Planning application

Church House Oxhill Warwick CV35 0RD

Awaiting decision Stratford-on-Avon 26/00642/LBP Certificate Lawful works to Listed Build

Works: Roofing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Removal of the existing roof covering includng cement pointing to chimneys. Rebuild the roof with like for like materials: Welsh slate timber battens and leadwork. Addition of a new breathable membrane. All salvageable slates will be resued. The work will require the installation of a scaffold. Exisitng materials : Welsh slate, leadwork , timber battens , cement pointing, plastic guttering and down pipes. 1x cast iron down pipe. Proposed materials: Welsh slate, leadwork , timber battens , cement pointing, plastic guttering and down pipes. 1x cast iron down pipe.

As published by the council, reference 26/00642/LBP

Application record

Reference
26/00642/LBP
Type
Certificate Lawful works to Listed Build
Status
Pending Consideration
Received
3 Mar 2026
Validated
3 Mar 2026
Ward
Tysoe
Parish
Oxhill
Postcode
CV35 0RD

Timeline

Dates from the published record

  1. 3 Mar 2026

    Received by Stratford-on-Avon

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stratford-on-Avon took a median of 63 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Stratford-on-Avon for determination, against a statutory target of eight weeks. Over the last year Stratford-on-Avon decided lawful development applications in a median of 55 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

In Stratford-on-Avon

  • 26/01970/LDP Refused

    Gannaway House Gannaway Norton Lindsey Warwick CV35 8JT

    Proposed pitched roof side extension and side dormer window.

    Received 7 Aug, published by the council 4 Sep 2026 Lawful development
  • 26/01745/FUL Granted

    17 Greville Road Alcester B49 5QN

    Single storey rear extension

    Received 13 Jul, published by the council 27 Aug 2026 Lawful development
  • 26/02238/LDP Granted

    17 Greville Road Alcester B49 5QN

    Single storey rear extension

    Received 13 Jul, published by the council 19 Sep 2026 Lawful development
  • 26/02250/LDP Granted

    17 Foster Avenue Studley B80 7QJ

    Construction of Garden Room

    Received 7 Sep, published by the council 25 Sep 2026 Lawful development
  • 26/01967/LDE Granted

    1 The Poplars Poplar Road Napton-on-the-Hill Southam CV47 8NS

    Planning permission was granted under application reference 10/02293/FUL for a two-storey side extension with single-storey rear extension. The permission was subject to a condition requiring the submission and approval of bat mitigation measures prior to commencement. This condition was not discharged before the development was undertaken.

    Received 6 Aug, published by the council 4 Sep 2026 Lawful development