First Floor Jubilee House The Street Long Stratton Norfolk NR15 2XJ

Awaiting decision South Norfolk Change of Use

Proposal

Change of use of first floor from retail to residential

As published by the council, reference 2025/3878

Timeline

Dates from the published record

  1. 16 Dec 2025

    Received by South Norfolk

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with South Norfolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/3878 Awaiting decision

    First Floor Jubilee House The Street Long Stratton Norfolk NR15 2XJ

    Change of use of first floor from retail to residential

    16 Dec 2025 0m away Full applications
  • 2025/3879 Awaiting decision

    First Floor Jubilee House The Street Long Stratton Norfolk NR15 2XJ

    Change of use of first floor from retail to residential

    16 Dec 2025 0m away Heritage and listed buildings
  • 2025/3879 Awaiting decision

    First Floor Jubilee House The Street Long Stratton Norfolk NR15 2XJ

    Change of use of first floor from retail to residential

    16 Dec 2025 0m away Heritage and listed buildings
  • 2026/0439 Awaiting decision

    The Resource Centre The Street Long Stratton Norfolk NR15 2XJ

    Repairs to roof, timber frame repairs, remove chimney, add new roof lights; remove internal walls, new sway frames, new door in east wall, new glazed porch; at south elevation change existing doors into windows and add three new windows. New internal doorway, new bathroom and east window; install solar panels on lean-to and south facing roof.

    17 Feb 2026 38m away Heritage and listed buildings
  • 2026/0439 Awaiting decision

    The Resource Centre The Street Long Stratton Norfolk NR15 2XJ

    Repairs to roof, timber frame repairs, remove chimney, add new roof lights; remove internal walls, new sway frames, new door in east wall, new glazed porch; at south elevation change existing doors into windows and add three new windows. New internal doorway, new bathroom and east window; install solar panels on lean-to and south facing roof.

    17 Feb 2026 38m away Heritage and listed buildings
  • 2021/2326 Granted

    Cooperative Solar Supermarket The Street Long Stratton Norfolk NR15 2XJ

    Installation of roof mounted solar PV panels

    29 Sep 2021 50m away Outline

In South Norfolk

  • 2026/0754 Granted

    Land Adj The Grove Booton Norfolk

    Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).

    19 Mar 2026 Full applications
  • 2025/2830 Granted

    Land South Of Dairy Farm Burgh Road Wheatacre Norfolk

    Erection of new self build 3-bedroom detached single storey dwelling/farmhouse

    9 Sep 2025 Full applications
  • 2026/0612 Granted

    Land South East Of Easton Road Marlingford Norfolk

    Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project

    27 Feb 2026 Full applications
  • 2026/0861 Granted

    The School House The Street Framingham Earl Norfolk NR14 7QY

    Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations

    26 Mar 2026 Full applications
  • 2026/2106 Awaiting decision

    The Old Vineyard Overwood Lane Forncett St Peter Norfolk

    Construction of 1no. rural worker and self build dwelling.

    21 Jul 2026 Full applications