Tower Bridge Tower Bridge Road London Southwark SE1 2UP

Granted Southwark 26/AP/2290

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary advertisement consent to display 1x Pride Progress flag on the high-level footway of Tower Bridge for the month of June 2027 for the next five years ending 2032.

As published by the council, reference 26/AP/2290

Application record

Reference
26/AP/2290
Status
Granted
Decision
Granted As published: Advertisement Consent-GRANTED
Received
31 Jul 2026
Validated
10 Aug 2026
Decided
1 Oct 2026
Postcode
SE1 2UP

Site history

Applications at this address on the Southwark register

This site has had 5 applications since 2022: 4 approved, 0 refused.

  • 26/AP/1334 Granted

    Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    Temporary advertisement consent to display 1x Progress Pride flag on the high level footway of Tower Bridge from 1 June 2026 to 30 June 2026.

    Decided 26 Jun 2026 Advertising
  • 25/AP/3213 Awaiting decision

    Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    Certificate of lawfulness (proposed works to a listed building) for additional restoration works associated with the 'Tower Bridge Mud Tanks' project, to include the restoration of a drainage hopper and the addition of a manhole cover

    Submitted 3 Nov 2025 Lawful development
  • 23/AP/2944 Granted

    Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    Overlay the existing roof coverings within a liquid applied waterproofing system; Installation new line safe system; Removal the existing ladder hoops and install new PivotLoc ladders to the control cabins

    Decided 11 Dec 2023 Heritage and listed buildings
  • 22/AP/2007 Granted

    Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    Listed Building Consent for: The extension of the south east staircase handrail connecting Tower Bridge Road and Shad Thames The replacement of the south east cabin door

    Decided 16 Sep 2022 Heritage and listed buildings

Timeline

Dates from the published record

  1. 31 Jul 2026

    Received by Southwark

  2. 10 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. 1 Oct 2026

    Decision issued: Advertisement Consent-GRANTED

  5. 1 Oct 2026

    Status changed to Granted

    Previously Under consideration/assessment.

What this grant of permission means

Southwark granted permission on 1 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Southwark's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • 224 - 226 Tower Bridge Road London Southwark SE1 2UP

    26/AP/2622 Submitted 4 Sep 2026 50 yards away

    95% historically approved · decision due ~5 Nov

    Installation of 11 no. external CCTV cameras at sixth-floor terrace level

    Awaiting decision 8 docs
  • Bridge Masters House Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    26/AP/2178 Submitted 23 Jul 2026 50 yards away

    Listed building consent for internal alterations - removal of stud partitions installed post construction, and installation of stud partitions and doors

    Granted 10 docs
  • 222 Saint & Sofia Ltd Tower Bridge Road London Southwark SE1 2UP

    26/AP/1485 Submitted 22 May 2026 50 yards away

    95% historically approved · decision due ~7 Aug

    Listed building consent for the demolition of the existing shopfront at 222 Tower Bridge Road, retaining the central structural column, including removal of the existing double doors, adjacent glazing, and a faux column. The shopfront will be rebuilt with a new double-door system and updated framing, maintaining the original width

    Awaiting decision Demolition Windows or glazing
  • 224A Tower Bridge Road London Southwark SE1 2UP

    26/AP/1963 Submitted 7 Jul 2026 50 yards away

    Installation of a lightweight aluminum structure enclosure featuring a motorized glass fully retractable roof, sliding glass windows at the rear of the property

    Refused Windows or glazing 15 docs
  • 222 Saint & Sofia Ltd Tower Bridge Road London Southwark SE1 2UP

    26/AP/1484 Submitted 22 May 2026 50 yards away

    90% historically approved · decision due ~4 Aug

    Demolition of the existing shopfront at 222 Tower Bridge Road, including removal of the existing double doors, adjacent glazing, and a faux column, whilst retaining the central structural column. Rebuilding of the shopfront within the original width with a new timber-framed, inward-opening bi-fold/folding door system, with traditional mullion, rail proportions and glazing to match the established shopfront rhythm along Tower Bridge Road. (Amended)

    Awaiting decision Full applications Demolition Windows or glazing 22 docs
  • Part Basement Rear And First Floor And Second Floor 222 Tower Bridge Road London Southwark SE1 2UP

    22/AP/1365 Submitted 14 Apr 2022 50 yards away

    Change of use of smaller section of basement from storage to office (Class Eg), together with external alterations including installation of a new rear glazed door and sidelight at basement level fronting Horselydown Lane and a new window/door at loft level fronting Tower Bridge Road, and an air source heat pump with welded mesh enclosure within the rear service yard fronting Horselydown Lane and two air source heat pumps on the front roof slope behind existing parapet wall fronting Tower Bridge Road.

    Granted Full applications Windows or glazing 26 docs