Planning application
2025/1466
Oldbury Lodge 25 The Turn Hevingham Norfolk NR10 5QP
Proposal
2025/1466Change of use of part of existing garage building to holiday let (retrospective)
As published by the council, reference 2025/1466
Timeline
Dates from the published record
-
14 May 2025
Received by South Norfolk
-
30 May 2025
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with South Norfolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/1466 Awaiting decision
Oldbury Lodge 25 The Turn Hevingham Norfolk NR10 5QP
2025/1466Change of use of part of existing garage building to holiday let (retrospective)
-
2026/1137 Granted
31A The Turn Hevingham Norfolk NR10 5QP
Non-material amendment of 2023/0668 - Internal rearrangement to omit mezzanine storage area & staircase. Relocate kitchen from south elevation to replace with bathroom. Reposition entrance porch more central and make use of existing canopy at new door position. Infill under existing canopy with facing brickwork. Minor adjustments to fenestration and cladding orientation.
-
2026/1137 Granted
31A The Turn Hevingham Norfolk NR10 5QP
Non-material amendment of 2023/0668 - Internal rearrangement to omit mezzanine storage area & staircase. Relocate kitchen from south elevation to replace with bathroom. Reposition entrance porch more central and make use of existing canopy at new door position. Infill under existing canopy with facing brickwork. Minor adjustments to fenestration and cladding orientation.
-
20211065 Granted
White House Farm 35 The Turn Hevingham NR10 5QP
Construction of manege measuring 20m by 40m, extend hardstanding adjacent to stables and new gravel roadway access from the south of the site.
-
20211065 Granted
White House Farm 35 The Turn Hevingham NR10 5QP
Construction of manege measuring 20m by 40m, extend hardstanding adjacent to stables and new gravel roadway access from the south of the site.
-
20021019 Granted
6 The Turn Hevingham
Stable Block
Other full applications applications
In South Norfolk
-
2026/0754 Granted
Land Adj The Grove Booton Norfolk
Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).
-
2025/2830 Granted
Land South Of Dairy Farm Burgh Road Wheatacre Norfolk
Erection of new self build 3-bedroom detached single storey dwelling/farmhouse
-
2026/0612 Granted
Land South East Of Easton Road Marlingford Norfolk
Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project
-
2026/0861 Granted
The School House The Street Framingham Earl Norfolk NR14 7QY
Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations
-
2026/2106 Awaiting decision
The Old Vineyard Overwood Lane Forncett St Peter Norfolk
Construction of 1no. rural worker and self build dwelling.