Skip to content
PlanIndex Get alerts
Menu

Planning application

The Poplars Swansea Road Pontlliw Swansea SA4 9DU

Awaiting decision Swansea 2025/1673/DOC Discharge of Conditions

Relates to 2020/0434/FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of conditions 3 (materials), Condition 6 (Tree protection plan), Condition 8 (CEMP), Condition 10 (surface water removal strategy), Condition 12 (foul drainage scheme), Condition 13 (landscaping scheme), Condition 15 (INNS scheme), and Condition 19 (SUDs) of planning permission 2020/0434/FUL granted 13th June 2024

As published by the council, reference 2025/1673/DOC

Application record

Reference
2025/1673/DOC
Type
Discharge of Conditions
Status
Being Considered
Received
29 Jul 2025
Validated
31 Jul 2025
Ward
Pontlliw And Tircoed - Area 1
Parish
Pontlliw Community Council
Postcode
SA4 9DU

Site history

Applications at this address on the Swansea register

This site has had 2 applications since 2025.

  • 2026/0922/DOC Awaiting decision

    The Poplars Swansea Road Pontlliw Swansea SA4 9DU

    Discharge of conditions 3 (Historic Building Recording and Analysis), 4 (Conservation Management Plan), 5 (protection of painted glass and internal and external floor tiles), 6 (method statement), 7 (large scale details for The Poplars), 8 (large scale details for The Stables) and 10 (method statement for internal works) of Planning Permission 2023/1893/LBC granted 18th September 2023

    Submitted 2 Jun 2026 Conditions

Timeline

Dates from the published record

  1. 29 Jul 2025

    Received by Swansea

  2. 31 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Swansea took a median of 55 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2020/0434/FUL Granted

    The Poplars Pontlliw Swansea

    Construction of 9 no. new dwellings with associated access, garages, parking and open space, conversion of the The Poplars into 2 no. residential units, conversion of stable building into 1 no. residential unit, demolition of lodge building and associated works

    Decided 22 Mar 2022 Full applications

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Penarth

5 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

40 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Swansea for determination, against a statutory target of eight weeks. Over the last year Swansea decided condition discharge and variation applications in a median of 55 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Poplars Pontlliw Swansea

    2020/0434/FUL Submitted 2 Mar 2020 0m away

    Construction of 9 no. new dwellings with associated access, garages, parking and open space, conversion of the The Poplars into 2 no. residential units, conversion of stable building into 1 no. residential unit, demolition of lodge building and associated works

    Granted Full applications New dwelling Demolition 171 docs
    Several homes
  • The Poplars Pontlliw Swansea

    2020/0435/LBC Submitted 2 Mar 2020 0m away

    Internal and external works to convert The Poplars (grade II listed) into 2 residential units, internal and external works to convert stable building (grade II listed) into single residential unit, works to garden wall structure and removal of ruined curtilage structures within walled garden (application for Listed Building Consent)

    Granted Heritage and listed buildings 104 docs
  • The Poplars Swansea Road Pontlliw Swansea SA4 9DU

    2026/0922/DOC Submitted 2 Jun 2026 46m away

    97% historically approved · decision due ~18 Aug

    Discharge of conditions 3 (Historic Building Recording and Analysis), 4 (Conservation Management Plan), 5 (protection of painted glass and internal and external floor tiles), 6 (method statement), 7 (large scale details for The Poplars), 8 (large scale details for The Stables) and 10 (method statement for internal works) of Planning Permission 2023/1893/LBC granted 18th September 2023

    Awaiting decision Conditions 42 docs
  • 45 Woodfield Avenue Pontlliw Swansea SA4 9EQ

    2024/0609/PRE Submitted 2 Apr 2024 108m away

    PRE-APP Removal of existing conservatory, part two storey, part single storey rear extension, enlargement of front and rear dormer

    Decided Other Extension Loft or dormer 4 docs
    Small domestic
  • 1 Clos Williams Pontlliw Swansea SA4 9FJ

    2025/1645/DOC Submitted 24 Jul 2025 113m away

    97% historically approved · decision due ~18 Sep

    Discharge of condition 12 (management and maintenance of streets) of Planning Permission 2017/1342/FUL granted 16th January 2018

    Awaiting decision Conditions 5 docs
  • 36 Christopher Rise Pontlliw Swansea SA4 9EN

    2025/2574/TPO Submitted 3 Dec 2025 152m away

    Reduction of lateral branches on three mature Quercus Robur (English oak) covered by TPO

    Granted Trees 8 docs

In Swansea

  • 2026/1228/DOC Granted

    52 Caswell Road Caswell Swansea SA3 4SD

    Discharge of Conditions 3 (Materials), 4 (Boundary treatments) and 6 (privacy screen) of Planning Permission 2025/0572/FUL granted 27th October 2025

    24 Jul 2026 Conditions
  • 2026/1418/DOC Awaiting decision

    106 Martin Street Morriston Swansea SA6 7BL

    Discharge of condition 4 (Landscaping), condition 5 (Materials), condition 6 (Construction Method Statement), condition 7 (Large scale details), condition 11 (Solar PV Details) of planning permission 2025/2492/FUL granted 2nd March 2026

    28 Aug 2026 Conditions
  • 2026/1406/DOC Awaiting decision

    Land North Of Garden Village Swansea

    Discharge of condition 13 (surface water removal strategy) of planning permission 2016/1478 granted 12th December 2019 (to re-apportion Phase 1 MOU betterment to Phase 2)

    27 Aug 2026 Conditions
  • 2026/1178/DOC Granted

    Margarets Cottage Oxwich Swansea SA3 1LS

    Discharge of condition 20 (thatch repairs) of Listed Building Consent 2024/1942/LBC granted 16th October 2025

    15 Jul 2026 Conditions
  • 2026/1175/DOC Granted

    Land West Of Rhypandy Road Morriston Swansea

    Discharge of condition 8 (measures to manage and contain fire water) of planning permission 2025/0855/FUL granted 18th December 2025

    14 Jul 2026 Conditions