Planning application

222 Saint & Sofia Ltd Tower Bridge Road London Southwark SE1 2UP

Awaiting decision Southwark 26/AP/1485

Works: Demolition Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Listed building consent for the demolition of the existing shopfront at 222 Tower Bridge Road, retaining the central structural column, including removal of the existing double doors, adjacent glazing, and a faux column. The shopfront will be rebuilt with a new double-door system and updated framing, maintaining the original width

As published by the council, reference 26/AP/1485

Application record

Reference
26/AP/1485
Status
Not required
Received
22 May 2026
Validated
12 Jun 2026
Postcode
SE1 2UP

Site history

Applications at this address on the Southwark register

This site has had 2 applications since 2026.

  • 26/AP/1484 Awaiting decision

    222 Saint & Sofia Ltd Tower Bridge Road London Southwark SE1 2UP

    Demolition of the existing shopfront at 222 Tower Bridge Road, including removal of the existing double doors, adjacent glazing, and a faux column, whilst retaining the central structural column. Rebuilding of the shopfront within the original width with a new timber-framed, inward-opening bi-fold/folding door system, with traditional mullion, rail proportions and glazing to match the established shopfront rhythm along Tower Bridge Road. (Amended)

    Submitted 22 May 2026 Full applications

Timeline

Dates from the published record

  1. 22 May 2026

    Received by Southwark

  2. 12 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 7 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 51 days over the applications it decided in the last year.

What happens while it is decided

This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark's median decision took 51 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Southwark's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 224 - 226 Tower Bridge Road London Southwark SE1 2UP

    26/AP/2622 Submitted 4 Sep 2026 0m away

    95% historically approved · decision due ~5 Nov

    Installation of 11 no. external CCTV cameras at sixth-floor terrace level

    Awaiting decision 8 docs
  • Bridge Masters House Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    26/AP/2178 Submitted 23 Jul 2026 0m away

    95% historically approved · decision due ~18 Sep

    Listed building consent for internal alterations - removal of stud partitions installed post construction, and installation of stud partitions and doors

    Decided 10 docs
  • 224A Tower Bridge Road London Southwark SE1 2UP

    26/AP/1963 Submitted 7 Jul 2026 0m away

    95% historically approved · decision due ~20 Oct

    Installation of a lightweight aluminum structure enclosure featuring a motorized glass fully retractable roof, sliding glass windows at the rear of the property

    Awaiting decision Windows or glazing
  • Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    26/AP/2290 Submitted 31 Jul 2026 0m away

    95% historically approved · decision due ~5 Oct

    Temporary advertisement consent to display 1x Pride Progress flag on the high-level footway of Tower Bridge for the month of June 2027 for the next five years ending 2032.

    Awaiting decision
  • 222 Saint & Sofia Ltd Tower Bridge Road London Southwark SE1 2UP

    26/AP/1484 Submitted 22 May 2026 3m away

    91% historically approved · decision due ~4 Aug

    Demolition of the existing shopfront at 222 Tower Bridge Road, including removal of the existing double doors, adjacent glazing, and a faux column, whilst retaining the central structural column. Rebuilding of the shopfront within the original width with a new timber-framed, inward-opening bi-fold/folding door system, with traditional mullion, rail proportions and glazing to match the established shopfront rhythm along Tower Bridge Road. (Amended)

    Awaiting decision Full applications Demolition Windows or glazing 22 docs
  • Part Basement Rear And First Floor And Second Floor 222 Tower Bridge Road London Southwark SE1 2UP

    22/AP/1365 Submitted 14 Apr 2022 4m away

    Change of use of smaller section of basement from storage to office (Class Eg), together with external alterations including installation of a new rear glazed door and sidelight at basement level fronting Horselydown Lane and a new window/door at loft level fronting Tower Bridge Road, and an air source heat pump with welded mesh enclosure within the rear service yard fronting Horselydown Lane and two air source heat pumps on the front roof slope behind existing parapet wall fronting Tower Bridge Road.

    Granted Full applications Windows or glazing 26 docs