lane Garston Watford Hertfordshire WD25 9NE
Prior Approval: Single storey rear extension (depth 6 metres, maximum height 4 metres, maximum eaves height 2.9 metres)
Granted Outline Extension 9 docsSmall domestic
Other full applications applications
In Three Rivers
-
26/1384/FUL Awaiting decision
Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ
Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.
-
26/1380/FUL Awaiting decision
Crossley Wylde Loudwater Lane Loudwater Rickmansworth Hertfordshire WD3 3JD
Installation of rooflights
-
26/1372/FUL Awaiting decision
108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT
Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights
-
26/1365/FUL Awaiting decision
Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB
Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration
-
26/1358/FUL Awaiting decision
251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH
Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.