Planning application
Oldminster Sidings The Docks Sharpness Gloucestershire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of locomotive shed, complete with internal workshop and erection of signal box.
As published by the council, reference S.25/0721/FUL
Application record
- Reference
- S.25/0721/FUL
- Type
- Full Planning Application
- Status
- Awaiting decision
- Received
- 10 Apr 2025
- Validated
- 23 Apr 2025
- Ward
- Berkeley Vale Ward
- Parish
- Hinton Parish Council
- Decision by
- DELEGATED
Timeline
Dates from the published record
-
10 Apr 2025
Received by Stroud
-
23 Apr 2025
Validated
Checked as complete and ready for consideration.
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stroud took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
78 documents on file for this application
- NATURAL ENGLAND
- STANDARD CONSULTATION VIA EMAIL
- DRAFT HRA & APPROPRIATE ASSESSMENT - SEVERN ESTUARY
- LOCAL LEAD FLOOD AUTHORITY
- LEAD LOCAL FLOOD AUTHORITY
- BNG OFFICER
- FLOOD AND LAND DRAINAGE ENGINEER
- LEAD LOCAL FLOOD AUTHORITY
- REVISED CONSULTATION VIA EMAIL
- REVISED CONSULTATION VIA EMAIL
- REVISED CONSULTATION VIA EMAIL
- STORM DRAINAGE SOLUTION
- DRAINAGE ASSESSMENT
- PROPOSED DRAINAGE LAYOUT
- BIODIVERSITY NET GAIN ASSESSMENT REVISION B
- BNG CONDITION ASSESSMENTS
- BNG METRIC REV B
- BIODIVERSITY GAIN PLAN
- BASELINE HABITAT MAP
- POST-DEVELOPMENT HABITAT MAP
- GCC MINERALS & WASTE
- REVISED CONSULTATION VIA EMAIL
- CULVERT CONNECTION
- BNG OFFICER
- WASTE MINIMISATION STATEMENT
- SITE PLAN INC REFUSE AREAS
- REVISED CONSULTATION VIA EMAIL
- ADDITIONAL BNG INFORMATION ? REPORT
- DRAINAGE OFFICER COMMENT
- CANAL & RIVER TRUST
- MINERALS AND WASTE
- SITE NOTICE NOV 17
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- SITE NOTICE NOV 17
- LLFA
- NETWORK RAIL COMMENT
- TREE OFFICER
- TREE OFFICER COMMENT
- CONTAMINATED LAND OFFICER
- ENVIRONMENTAL HEALTH
- HINTON PARISH COUNCIL
- BNG OFFICER
- PRELIMINARY ECOLOGICAL APPRAISAL
- HEALTH AND SAFETY EXECUTIVE
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- PARISH CONSULTATION LETTER WEB
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- STANDARD CONSULTATION VIA EMAIL
- SIGNAL BOX FLOOR PLANS
- APPLICATION FORM
- FLOOD RISK ASSESSMENT
- LOCOMOTIVE SHED - PROPOSED GROUND FLOOR PLAN
- BLOCK PLAN SOUTH
- BLOCK PLAN NORTH
- NOISE ASSESSMENT
- LANDSCAPING DETAILS
- PROTECTED SPECIES SURVEY
- PROPOSED SIGNAL BOX ELEVATIONS
- LOCOMOTIVE SHED - PROPOSED FIRST FLOOR PLANS
- THE LOCATION PLAN
- LOCOMOTIVE SHED - PROPOSED ELEVATIONS (EAST/SOUTH)
- LOCOMOTIVE SHED - PROPOSED ELEVATIONS (WEST/NORTH)
- LIGHTING ASSESSMENT
- PLANNING, DESIGN & ACCESS STATEMENT
- CONDITION SHEET
- BIODIVERSITY METRIC CALCULATION TOOL
- BIODIVERSITY STATEMENT
- ARBORICULTURAL IMPACT ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stroud for determination, against a statutory target of eight weeks. Over the last year Stroud decided full applications in a median of 89 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Sharpness Asphalt The Docks Sharpness Berkeley Gloucestershire GL13 9UX
82% historically approved · decision due ~20 Aug
Alterations to site layout of Asphalt Plant approved under S.21/2992/FUL. (Retrospective)
Awaiting decision Full applications 31 docs -
38 Oldminster Road Sharpness Berkeley Gloucestershire GL13 9US
Erection of two storey rear extension
Granted Householder Extension 9 docsDomestic -
Sharpness Asphalt The Docks Sharpness Berkeley Gloucestershire GL13 9UX
Variation of condition 2 (approved plans) from S.21/2992/FUL - To modify the approved site layout. (Retrospective).
Withdrawn Amendments 6 docs -
Land At Sharpness Docks The Docks Sharpness Gloucestershire
Installation of Asphalt plant and associated structures, stocking areas, administrative offices, weighbridge office, welfare facilities and car and lorry parking
Granted Full applications 16 docs -
Pier View 34 Oldminster Road Sharpness Berkeley Gloucestershire GL13 9NA
Part-conversion of Pier View Hotel to create 4no. self-contained flats (Use Class C3) and retained public house (sui generis), with single-storey rear extension. Erection of 5no. dwellinghouses (Use Class C3), with associated access improvements, parking and landscaping.
Refused Full applications New dwelling Extension 58 docsSeveral homes -
The Dovecote Station Road Sharpness Berkeley Gloucestershire GL13 9UP
80% historically approved · decision due ~12 Oct
Certificate of Lawfulness to demonstrate breach of condition 1 of S.11/0789/COU (use of building)
Awaiting decision Lawful development 6 docs
Other full applications
In Stroud
-
S.26/1872/FUL Awaiting decision
179 Midland Road Stonehouse Gloucestershire GL10 2DT
Demolition of garage and erection of a two storey building, comprising 2no. self-contained flats, with associated parking, access, cycle & bin storage, and landscaping
-
S.26/1837/FUL Awaiting decision
Prince Albert Inn Rodborough Hill Stroud Gloucestershire GL5 3SS
Erection of oak frame pergolas for covered walkway & seating area in pub garden to support solar panels (retrospective)
-
S.26/1858/FUL Awaiting decision
Whitminster Hotel Bristol Road Whitminster Gloucester Gloucestershire GL2 7NY
Conversion of upper floors (C1 Hotels) into six residential units (Class C3).
-
S.26/1846/FUL Awaiting decision
The Venns Sanigar Lane Newtown Berkeley Gloucestershire GL13 9NF
Erection of two dwellings (Class C3).
-
S.26/1744/FUL Awaiting decision
High Hill Farm Inglestone Common Badminton Gloucestershire GL9 1DA
Stationing of a temporary agricultural workers dwelling